9VAC5-40-1970. Definitions.
A. For the purpose of these regulations and subsequent amendments or any orders issued by the board, the words or terms shall have the meanings given them in subsection C of this section.
B. As used in this article, all terms not defined here shall have the meanings given them in 9VAC5 Chapter 10 (9VAC5-10-10 et seq.), unless otherwise required by context.
C. Terms defined.
"Coal preparation plant" means any facility (excluding underground mining operations) which prepares coal by one or more of the following processes: breaking, crushing, screening, wet or dry cleaning, and thermal drying.
"Coal processing and conveying equipment" means any machinery used to reduce the size of coal or to separate coal from refuse, and the equipment used to convey coal to or remove coal and refuse from the machinery. This includes, but is not limited to, breakers, crushers, screens and conveyor belts.
"Coal storage system" means any facility used to store coal except for open storage piles.
"Pneumatic coal-cleaning equipment" means any facility which classifies bituminous coal by size or separates bituminous coal from refuse by application of air streams.
"Process operation" means any method, form, action, operation or treatment of manufacturing or processing, including any storage or handling of materials or products before, during or after manufacturing or processing.
"Process unit" means any step in a manufacturing or process operation which results in the emission of pollutants to the atmosphere.
"Process weight" means the total weight of all materials introduced into any process unit which may cause any emission of pollutants. Process weight includes solid fuels charged, but does not include liquid and gaseous fuels charged or combustion air for all fuels.
"Process weight rate" means a rate established as follows:
a. For continuous or long-run steady-state process operations, the total process weight for the entire period of continuous operation or for a typical portion of it, divided by the number of hours of such period or portion of it.
b. For cyclical or batch process operations, the total weight for a period that covers a complete operation or an integral number of cycles, divided by the hours of actual process operation during such a period.
"Thermal drier" means any facility in which the moisture content of bituminous coal is reduced by contact with a heated gas stream which is exhausted to the atmosphere.
"Transfer and loading system" means any facility used to transfer and load coal for shipment.
Statutory Authority
§§ 10.1-1307 and 10.1-1308 of the Code of Virginia.
Historical Notes
Derived from VR120-04-1502, eff. January 1, 1985.