Part XIII. Fees

9VAC25-870-700. Purpose.

Sections 62.1-44.15:28 and 62.1-44.15:31 of the Code of Virginia authorize the establishment of a statewide fee schedule, including administrative charges for state agencies, for stormwater management for land-disturbing activities and for municipal separate storm sewer systems. This part establishes the fee assessment and the collection and distribution systems for those fees. The fees shall be established for individual permits or coverage under the General Permit for Discharges of Stormwater from Construction Activities (state permits for stormwater management for land-disturbing activities) to cover all costs associated with the implementation of a VSMP by a VSMP authority that has been approved by the board and by the department. Such fee attributes include the costs associated with plan review, registration statement review, permit issuance, state-coverage verification, inspections, reporting, database management, and compliance activities associated with the land-disturbing activities as well as for program oversight costs. Fees shall also be established for state permit maintenance, modification, and transfer.

Fees collected pursuant to this part shall be in addition to any general fund appropriations made to the department or other supporting revenue from a VSMP; however, the fees shall be set at a level sufficient for the department and the VSMP authority to fully carry out their responsibilities under the Act, this chapter, local ordinances, or standards and specifications where applicable.

When establishing a VSMP, the VSMP authority shall assess the statewide fee schedule and shall have the authority to reduce or increase such fees, and to consolidate such fees with other program-related charges, but in no case shall such fee changes affect the amount established in 9VAC25-870-820 as available to the department for program oversight responsibilities pursuant to § 62.1-44.15:28 A 5 a of the Code of Virginia. Accordingly, should a VSMP authority demonstrate to the board its ability to fully and successfully implement a VSMP without a full implementation of the fees set out in this part, the board may authorize the administrative establishment of a lower fee for that program provided that such reduction shall not reduce the amount of fees due to the department for its program oversight and shall not affect the fee schedules set forth herein.

A VSMP authority may establish greater fees than those base fees specified by this part should it be demonstrated to the board that such greater fees are necessary to properly administer the VSMP. Any fee increases established by the VSMP authority beyond those base fees established in this part shall not be subject to the fee distribution formula set out in 9VAC25-870-780. Nothing in this part shall prohibit a locality from establishing other local fees authorized by the Code of Virginia related to stormwater management within their jurisdictions.

A VSMP's portion of the fees shall be used solely to carry out the VSMP's responsibilities under the Act, this chapter, ordinances, or annual standards and specifications.

As part of its program oversight, the department shall periodically assess the revenue generated by both the VSMP authorities and the department to ensure that the fees have been appropriately set and the fees may be adjusted through periodic regulatory actions should significant deviations become apparent.

Statutory Authority

§§ 62.1-44.15:25 and 62.1-44.15:28 of the Code of Virginia.

Historical Notes

Former 4VAC50-60-700 derived from Virginia Register Volume 21, Issue 3, eff. January 29, 2005; amended, Volume 29, Issue 4, eff. November 21, 2012; amended and renumbered, Virginia Register Volume 30, Issue 2, eff. October 23, 2013.

9VAC25-870-720. Authority.

The authority for this part is §§ 62.1-44.15:28 and 62.1-44.15:29 of the Code of Virginia.

Statutory Authority

§§  62.1-44.15:25 and 62.1-44.15:28 of the Code of Virginia.

Historical Notes

Former 4VAC50-60-720 derived from Virginia Register Volume 21, Issue 3, eff. January 29, 2005; amended, Virginia Register Volume 26, Issue 9, eff. February 3, 2010; amended and renumbered, Virginia Register Volume 30, Issue 2, eff. October 23, 2013.

9VAC25-870-730. Applicability.

A. This part applies to:

1. All persons seeking coverage of a MS4 under a new state permit. The fee due shall be as specified under 9VAC25-870-800.

2. All operators who request that an existing MS4 individual permit be modified, except as specifically exempt under 9VAC25-870-740. The fee due shall be as specified under 9VAC25-870-810.

