12VAC5-610-770. Sewer construction.
A. Location. Sewers passing within 50 feet of a nonpublic drinking water supply well or other nonpublic drinking water supply source shall have special construction and pipe materials to provide adequate protection. Special construction constitutes water pipe meeting AWWA specifications, pressure tested (10 feet of water) in place without leakage prior to backfilling. However, under no circumstances shall a sewer come within 10 feet of a nonpublic drinking water supply source.
B. Above grade installation. Sewers constructed above grade shall be adequately supported and protected against freezing. When plastic pipe is used for above grade installation the pipe must be protected against ultraviolet radiation, i.e. shielded against sunlight.
C. Bedding. All sewers shall be bedded to supply uniform support along the length of the sewer.
D. Backfilling and tamping. Sewer trenches shall be backfilled with suitable material free of large stones and clumps of earth and tamped to prevent movement of the sewer as soon as possible after the installation of the sewer has been approved.
Statutory Authority
§§ 32.1-12 and 32.1-164 of the Code of Virginia.
Historical Notes
Derived from VR355-34-02 § 4.12, eff. February 5, 1986; amended, eff. May 11, 1988.