12VAC5-610-290. Denial of a construction permit.
A. If it is determined that the proposed design is inadequate or that soil, geological or other conditions are such to preclude safe and proper operation of a proposed sewage disposal system or that the installation of the system would create an actual or potential health hazard or nuisance, the permit shall be denied and the owner shall be notified in writing of the basis for the denial. The notification shall also state that the owner has the right to appeal the denial.
B. Construction permits may be denied for new construction to be served by a public water supply system which has reached its permitted capacity.
Statutory Authority
§§ 32.1-12 and 32.1-164 of the Code of Virginia.
Historical Notes
Derived from VR355-34-02 § 2.17, eff. February 5, 1986; amended, eff. May 11, 1988; Virginia Register Volume 16, Issue 16, eff. July 1, 2000.