LIS

Code of Virginia

Creating a Report: Check the sections you'd like to appear in the report, then use the "Create Report" button at the bottom of the page to generate your report. Once the report is generated you'll then have the option to download it as a pdf, print or email the report.

Code of Virginia
Title 43. Mechanics' and Certain Other Liens
Chapter 1. Mechanics' and Materialmen's Liens
12/23/2024

§ 43-17. Limitation on suit to enforce lien.

No suit to enforce any lien perfected under §§ 43-4, 43-5 and 43-7 to 43-10 shall be brought after six months from the time when the memorandum of lien was recorded or after sixty days from the time the building, structure or railroad was completed or the work thereon otherwise terminated, whichever time shall last occur; provided, however, that the filing of a petition to enforce any such lien in any suit wherein such petition may be properly filed shall be regarded as the institution of a suit under this section; and, provided further, that nothing herein shall extend the time within which such lien may be perfected.

Code 1919, § 6433; 1926, p. 43; 1956, c. 399.

The chapters of the acts of assembly referenced in the historical citation at the end of this section may not constitute a comprehensive list of such chapters and may exclude chapters whose provisions have expired.