LIS

Administrative Code

Virginia Administrative Code
10/10/2024

Part IV. General Permit Terms and Conditions for an Affected Unit Using Fuel Throughput for Compliance Demonstration

9VAC5-530-140. General permit.

A. Any owner whose application is approved by the director shall receive the following general permit and shall comply with the requirements in it and be subject to all requirements of this chapter and the regulations of the board.

B. In compliance with the provisions of the Virginia Air Pollution Control Law and regulations adopted pursuant to it, owners of affected units are authorized to operate under the authority of this general permit, except those where board regulations or policies prohibit such operation.

C. The authorization to operate under this general permit shall be in accordance with the cover letter to this general permit, 9VAC5-530-150 (General terms and conditions), 9VAC5-530-160 (Monitoring requirements) 9VAC5-530-170 (Operating limits), 9VAC5-530-180 (Emissions limits), 9VAC5-530-190 (Testing requirements), 9VAC5-530-200 (Recordkeeping requirements), and 9VAC5-530-210 (Reporting requirements).

Statutory Authority

§§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.

Historical Notes

Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.

9VAC5-530-150. General terms and conditions.

A. The owner is authorized to operate an affected unit located within the boundaries of the Commonwealth of Virginia in accordance with the approved general permit application and conditions of this general permit except where board regulations or policies prohibit such activities.

B. The owner shall comply with the terms and conditions of this general permit prior to commencing any physical or operational change or activity that will result in making the source subject to the new source review program.

Statutory Authority

§§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.

Historical Notes

Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.

9VAC5-530-160. Monitoring requirements.

A. The owner shall install and use a fuel flow meter to monitor the fuel throughput for each affected unit, calculated monthly as the sum of each consecutive 12-month period.

B. Each fuel flow meter shall be installed, maintained, calibrated, and operated in accordance with approved procedures which shall include, as a minimum, the manufacturer's written requirements or recommendations.

C. The fuel flow meter used to continuously measure the fuel throughput for each affected unit shall be observed by the owner with a frequency of not less than once per month. The owner shall keep a log of the observations from the fuel flow meter.

Statutory Authority

§§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.

Historical Notes

Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.

9VAC5-530-170. Operating limits.

A. The approved fuels for each CI affected unit are diesel fuel, biodiesel fuel, and biodiesel blends. These fuels shall meet the following specifications:

1. Diesel fuel that meets the ASTM D975-10b specification for S15 diesel fuel oil; maximum sulfur content per shipment, 0.0015%.

2. Biodiesel fuel that meets ASTM specification D6751-09; maximum sulfur content per shipment, 0.0015%.

B. The approved fuels for each SI affected unit are natural gas and liquid petroleum gas (LPG). These fuels shall meet the following specifications:

1. Natural gas with a minimum heat content of 1,000 Btu/scf HHV as determined by ASTM D1826-94 (Reapproved 2010), ASTM D4809-09a, or an equivalent method approved by the department.

2. LPG, including butane and propane, that meets ASTM specification D1835-05, or an equivalent method approved by the department.

C. The combined CI affected unit or units located in either an attainment or nonattainment area, shall consume no more than 502,766 gallons of diesel fuel or 554,230 gallons of biodiesel fuel per year, calculated monthly as the sum of each consecutive 12-month period.

1. Compliance for the consecutive 12-month period shall be demonstrated monthly by adding the total for the most recently completed calendar month to the individual monthly totals for the preceding 11 months.

2. For affected units using any combination of the two fuels, the quantities of diesel oil and biodiesel, calculated monthly as the sum of each consecutive 12-month period, shall not exceed values that will allow the following equation to hold true:

A x (140,000 Btu/gal) + B x (127,000 Btu/gal) ≤ 70,387 x 106 Btu/yr

where:

A = Number of gallons of diesel fuel burned during any consecutive 12-month period.

B = Number of gallons of biodiesel burned during any consecutive 12-month period.

D. The combined SI affected unit or units located in an attainment area shall consume no more than 775,300 gallons of LPG or 72.88 x 106 cubic feet of natural gas per year, calculated monthly as the sum of each consecutive 12-month period.

