9VAC25-870-65. Water quality compliance.
A. Compliance with the water quality design criteria set out in subdivisions A 1 and A 2 of 9VAC25-870-63 shall be determined by utilizing the Virginia Runoff Reduction Method or another equivalent methodology that is approved by the department.
B. The nonproprietary BMPs listed in this subsection are approved for use in accordance with the Virginia Runoff Reduction Method. Other approved nonproprietary BMPs found on the Virginia Stormwater BMP Clearinghouse Website may also be utilized. Design specifications and the pollutant removal efficiencies for all approved nonproprietary BMPs are found on the Virginia Stormwater BMP Clearinghouse Website.
1. Vegetated Roof (Version 2.3, March 1, 2011);
2. Rooftop Disconnection (Version 1.9, March 1, 2011);
3. Rainwater Harvesting (Version 1.9.5, March 1, 2011);
4. Soil Amendments (Version 1.8, March 1, 2011);
5. Permeable Pavement (Version 1.8, March 1, 2011);
6. Grass Channel (Version 1.9, March 1, 2011);
7. Bioretention (Version 1.9, March 1, 2011);
8. Infiltration (Version 1.9, March 1, 2011);
9. Dry Swale (Version 1.9, March 1, 2011);
10. Wet Swale (Version 1.9, March 1, 2011);
11. Sheet Flow to Filter/Open Space (Version 1.9, March 1, 2011);
12. Extended Detention Pond (Version 1.9, March 1, 2011);
13. Filtering Practice (Version 1.8, March 1, 2011);
14. Constructed Wetland (Version 1.9, March 1, 2011); and
15. Wet Pond (Version 1.9, March 1, 2011).
C. Nonproprietary BMPs differing from those listed in subsection B of this section shall be reviewed and approved by the director in accordance with procedures established by the department.
D. Proprietary BMPs listed on the Virginia Stormwater BMP Clearinghouse Website are approved for use in accordance with the Virginia Runoff Reduction Method. Any proprietary BMP approved for use after July 1, 2020, must meet the requirements of § 62.1-44.15:28 A 9 of the Code of Virginia.
E. A VSMP authority may establish limitations on the use of specific BMPs in accordance with § 62.1-44.15:33 of the Code of Virginia.
F. The VSMP authority shall have the discretion to allow for application of the design criteria to each drainage area of the site. However, where a site drains to more than one HUC, the pollutant load reduction requirements shall be applied independently within each HUC unless reductions are achieved in accordance with a comprehensive watershed stormwater management plan in accordance with 9VAC25-870-92.
G. Offsite alternatives where allowed in accordance with 9VAC25-870-69 may be utilized to meet the design criteria of subsection A of 9VAC25-870-63.
H. Any publicly owned treatment works that is permitted under the watershed general VPDES permit pursuant to § 62.1-44.19:14 of the Code of Virginia and is constructing or expanding the treatment works, wastewater collection system, or other facility used for public wastewater utility operations may, in accordance with § 62.1-44.19:21.2 C of the Code of Virginia, permanently retire a portion of its wasteload allocation to meet the design criteria of subsection A of 9VAC25-870-63. Notice shall be given by such applicant to the VSMP authority and to the department.
Statutory Authority
§§ 62.1-44.15:25 and 62.1-44.15:28 of the Code of Virginia.
Historical Notes
Former 4VAC50-60-65 derived from Virginia Register Volume 27, Issue 26, eff. September 13, 2011; amended, Virginia Register Volume 29, Issue 4, eff. November 21, 2012; amended and renumbered, Virginia Register Volume 30, Issue 2, eff. October 23, 2013; amended, Virginia Register Volume 30, Issue 24, eff. July 1, 2014; Volume 37, Issue 5, eff. November 25, 2020; Volume 38, Issue 25, eff. August 31, 2022.