3. All persons seeking coverage under the General Permit for Discharges of Stormwater From Construction Activities or a person seeking an Individual Permit for Discharges of Stormwater From Construction Activities. The fee due shall be as specified under 9VAC25-870-820.

4. All state permittees who request modifications to or transfers of their existing registration statement for coverage under a General Permit for Discharges of Stormwater From Construction Activities or of an Individual Permit for Discharges of Stormwater From Construction Activities. The fee due shall be as specified under 9VAC25-870-825 in addition to any additional fees necessary pursuant to 9VAC25-870-820 due to an increase in acreage.

5. Reinspection fees assessed by the department to recoup the costs associated with each visit to a land-disturbing project site that was necessary to check on the status of project site items noted to be in noncompliance and documented as such on a prior project inspection. The fee due shall be as specified under 9VAC25-870-790.

6. Business transaction costs assessed associated with processing credit card payments.

B. Persons who are applicants for an individual Municipal Separate Stormwater Sewer System permit as a result of existing state permit revocation shall be considered an applicant for a new state permit. The fee due shall be as specified under 9VAC25-870-800.

Persons whose coverage under the General Permit for Discharges of Stormwater From Construction Activities has been revoked shall reapply for an Individual Permit for Discharges of Stormwater From Construction Activities. The fee due shall be as specified under 9VAC25-870-820.

C. State and state permit coverage maintenance fees may apply to each state permit holder. The fee due shall be as specified under 9VAC25-870-830.

Statutory Authority

§§  62.1-44.15:25 and 62.1-44.15:28 of the Code of Virginia.

Historical Notes

Former 4VAC50-60-730 derived from Virginia Register Volume 21, Issue 3, eff. January 29, 2005; amended, Virginia Register Volume 26, Issue 9, eff. February 3, 2010; Volume 29, Issue 4, eff. November 21, 2012; amended and renumbered, Virginia Register Volume 30, Issue 2, eff. October 23, 2013.

9VAC25-870-740. Exemptions.

A. No state permit application fees will be assessed to:

1. State permittees who request minor modifications to state permits as defined in 9VAC25-870-10 or other minor amendments at the discretion of the VSMP authority.

2. State permittees whose state permits are modified or amended at the request of the VSMP authority or department by the board. This does not include errors in the registration statement identified by the VSMP authority, department, or board or errors related to the acreage of the site.

B. State permit modifications at the request of the state permittee resulting in changes to stormwater management plans that require additional review by the VSMP authority shall not be exempt pursuant to this section and shall be subject to fees specified under 9VAC25-870-825.

Statutory Authority

§§  62.1-44.15:25 and 62.1-44.15:28 of the Code of Virginia.

Historical Notes

Former 4VAC50-60-740 derived from Virginia Register Volume 21, Issue 3, eff. January 29, 2005; amended, Virginia Register Volume 26, Issue 9, eff. February 3, 2010; Volume 29, Issue 4, eff. November 21, 2012; amended and renumbered, Virginia Register Volume 30, Issue 2, eff. October 23, 2013.

9VAC25-870-750. Due dates for state permits.

A. Requests for a state permit, state permit modification, or general permit coverage shall not be processed until the fees required pursuant to this part are paid in accordance with 9VAC25-870-760.

B. Individual permit or general permit coverage maintenance fees shall be paid annually to the department or the VSMP authority, as applicable. No state permit will be reissued or automatically continued without payment of the required fee. Individual permit or general permit coverage maintenance fees shall be applied until a Notice of Termination is effective.

Permit maintenance fees for MS4 individual permits or MS4 general permit coverages are due by October 1 of each year. Effective April 1, 2014, any operator whose permit or general permit coverage (including operators whose permits or general permit coverages have been administratively continued) is effective as of April 1 of any given year shall pay the permit maintenance fee or fees to the department or the VSMP authority by October 1 of that same year.

