1VAC30-41-200. Major changes in personnel or equipment or a change of laboratory location.
A. Major change in personnel.
1. The drinking water laboratory shall notify DCLS of a major change in the laboratory's personnel in writing within 30 calendar days of the change.
2. A "major change in personnel" is defined as (i) the loss or replacement of the laboratory director or laboratory supervisor or (ii) the loss of all the trained and experienced analysts who had been available to analyze a particular contaminant for which certification has been granted.
3. DCLS shall follow the procedure in 1VAC30-41-220 to downgrade the laboratory to provisionally certified status if the laboratory fails to notify DCLS within 30 calendar days of a major change in personnel.
B. Change of laboratory location.
1. The laboratory shall notify DCLS of a change in the laboratory's location in writing at least 30 calendar days prior to the location change.
2. DCLS may perform an onsite assessment of the new facility when a laboratory changes location.
3. DCLS shall follow the procedure in 1VAC30-41-220 to downgrade the laboratory to provisionally certified status if the laboratory fails to notify DCLS of a change in the laboratory's location at least 30 days prior to the location change.
C. Equipment.
1. A drinking water laboratory shall notify DCLS in writing within 30 calendar days of a major change in equipment.
2. A drinking water laboratory shall provide the following information to DCLS about new equipment:
a. Make and model of the new instrument.
b. Date of installation and training.
c. Initial demonstration of capability (IDC) and minimum detection limit (MDL).
d. Updated standard operating procedure (SOP).
e. Methods and contaminants for which the instrument will be used.
f. Successful proficiency testing analyzed on the new instrument.
g. Date the instrument was put into service analyzing compliance samples.
3. DCLS shall follow the procedure in 1VAC30-41-220 to downgrade the laboratory to provisionally certified status if the laboratory fails to notify DCLS within 30 calendar days of any major change in equipment.
D. Laboratory action to address major changes to personnel or equipment or a change of location.
1. When a major change to laboratory personnel or equipment or a change of location occurs, the laboratory shall establish a schedule to address the change and provide the schedule in writing to DCLS. The laboratory shall submit the schedule to DCLS along with the notification of the change.
2. If DCLS determines that the laboratory can no longer produce valid data because of the major change in personnel or equipment or the change of location, DCLS shall follow the procedure in 1VAC30-41-240 to revoke certification for the contaminants in question.
Statutory Authority
§§ 2.2-1102 and 2.2-1105 of the Code of Virginia; 42 USC § 300f et seq.
Historical Notes
Derived from Virginia Register Volume 30, Issue 14, eff. May 1, 2014.