1. Compliance for the consecutive 12-month period shall be demonstrated monthly by adding the total for the most recently completed calendar month to the individual monthly totals for the preceding 11 months.

2. For affected units using any combination of the two fuels, the quantities of natural gas and LPG, calculated monthly as the sum of each consecutive 12-month period, shall not exceed values that will allow the following equation to hold true:

A x (1,000 Btu/ft3) + B x (94,000 Btu/gal) ≤ 72,878 x 106 Btu/yr

where:

A = Number of cubic feet of natural gas burned during any consecutive 12-month period.

B = Number of gallons of LPG burned during any consecutive 12-month period.

E. The combined SI affected unit or units located in a nonattainment area shall consume no more than 480,032 gallons of LPG or 45.12 x 106 cubic feet of natural gas per year, calculated monthly as the sum of each consecutive 12-month period.

1. Compliance for the consecutive 12-month period shall be demonstrated monthly by adding the total for the most recently completed calendar month to the individual monthly totals for the preceding 11 months.

2. For affected units using any combination of the two fuels, the quantities of natural gas and LPG, calculated monthly as the sum of each consecutive 12-month period, shall not exceed values that will allow the following equation to hold true:

A x (1,000 Btu/ft3) + B x (94,000 Btu/gal) ≤ 45,123 x 106 Btu/yr

where:

A = Number of cubic feet of natural gas burned during any consecutive 12-month period.

B = Number of gallons of LPG burned during any consecutive 12-month period.

F. For affected units using diesel fuel or biodiesel fuel, the owner shall obtain a certification from the fuel supplier with each shipment of diesel fuel or biodiesel fuel. Each fuel supplier certification shall include the following:

1. The name of the fuel supplier;

2. The date on which the diesel fuel or biodiesel was received;

3. The quantity of diesel fuel or biodiesel delivered in the shipment;

4. A statement that the diesel fuel complies with the American Society for Testing and Materials specifications (ASTM D975-10b);

5. A statement that the biodiesel fuel complies with the American Society for Testing and Materials specifications (ASTM D6751-09); and

6. The sulfur content of the diesel fuel or biodiesel fuel.

Statutory Authority

§§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.

Historical Notes

Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.

9VAC5-530-180. Emissions limits.

A. Manufacturer certified emissions of each CI affected unit located in either an attainment or nonattainment area shall not exceed the limits specified in Table IV-1.

Table IV-1
Emissions Limits for CI Units Located in Either an Attainment or Nonattainment Area

Model Year

Emission Limits
g/kW-hr (g/bhp-hr)

PM

PM10

PM2.5

CO

VOC

NOx

Pre 2011

0.10

0.10

0.10

3.5

0.40

0.67

(0.075)

(0.075)

(0.075)

(2.6)

(0.30)

(0.50)

2011-2014

0.10

0.10

0.10

3.5

0.40

0.67

(0.075)

(0.075)

(0.075)

(2.6)

(0.30)

(0.50)

2015+

0.03

0.03

0.03

3.5

0.19

0.67

(0.022)

(0.022)

(0.022)

(2.6)

(0.14)

(0.50)

B. Emissions from the operation of each CI affected unit located in either an attainment or nonattainment area during testing shall not exceed the limits specified in Table IV-2.

Table IV-2
Emissions Limits During Testing for CI Units Located in Either an Attainment or Nonattainment Area

Model Year

Emission Limits
g/kW-hr (g/bhp-hr)

PM

PM10

PM2.5

CO

VOC

NOx

Pre 2011

0.13

0.13

0.13

4.4

0.50

0.84

(0.097)

(0.097)

(0.097)

(3.3)

(0.37)

(0.63)

2011-2014

0.13

0.13

0.13

4.4

0.50

0.84

(0.097)

(0.097)

(0.097)

(3.3)

(0.37)

(0.63)

2015+

0.04

0.04

0.04

4.4

0.24

0.84

(0.030)

(0.030)

(0.030)

(3.3)

(0.18)

(0.63)

C. Manufacturer tested emissions limits for each SI affected unit located in either an attainment or nonattainment area shall not exceed the limits specified in Table IV-3.