Permit maintenance fees for discharges of stormwater from construction activities pursuant to 9VAC25-870-830 are due by April 1 of each year. After approval of a VSMP authority, including the department when acting in that capacity, any owner whose permit or general permit coverage authorizing discharges of stormwater from construction activities (including owners whose permits or general permit coverages have been administratively continued) is effective as of the effective date of the VSMP authority shall pay the permit maintenance fee or fees to the department or the VSMP authority by April 1 of that same year.

Statutory Authority

§§  62.1-44.15:25 and 62.1-44.15:28 of the Code of Virginia.

Historical Notes

Former 4VAC50-60-750 derived from Virginia Register Volume 21, Issue 3, eff. January 29, 2005; amended, Virginia Register Volume 26, Issue 9, eff. February 3, 2010; Volume 29, Issue 4, eff. November 21, 2012; amended and renumbered, Virginia Register Volume 30, Issue 2, eff. October 23, 2013.

9VAC25-870-760. Method of payment.

A. Fees shall be collected utilizing, where practicable, an online payment system. Until such system is operational, fees, as applicable, shall be, at the discretion of the department, submitted electronically or be paid by check, draft or postal money order payable to:

1. The Treasurer of Virginia, for a MS4 individual or general permit or for a coverage issued by the department under the General Permit for Discharges of Stormwater from Construction Activities or Individual Permit for Discharges of Stormwater from Construction Activities, and must be in U.S. currency, except that agencies and institutions of the Commonwealth of Virginia may submit Interagency Transfers for the amount of the fee. The Department of Environmental Quality may provide a means to pay fees electronically. Fees not submitted electronically shall be sent to the Virginia Department of Environmental Quality.

2. The VSMP authority, for VSMP operational costs of the VSMP authority under the General Permit for Discharges of Stormwater from Construction Activities, and must be in U.S. currency.

B. When fees are collected electronically pursuant to this part through credit cards, business transaction costs associated with processing such payments may be additionally assessed.

C. Nothing in this part shall prohibit the department and a VSMP authority from entering into an agreement whereby the total fee to be paid by the applicant for coverage under the General Permit for Discharges of Stormwater from Construction Activities is payable to the VSMP authority, and the VSMP authority transmits the department's portion set forth in 9VAC25-870-820 to the department on a schedule established by the department.

D. Required information for state permits or state permit coverage. All applicants, unless otherwise specified by the department, shall submit the following information along with the fee payment or utilize the department Permit Application Fee Form:

1. Applicant name, address and daytime phone number.

2. The name of the facility/activity, and the facility/activity location.

3. The type of state permit applied for.

4. Whether the application is for a new state permit issuance, state permit reissuance, state permit maintenance, or state permit modification.

5. The amount of fee submitted.

6. The existing state permit number, if applicable.

7. Other information as required by the VSMP authority.

Statutory Authority

§§ 62.1-44.15:25 and 62.1-44.15:28 of the Code of Virginia.

Historical Notes

Former 4VAC50-60-760 derived from Virginia Register Volume 21, Issue 3, eff. January 29, 2005; amended, Virginia Register Volume 26, Issue 9, eff. February 3, 2010; Volume 29, Issue 4, eff. November 21, 2012; amended and renumbered, Virginia Register Volume 30, Issue 2, eff. October 23, 2013; amended, Volume 30, Issue 11, eff. February 26, 2014.

9VAC25-870-770. Incomplete and late payments.

All incomplete payments will be deemed as nonpayments. The department or the VSMP authority, as applicable, shall provide notification to the state applicant of any incomplete payments.

Interest may be charged for late payments at the underpayment rate set forth in § 58.1-15 of the Code of Virginia and is calculated on a monthly basis at the applicable periodic rate.

A 10% late payment fee shall be charged to any delinquent (over 90 days past due) account.

The department and the VSMP authority are entitled to all remedies available under the Code of Virginia in collecting any past due amount.

Statutory Authority

§§  62.1-44.15:25 and 62.1-44.15:28 of the Code of Virginia.

