LIS

Administrative Code

Creating a Report: Check the sections you'd like to appear in the report, then use the "Create Report" button at the bottom of the page to generate your report. Once the report is generated you'll then have the option to download it as a pdf, print or email the report.

Virginia Administrative Code
Title 9. Environment
Agency 25. State Water Control Board
Chapter 875. Virginia Erosion and Stormwater Management Regulation
12/22/2024

9VAC25-875-990. New sources and new discharges.

A. Criteria for new source determination.

1. Except as otherwise provided in an applicable new source performance standard, a source is a new source if the source meets the definition of new source in this chapter and

a. The source is constructed at a site at which no other source is located;

b. The source totally replaces the process or production equipment that causes the discharge of pollutants at an existing source; or

c. The source's processes are substantially independent of an existing source at the same site. In determining whether these processes are substantially independent, the department shall consider such factors as the extent to which the new facility is integrated with the existing plant and the extent to which the new facility is engaged in the same general type of activity as the existing source.

2. A source meeting the requirements of subdivision 1 a, b, or c of this subsection is a new source only if a new source performance standard is independently applicable to it. If there is no such independently applicable standard, the source is a new discharger.

3. Construction on a site at which an existing source is located results in a permit modification subject to 9VAC25-875-1230 rather than a new source (or a new discharger) if the construction does not create a new building, structure, facility, or installation meeting the criteria of subdivision 1 b or c of this subsection but otherwise alters, replaces, or adds to existing process or production equipment.

4. Construction of a new source has commenced if the owner or operator has:

a. Begun, or caused to begin as part of a continuous onsite construction program:

(1) Any placement, assembly, or installation of facilities or equipment; or

(2) Significant site preparation work, including clearing, excavation, or removal of existing buildings, structures, or facilities that is necessary for the placement, assembly, or installation of new source facilities or equipment; or

b. Entered into a binding contractual obligation for the purchase of facilities or equipment that are intended to be used in the new source's operation within a reasonable time. Options to purchase or contracts that can be terminated or modified without substantial loss and contracts for feasibility engineering, and design studies do not constitute a contractual obligation under this subdivision 4 b.

B. Effect of compliance with new source performance standards. The provisions of this subsection do not apply to existing sources that modify the existing sources' pollution control facilities or construct new pollution control facilities and achieve performance standards, but that are neither new sources nor new dischargers or otherwise do not meet the requirements of this subsection.

1. Except as provided in subdivision 2 of this subsection, any new discharger, the construction of which commenced after October 18, 1972, or new source that meets the applicable promulgated new source performance standards before the commencement of discharge may not be subject to any more stringent new source performance standards or to any more stringent technology-based standards under § 301(b)(2) of the CWA for the soonest ending of the following periods:

a. 10 years from the date that construction is completed;

b. 10 years from the date the source begins to discharge process or other nonconstruction related wastewater; or

c. The period of depreciation or amortization of the facility for the purposes of § 167 or 169 (or both) of the Internal Revenue Code of 1954 (26 USC § 167 and 26 USC § 169, respectively).

2. The protection from more stringent standards of performance afforded by subdivision 1 of this subsection does not apply to:

a. Additional or more stringent permit conditions that are not technology based; for example, conditions based on water quality standards, or toxic effluent standards or prohibitions under the State Water Control Law and § 307(a) of the CWA; or

b. Additional permit conditions controlling toxic pollutants or hazardous substances that are not controlled by new source performance standards. This includes permit conditions controlling pollutants other than those identified as toxic pollutants or hazardous substances when control of these pollutants has been specifically identified as the method to control the toxic pollutants or hazardous substances.

3. When a separate VPDES or permit issued to a source with a protection period under subdivision 1 of this subsection will expire on or after the expiration of the protection period, that permit shall require the owner or operator of the source to comply with the requirements of § 301 of the CWA and any other then applicable requirements of the CWA and the State Water Control Law immediately upon the expiration of the protection period. No additional period for achieving compliance with these requirements may be allowed except when necessary to achieve compliance with requirements promulgated less than three years before the expiration of the protection period.

4. The owner or operator of a new source, a new discharger that commenced discharge after August 13, 1979, or a recommencing discharger shall install and have in operating condition and shall start up all pollution control equipment required to meet the conditions of its permits before beginning to discharge. Within the shortest feasible time (not to exceed 90 days), the owner or operator must meet all permit conditions. The requirements of this subdivision do not apply if the owner or operator is issued a permit containing a compliance schedule under 9VAC25-875-1060 A 2.

5. After the effective date of new source performance standards, it shall be unlawful for any owner or operator of any new source to operate the source in violation of those standards applicable to the source.

Statutory Authority

§ 62.1-44.15:28 of the Code of Virginia.

Historical Notes

Derived from Virginia Register Volume 40, Issue 8, eff. July 1, 2024.

Website addresses provided in the Virginia Administrative Code to documents incorporated by reference are for the reader's convenience only, may not necessarily be active or current, and should not be relied upon. To ensure the information incorporated by reference is accurate, the reader is encouraged to use the source document described in the regulation.

As a service to the public, the Virginia Administrative Code is provided online by the Virginia General Assembly. We are unable to answer legal questions or respond to requests for legal advice, including application of law to specific fact. To understand and protect your legal rights, you should consult an attorney.