Table IV-3
Emissions Limits for SI Engines Located in Either an Attainment or Nonattainment Area

Model Year

Emission Limits
g/kW-hr (g/bhp-hr)

PM

PM10

PM 2.5

CO

VOC

NOx

Pre 2011

0.015

0.015

0.015

2.68

0.94

1.34

(0.011)

(0.011)

(0.011)

(2.0)

(0.7)

(1.0)

2011+

0.015

0.015

0.015

2.68

0.94

1.34

(0.011)

(0.011)

(0.011)

(2.0)

(0.7)

(1.0)

D. Emissions from the operation of each SI affected unit located in either an attainment or nonattainment area during testing shall not exceed the limits specified in Table IV-4.

Table IV-4
Emissions Limits During Testing for SI Units Located in Either an Attainment or Nonattainment Area

Model Year

Emission Limits
g/kW-hr (g/bhp-hr)

PM

PM10

PM 2.5

CO

VOC

NOx

Pre 2011

0.019

0.019

0.019

3.35

1.18

1.68

(0.014)

(0.014)

(0.014)

(2.5)

(0.88)

(1.25)

2011+

0.019

0.019

0.019

3.35

1.18

1.68

(0.014)

(0.014)

(0.014)

(2.5)

(0.88)

(1.25)

E. Combined source-wide emissions from the operation of affected units shall not exceed the limits specified in Table IV-5.

Table IV-5
Combined Source-Wide Emissions Limits for Affected Units

Pollutant

Nonattainment Areas Emissions (tons/year)

Attainment Areas Emissions (tons/year)

PM

2.8

2.8

PM10

2.8

2.8

PM2.5

2.8

2.8

NOx

24.4

39.4

CO

99.4

99.4

VOC

17.1

27.6

F. Visible emissions from each affected unit shall not exceed 5.0% opacity as determined by Reference Method 9. This condition applies at all times except during startup, shutdown, and malfunction.

Statutory Authority

§§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.

Historical Notes

Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.

9VAC5-530-190. Testing requirements.

A. Each affected unit shall be constructed and installed so as to allow for emissions testing upon reasonable notice at any time using appropriate methods. Sampling ports shall be provided when requested at the appropriate locations and safe sampling platforms and access shall be provided.

B. No affected unit shall be used for the purposes of preventative maintenance purposes between the hours of 7 a.m. to 5 p.m. any day during the ozone season of May 1 through September 30.

C. Initial performance tests shall be conducted for NOx, CO, PM10, and PM2.5 from the affected unit using EPA-approved reference methods to determine compliance with the emission limits contained in 9VAC5-530-180.

1. The tests shall be performed and demonstrate compliance within 60 days after achieving the maximum production rate at which the affected unit or units will be operated, but in no event later than 180 days after startup of the permitted source.

2. Tests shall be conducted in accordance with EPA methods or an alternative method approved by department.

3. The details of the tests are to be arranged with the regional office and the owner shall submit a test protocol at least 30 days prior to testing.

4. One copy of the test results shall be submitted to the department regional office within 45 days after test completion and shall conform to the test report format in subsection D of this section.

5. Testing for multiple identical affected units located at the source shall be conducted as follows:

a. 50% of CI affected units shall be tested.

b. 100% of SI affected units over 500 bhp shall be tested.

6. The owner shall conduct additional performance testing every three years for NOx, CO, PM10, and PM2.5 to demonstrate compliance with the testing emission limits contained in 9VAC5-530-180. The details of the tests shall be arranged with the regional office. Additional performance testing for multiple identical affected units located at the source shall be conducted as follows:

a. 20% of CI affected units shall be tested.

b. 100% of SI affected units over 500 bhp shall be tested.

D. The test report format for performance testing shall include the following:

1. A report cover containing:

a. The plant name;

b. The plant location;

c. Units tested (including unit reference number if assigned);

d. Test dates;

e. The name of the individual conducting the test;

f. The address of the individual conducting the test; and

g. The report date.