Historical Notes

Former 4VAC50-60-770 derived from Virginia Register Volume 21, Issue 3, eff. January 29, 2005; amended, Virginia Register Volume 26, Issue 9, eff. February 3, 2010; Volume 29, Issue 4, eff. November 21, 2012; amended and renumbered, Virginia Register Volume 30, Issue 2, eff. October 23, 2013.

9VAC25-870-780. Deposit and use of fees.

A. All fees collected by the department or board pursuant to this chapter shall be deposited into the Virginia Stormwater Management Fund and shall be used and accounted for as specified in § 62.1-44.15:29 of the Code of Virginia. Fees collected by the department or board shall be exempt from statewide indirect costs charged and collected by the Department of Accounts.

B. All fees collected by a VSMP authority pursuant to this chapter shall be subject to accounting review and shall be used solely to carry out the VSMP authority's responsibilities pursuant to the Act, Part II and Part III A of this chapter, local ordinances, or annual standards and specifications.

Pursuant to subdivision A 5 a of § 62.1-44.15:28 of the Code of Virginia, whenever the board has authorized the administration of a VSMP by a VSMP authority, 28% of the total revenue generated by the statewide stormwater management fees collected in accordance with 9VAC25-870-820 shall be remitted on a schedule determined by the department to the State Treasurer for deposit in the Virginia Stormwater Management Fund unless otherwise collected electronically. If the VSMP authority waives or reduces any fee due in accordance with 9VAC25-870-820, the VSMP authority shall remit the 28% portion that would be due to the Virginia Stormwater Management Fund if such fee were charged in full. Any fee increases established by the VSMP authority beyond the base fees established in this part shall not be subject to the fee distribution formula.

Statutory Authority

§§  62.1-44.15:25 and 62.1-44.15:28 of the Code of Virginia.

Historical Notes

Former 4VAC50-60-780 derived from Virginia Register Volume 21, Issue 3, eff. January 29, 2005; amended, Virginia Register Volume 26, Issue 9, eff. February 3, 2010; Volume 29, Issue 4, eff. November 21, 2012; amended and renumbered, Virginia Register Volume 30, Issue 2, eff. October 23, 2013.

9VAC25-870-790. General.

A. The fees for individual permits, general permit coverage, state permit or registration statement modification, or state permit transfers are considered separate actions and shall be assessed a separate fee, as applicable.

B. Until July 1, 2014, the department is authorized to assess a $125 reinspection fee for each visit to a project site that was necessary to check on the status of project site items noted to be in noncompliance and documented as such on a prior project inspection.

Statutory Authority

§§  62.1-44.15:25 and 62.1-44.15:28 of the Code of Virginia.

Historical Notes

Former 4VAC50-60-790 derived from Virginia Register Volume 21, Issue 3, eff. January 29, 2005; amended, Virginia Register Volume 26, Issue 9, eff. February 3, 2010; Volume 29, Issue 4, eff. November 21, 2012; renumbered, Virginia Register Volume 30, Issue 2, eff. October 23, 2013.

9VAC25-870-800. Fee schedules for municipal separate storm sewer system new state permit issuance.

The following fee schedule applies to state permit applications for issuance of a new individual municipal separate storm sewer system permit or coverage under a MS4 General Permit. All regulated MS4s that apply for joint coverage under an individual permit or general permit registration shall each pay the appropriate fees set out below.

Municipal Stormwater / MS4 Individual (Large and Medium)

$16,000

Municipal Stormwater / MS4 Individual (Small)

$8,000

Municipal Stormwater / MS4 General Permit (Small)

$4,000

Statutory Authority

§§  62.1-44.15:25 and 62.1-44.15:28 of the Code of Virginia.

Historical Notes

Former 4VAC50-60-800 derived from Virginia Register Volume 21, Issue 3, eff. January 29, 2005; amended, Virginia Register Volume 26, Issue 9, eff. February 3, 2010; Volume 29, Issue 4, eff. November 21, 2012; renumbered, Virginia Register Volume 30, Issue 2, eff. October 23, 2013.

