12VAC5-590-250. Statement required upon completion of construction.
A. Upon completion of the construction or modification of the waterworks, the owner shall submit to the department a statement signed by a licensed professional engineer stating that the construction work was completed in accordance with the approved plans and specifications, revised only in accordance with the provisions of 12VAC5-590-240. This statement is called a statement of completion of construction and shall be based upon inspections of the waterworks during and after construction or modifications. These inspections are to be adequate to ensure the truth of the statement of completion of construction.
B. The project documents may require a performance validation report to confirm the design, performance criteria, and appropriate emergency procedures for specific processes and equipment. The project documents may also require operator training. If these requirements are included in the project documents, then the statement of completion of construction shall also include the performance validation report and a certification of successful operator training, as applicable.
Statutory Authority
§§ 32.1-12 and 32.1-170 of the Code of Virginia.
Historical Notes
Derived from VR355-18-003.20 § 1.26, eff. August 1, 1991; amended, Virginia Register Volume 9, Issue 17, eff. June 23, 1993; Volume 37, Issue 20, eff. June 23, 2021.