2. A certification, including the date certified, that has been signed by:

a. A test team leader or a certified observer;

b. The test reviewer; and

c. A responsible company official.

3. A copy of approved test protocol.

4. A summary including:

a. The reason for testing;

b. Test dates;

c. Identification of the unit tested including the maximum rated capacity for each unit;

d. For each emission unit, a table showing:

(1) The operating rate;

(2) Test methods;

(3) The pollutants tested; and

(4) Test results for each run, including the run average;

e. Process and control equipment data for each run and the average as required by the test protocol;

f. A statement that the test was conducted in accordance with the test protocol, or identification and discussion of deviations, including the likely impact on results; and

g. Any other important information as determined by the regional office.

5. A description of source operation including:

a. A description of the process;

b. A description of control devices, if necessary;

c. A process and control equipment flow diagram; and

d. A description of sampling port location and a dimensioned cross section. A protocol shall be attached that includes a sketch of the stack (elevation view) showing sampling port locations, upstream and downstream flow disturbances and their distances from ports; and a sketch of stack (plan view) showing sampling ports, ducts entering the stack, and stack diameter or dimensions.

6. Test results, including:

a. Detailed test results for each run;

b. Sample calculations; and

c. A description of collected samples, including audits, when applicable.

7. An appendix, including:

a. Raw production data;

b. Raw field data;

c. Laboratory reports;

d. Chain of custody records for laboratory samples;

e. Calibration procedures and results;

f. Project participants and contact information;

g. Observers' names, including their industry and agency affiliation;

h. Related correspondence; and

i. Standard procedures.

E. Initial Visible Emission Evaluations (VEE) in accordance with Reference Method 9 shall be conducted on each affected unit.

1. The evaluation shall be performed and demonstrate compliance within 60 days after achieving the maximum production rate at which the affected unit or units will be operated, but in no event later than 180 days after startup of the permitted source.

2. Should conditions prevent concurrent opacity observations, the regional office shall be notified in writing within seven days and visible emissions testing shall be rescheduled within 30 days.

3. Rescheduled testing shall be conducted under the same conditions (as possible) as the initial performance tests.

4. Each test shall consist of 30 sets of 24 consecutive observations (at 15 second intervals) to yield a six-minute average.

5. The details of the tests are to be arranged with the regional office and the owner shall submit a test protocol at least 30 days prior to initial testing.

6. One copy of the test results shall be submitted to the department regional office within 45 days after test completion and shall conform to the test report format in 9VAC5-530-190 F.

7. Initial VEE testing for multiple identical affected units located at the source shall be conducted as follows:

a. 50% of CI affected units shall be tested.

b. 100% of SI affected units over 500 bhp shall be tested.

8. The owner shall conduct additional VEE testing every three years to demonstrate compliance with the opacity limit contained in 9VAC5-530-180 F. The details of the tests shall be arranged with the regional office. Additional VEE testing for multiple identical affected units located at the source shall be conducted as follows:

a. 20% of CI affected units shall be tested.

b. 100% of SI affected units over 500 bhp shall be tested.

F. The test report format for visible emissions evaluations shall include the following.

1. A report cover containing:

a. The plant name;

b. The plant location;

c. Units tested at the source identified by the department that have been issued reference numbers;

d. Test dates;

e. The name of the individual conducting the test;

f. The address of individual conducting the test; and

g. The report date.

2. A certification, including the date certified, that has been signed by:

a. A test team leader or a certified observer; and

b. A responsible company official.

3. Copy of the approved test protocol.

4. A summary including:

a. The reason for testing;

b. Test dates;

c. Identification of the unit tested, including the maximum rated capacity for each unit;

d. Summarized process and control equipment data for each run and the average as required by the test protocol;

e. A statement certifying that the test was conducted in accordance with the test protocol or, if not conducted according to protocol, identification and discussion of deviations, including the likely impact on results; and

f. Any other important information.