9VAC25-870-810. Fee schedules for major modification of MS4 individual permits requested by the operator.

The following fee schedule applies to state applications for major modification of an individual MS4 permit requested by the state permittee:

Municipal Stormwater / MS4 Individual (Large and Medium)

$5,000

Municipal Stormwater / MS4 Individual (Small)

$2,500

Statutory Authority

§§  62.1-44.15:25 and 62.1-44.15:28 of the Code of Virginia.

Historical Notes

Former 4VAC50-60-810 derived from Virginia Register Volume 21, Issue 3, eff. January 29, 2005; amended, Virginia Register Volume 26, Issue 9, eff. February 3, 2010; Volume 29, Issue 4, eff. November 21, 2012; renumbered, Virginia Register Volume 30, Issue 2, eff. October 23, 2013.

9VAC25-870-820. Fees for an individual permit or coverage under the General Permit for Discharges of Stormwater from Construction Activities.

The following fees apply, until June 30, 2014, to coverage under the General Permit for Discharges of Stormwater from Construction Activities issued by the department prior to a VSMP authority being approved by the board in the area where the applicable land-disturbing activity is located, or where the department has issued an individual permit or coverage under the General Permit for Discharges of Stormwater from Construction Activities for a state or federal agency.

General / Stormwater Management - Phase I Land Clearing (Large Construction Activity - Sites or common plans of development equal to or greater than five acres)

$750

General / Stormwater Management - Phase II Land Clearing (Small Construction Activity - Sites or common plans of development equal to or greater than one acre and less than five acres)

$450

General / Stormwater Management - Small Construction Activity/Land Clearing (Sites within designated areas of Chesapeake Bay Act localities with land disturbance acreage equal to or greater than 2,500 square feet and less than one acre)
(Fee valid until July 1, 2014)

$200

Individual Permit for Discharges of Stormwater from Construction Activities

$15,000

The following total fees to be paid by an applicant apply to (i) any operator seeking coverage under a July 1, 2014, General Permit for Discharges of Stormwater from Construction Activities or (ii) on or after July 1, 2014, to any operator seeking coverage under a General Permit for Discharges of Stormwater from Construction Activities, a state or federal agency that does not file annual standards and specifications, or an individual permit issued by the board. On and after approval by the board of a VSMP authority for coverage under the General Permit for Discharges of Stormwater from Construction Activities, no more than 50% of the total fee to be paid by an applicant set out in this part shall be due at the time that a stormwater management plan or an initial stormwater management plan is submitted for review in accordance with 9VAC25-870-108. The remaining total fee balance to be paid by an applicant shall be due prior to the issuance of coverage under the General Permit for Discharges of Stormwater from Construction Activities.

When a site or sites are purchased for development within a previously permitted common plan of development or sale, the applicant shall be subject to fees ("total fee to be paid by applicant" column) in accordance with the disturbed acreage of their site or sites according to the following table.

Fee type

Total fee to be paid by applicant (includes both VSMP authority and department portions where applicable)

Department portion of "total fee to be paid by applicant" (based on 28% of total fee paid*)

Chesapeake Bay Preservation Act Land-Disturbing Activity (not subject to General Permit coverage; sites within designated areas of Chesapeake Bay Act localities with land-disturbance acreage equal to or greater than 2,500 square feet and less than one acre)

$290

$0

General / Stormwater Management - Small Construction Activity/Chesapeake Bay Preservation Act Land-Disturbing Activity (not subject to General Permit coverage)/Land Clearing (Single-family detached residential structures within or outside a common plan of development or sale with land-disturbance acreage less than five acres)

$209

$0

General / Stormwater Management - Small Construction Activity/Land Clearing (Areas within common plans of development or sale with land-disturbance acreage less than one acre, except for single-family detached residential structures)

$290

$81

General / Stormwater Management - Small Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than one acre and less than five acres)

$2,700

$756

General / Stormwater Management - Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than five acres and less than 10 acres)

$3,400

$952

General / Stormwater Management - Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 10 acres and less than 50 acres)

$4,500

$1,260

General / Stormwater Management - Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 50 acres and less than 100 acres)

$6,100

$1,708

General / Stormwater Management - Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 100 acres)

$9,600

$2,688

Individual Permit for Discharges of Stormwater from Construction Activities (This will be administered by the department)

$15,000

$15,000

* If the project is completely administered by the department such as may be the case for a state or federal project or projects covered by individual permits, the entire applicant fee shall be paid to the department.

