12VAC5-590-260. Issuance of the operation permit.
A. Upon receipt of the statement of completion of construction, receipt of all required certifications and test results, inspection by the department to ensure that the project has been satisfactorily completed in accordance with the approved design documents, and verification that bacteriological test results comply with the requirements set forth in Part II of this chapter, as appropriate, the commissioner will issue an operation permit.
B. The owner shall not operate a waterworks without first having obtained an operation permit except as provided in 12VAC5-590-290.
C. The commissioner shall establish the type (community waterworks, NTNC, or TNC), classification, and permitted capacity of the waterworks and specify these on the operation permit. Conditions may be included with the permit for operator, monitoring, and reporting requirements.
Statutory Authority
§§ 32.1-12 and 32.1-170 of the Code of Virginia.
Historical Notes
Derived from VR355-18-003.21 § 1.27, eff. August 1, 1991; amended, Virginia Register Volume 9, Issue 17, eff. June 23, 1993; Volume 37, Issue 20, eff. June 23, 2021.