5. A description of source operation including:

a. A description of the process;

b. A description of control devices, if necessary;

c. A process and control equipment flow diagram; and

d. A description of sampling port location and a dimensioned cross section. A protocol shall be attached that includes a sketch of the stack (elevation view) showing sampling port locations, upstream and downstream flow disturbances and their distances from ports; and a sketch of stack (plan view) showing sampling ports, ducts entering the stack, and stack diameter or dimensions.

6. The detailed test results for each run.

7. An appendix including:

a. Names of project participants and their titles;

b. Observers' names, including their industry and agency affiliation;

c. Related correspondence; and

d. Standard procedures.

Statutory Authority

§§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.

Historical Notes

Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.

9VAC5-530-200. Recordkeeping requirements.

A. The owner shall maintain records of emission data and operating parameters as necessary and, if requested, provide them to the department within three business days to demonstrate compliance with this general permit.

B. The owner shall maintain records of the occurrence and duration of any bypass, malfunction, shutdown, or failure of the affected unit or its associated air pollution control equipment that results in excess emissions for more than one hour. Records shall include the following: (i) date, (ii) time, (iii) duration, (iv) description (emission unit, pollutant affected, cause), (v) corrective action, (vi) preventive measures taken, and (vii) name of person generating the record.

C. The content and format of such records shall be arranged with the regional office. These records shall include, but are not limited to:

1. Total combined annual throughput of fuel consumed for the affected unit or units, calculated monthly as the sum of each consecutive 12-month period. Compliance for the consecutive 12-month period shall be demonstrated monthly by adding the total for the most recently completed calendar month to the individual monthly totals for the preceding 11 months.

2. Total annual heat input values to show compliance with subsections C, D, and E of 9VAC5-530-170.

3. All fuel supplier certifications.

4. Engine information including make, model, serial number, model year, maximum engine power, and engine displacement for each affected unit.

5. Written manufacturer specifications or written standard operating procedures prepared by the owner for each affected unit. The written standard operating procedures prepared by the owner cannot be less stringent than the written manufacturer specifications.

6. Results of all stack tests, VEE, and performance evaluations.

7. Operation and control device monitoring records for the fuel flow meter.

8. Scheduled and unscheduled maintenance, testing, and operator training.

D. These records shall be available for inspection by the department and shall be current for the most recent five years.

Statutory Authority

§§ 10.1-1307.02 and 10.1-1308 of the Code of Virginia.

Historical Notes

Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011.

9VAC5-530-210. Reporting requirements.

A. The owner shall furnish written notification to the regional office of the following:

1. The actual date on which construction of each affected unit commenced within 30 days after such date.

2. If necessary, the actual date on which the integration operational period of each affected unit commenced within 15 days after such date.

3. The anticipated startup date of each affected unit postmarked or submitted electronically not more than 60 days nor less than 30 days prior to such date.

4. The actual startup date of each affected unit within 15 days after such date.

5. The anticipated date of performance tests of each affected unit postmarked or submitted electronically at least 30 days prior to such date.

B. The owner shall furnish notification to the regional office of malfunctions of the affected unit or related air pollution control equipment that may cause excess emissions for more than one hour.

1. Such notification shall be made as soon as practicable but no later than four daytime business hours after the malfunction is discovered.

2. The owner shall provide a written statement giving all pertinent facts, including the estimated duration of the breakdown, within two weeks of discovery of the malfunction.

3. When the condition causing the failure or malfunction has been corrected and the equipment is again in operation, the owner shall notify the regional office.

Statutory Authority

§ 10.1-1308 of the Code of Virginia.

Historical Notes

Derived from Virginia Register Volume 27, Issue 23, eff. August 17, 2011; amended, Virginia Register Volume 40, Issue 14, eff. April 11, 2024.

Website addresses provided in the Virginia Administrative Code to documents incorporated by reference are for the reader's convenience only, may not necessarily be active or current, and should not be relied upon. To ensure the information incorporated by reference is accurate, the reader is encouraged to use the source document described in the regulation.

As a service to the public, the Virginia Administrative Code is provided online by the Virginia General Assembly. We are unable to answer legal questions or respond to requests for legal advice, including application of law to specific fact. To understand and protect your legal rights, you should consult an attorney.