The following fees apply, on or after July 1, 2014, to coverage under the General Permit for Discharges of Stormwater from Construction Activities issued by the board for a state or federal agency that has annual standards and specifications approved by the board.

General / Stormwater Management - Phase I Land Clearing (Large Construction Activity - Sites or common plans of development equal to or greater than five acres)

$750

General / Stormwater Management - Phase II Land Clearing (Small Construction Activity - Sites or common plans of development equal to or greater than one acre and less than five acres)

$450

Statutory Authority

§§  62.1-44.15:25 and 62.1-44.15:28 of the Code of Virginia.

Historical Notes

Former 4VAC50-60-820 derived from Virginia Register Volume 21, Issue 3, eff. January 29, 2005; amended, Virginia Register Volume 26, Issue 9, eff. February 3, 2010; Volume 29, Issue 4, eff. November 21, 2012; amended and renumbered, Virginia Register Volume 30, Issue 2, eff. October 23, 2013; amended, Virginia Register Volume 30, Issue 11, eff. February 26, 2014; Volume 30, Issue 24, eff. July 1, 2014.

9VAC25-870-825. Fees for the modification or transfer of individual permits or of registration statements for the General Permit for Discharges of Stormwater from....

The following fees apply to modification or transfer of individual permits or of registration statements for the General Permit for Discharges of Stormwater from Construction Activities issued by the board. If the state permit modifications result in changes to stormwater management plans that require additional review by the VSMP authority, such reviews shall be subject to the fees set out in this section. The fee assessed shall be based on the total disturbed acreage of the site. In addition to the state permit modification fee, modifications resulting in an increase in total disturbed acreage shall pay the difference in the initial state permit fee paid and the state permit fee that would have applied for the total disturbed acreage in 9VAC25-870-820. No modification or transfer fee shall be required until such board-approved programs exist. These fees shall only be effective when assessed by a VSMP authority, including the department when acting in that capacity, that has been approved by the board. No modification fee shall be required for the General Permit for Discharges of Stormwater from Construction Activities for a state or federal agency that is administering a project in accordance with approved annual standards and specifications but shall apply to all other state or federal agency projects.

General / Stormwater Management – Small Construction Activity/Land Clearing (Areas within common plans of development or sale with land-disturbance acreage less than one acre, except for single-family detached residential structures)

$20

General / Stormwater Management – Small Construction Activity/Chesapeake Bay Preservation Act Land-Disturbing Activity (not subject to General Permit coverage)/Land Clearing (Single-family detached residential structures within or outside a common plan of development or sale with land-disturbance acreage less than five acres where the locality is the VSMP authority)

$20

General / Stormwater Management – Small Construction Activity/Land Clearing (Single-family detached residential structures within or outside a common plan of development or sale with land-disturbance acreage less than five acres where the department is the VSMP authority)

$0

General / Stormwater Management – Small Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than one and less than five acres)

$200

General / Stormwater Management – Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than five acres and less than 10 acres)

$250

General / Stormwater Management – Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 10 acres and less than 50 acres)

$300

General / Stormwater Management – Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 50 acres and less than 100 acres)

$450

General / Stormwater Management – Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 100 acres)

$700

Individual Permit for Discharges of Stormwater from Construction Activities

$5,000

Statutory Authority

§§  62.1-44.15:25 and 62.1-44.15:28 of the Code of Virginia.

Historical Notes

Former 4VAC50-60-825 Derived from Virginia Register Volume 26, Issue 9, eff. February 3, 2010; amended, Volume 29, Issue 4, eff. November 21, 2012; amended and renumbered, Virginia Register Volume 30, Issue 2, eff. October 23, 2013; amended, Virginia Register Volume 30, Issue 11, eff. February 26, 2014; amended, Volume 30, Issue 24, eff. July 1, 2014.

9VAC25-870-830. State permit maintenance fees.

The following annual permit maintenance fees apply to each state permit identified below, including expired state permits that have been administratively continued. With respect to the General Permit for Discharges of Stormwater from Construction Activities, these fees shall apply until the state permit coverage is terminated, and shall only be effective when assessed by a VSMP authority including the department when acting in that capacity that has been approved by the board. No maintenance fee shall be required for a General Permit for Discharges of Stormwater from Construction Activities until such board approved programs exist. No maintenance fee shall be required for the General Permit for Discharges of Stormwater from Construction Activities for a state or federal agency that is administering a project in accordance with approved annual standards and specifications but shall apply to all other state or federal agency projects. All regulated MS4s who are issued joint coverage under an individual permit or general permit registration shall each pay the appropriate fees set out below:

Municipal Stormwater / MS4 Individual (Large and Medium)

$8,800

Municipal Stormwater / MS4 Individual (Small)

$6,000

Municipal Stormwater / MS4 General Permit (Small)

$3,000

Chesapeake Bay Preservation Act Land-Disturbing Activity (not subject to General Permit coverage; sites within designated areas of Chesapeake Bay Act localities with land-disturbance acreage equal to or greater than 2,500 square feet and less than 1 acre)

$50

General / Stormwater Management – Small Construction Activity/Land Clearing (Areas within common plans of development or sale with land-disturbance acreage less than one acre, except for single-family detached residential structures)

$50

General / Stormwater Management – Small Construction Activity/Chesapeake Bay Preservation Act Land-Disturbing Activity (not subject to General Permit coverage)/Land Clearing (Single-family detached residential structures within or outside a common plan of development or sale with land-disturbance acreage less than five acres where the locality is the VSMP authority)

$50

General / Stormwater Management – Small Construction Activity/Land Clearing (Single-family detached residential structures within or outside a common plan of development or sale with land-disturbance acreage less than five acres where the department is the VSMP authority)

$0

General / Stormwater Management – Small Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance equal to or greater than one acre and less than five acres)

$400

General / Stormwater Management – Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than five acres and less than 10 acres)

$500

General / Stormwater Management – Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 10 acres and less than 50 acres)

$650

General / Stormwater Management – Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater than 50 acres and less than 100 acres)

$900

General / Stormwater Management – Large Construction Activity/Land Clearing (Sites or areas within common plans of development or sale with land-disturbance acreage equal to or greater 100 acres)

$1,400

Individual Permit for Discharges from Construction Activities

$3,000

Statutory Authority

§§  62.1-44.15:25 and 62.1-44.15:28 of the Code of Virginia.

Historical Notes

Former 4VAC50-60-830 derived from Virginia Register Volume 21, Issue 3, eff. January 29, 2005; amended, Virginia Register Volume 26, Issue 9, eff. February 3, 2010; Volume 29, Issue 4, eff. November 21, 2012; renumbered, Virginia Register Volume 30, Issue 2, eff. October 23, 2013; amended, Virginia Register Volume 30, Issue 24, eff. July 1, 2014.

Website addresses provided in the Virginia Administrative Code to documents incorporated by reference are for the reader's convenience only, may not necessarily be active or current, and should not be relied upon. To ensure the information incorporated by reference is accurate, the reader is encouraged to use the source document described in the regulation.

As a service to the public, the Virginia Administrative Code is provided online by the Virginia General Assembly. We are unable to answer legal questions or respond to requests for legal advice, including application of law to specific fact. To understand and protect your legal rights, you should consult an attorney.