9VAC25-31-130. Concentrated animal feeding operations.
A. Permit requirement for CAFOs.
1. Concentrated animal feeding operations as defined in 9VAC25-31-10 or designated in accordance with subsection B of this section are point sources that require VPDES permits for discharges. Once an operation is defined as a CAFO, the VPDES requirements for CAFOs apply with respect to all animals in confinement at the operation and all manure, litter and process wastewater generated by those animals or the production of those animals, regardless of the type of animal.
2. Two or more animal feeding operations under common ownership are considered, for the purposes of this chapter, to be a single animal feeding operation if they adjoin each other or if they use a common area or system for the disposal of wastes.
B. Case-by-case designations. The department may designate any animal feeding operation as a concentrated animal feeding operation upon determining that it is a significant contributor of pollution to surface waters.
1. In making this designation the department shall consider the following factors:
a. The size of the animal feeding operation and the amount of wastes reaching surface waters;
b. The location of the animal feeding operation relative to surface waters;
c. The means of conveyance of animal wastes and process wastewaters into surface waters;
d. The slope, vegetation, rainfall, and other factors affecting the likelihood or frequency of discharge of animal wastes and process wastewaters into surface waters; and
e. Other relevant factors.
2. No animal feeding operation with less than the numbers of animals set forth in the definition of Medium CAFO in this regulation shall be designated as a concentrated animal feeding operation unless:
a. Pollutants are discharged into surface waters through a manmade ditch, flushing system, or other similar manmade device; or
b. Pollutants are discharged directly into surface waters which originate outside of the facility and pass over, across, or through the facility or otherwise come into direct contact with the animals confined in the operation.
3. A permit application shall not be required from a concentrated animal feeding operation designated under this subsection until the department has conducted an on-site inspection of the operation and determined that the operation should and could be regulated under the VPDES permit program.
C. VPDES permit authorization.
1. Permit requirement. The owners or operators of a CAFO shall not discharge unless the discharge is authorized by a VPDES permit. In order to obtain authorization under a VPDES permit, the CAFO owner or operator shall either apply for an individual VPDES permit or apply for coverage under a VPDES general permit. The owners or operators of a CAFO must have obtained authorization under the VPDES permit at the time that the CAFO discharges.
2. Information to submit with permit application. A permit application for an individual permit must include the information specified in 9VAC25-31-100 J. A notice of intent for a general permit must include the information specified in 9VAC25-31-100 J and 9VAC25-31-170.
3. Land application discharges from a CAFO are subject to VPDES requirements. The discharge of manure, litter or process wastewater to surface waters from a CAFO as the result of the application of that manure, litter or process wastewater by the CAFO to land areas under its control is a discharge from that CAFO subject to VPDES requirements, except where it is an agricultural stormwater discharge as provided in 33 USC § 1362(14). For purposes of this subdivision, where the manure, litter or process wastewater has been applied in accordance with a nutrient management plan approved by the Department of Conservation and Recreation and in accordance with site specific nutrient management practices that ensure appropriate agricultural utilization of the nutrients in the manure, litter, or process wastewater, as specified in subdivisions E 1 f through i of 9VAC25-31-200, a precipitation-related discharge of manure, litter or process wastewater from land areas under the control of a CAFO is an agricultural stormwater discharge.
a. For unpermitted Large CAFOs, a precipitation-related discharge of manure, litter, or process wastewater from land areas under the control of a CAFO shall be considered an agricultural stormwater discharge only where the manure, litter, or process wastewater has been land applied in accordance with site-specific nutrient management practices that ensure appropriate agricultural utilization of the nutrients in the manure, litter, or process wastewater, as specified in subdivisions E 1 f through i of 9VAC25-31-200.
b. Unpermitted Large CAFOs shall maintain documentation specified in subdivision E 1 i of 9VAC25-31-200 either on site or at a nearby office, or otherwise make such documentation readily available to department staff upon request.
4. Procedures for CAFOs seeking coverage under a general permit. CAFO owners or operators shall submit a registration statement when seeking authorization to discharge under a general permit in accordance with subsection B of 9VAC25-31-170. The department will review registration statements submitted by CAFO owners or operators to ensure that the registration statement includes the information required by subsection J of 9VAC25-31-100, including a nutrient management plan that meets the requirements of subsection E of 9VAC25-31-200 and applicable effluent limitations and standards, including those specified in 40 CFR Part 412. When additional information is necessary to complete the registration statement or clarify, modify, or supplement previously submitted material, the department may request such information from the owner or operator. If the department makes a preliminary determination that the registration statement meets the requirements of subsection J of 9VAC25-31-100 and subsection E of 9VAC25-31-200, the department will notify the public of the department's proposal to grant coverage under the permit to the CAFO and make available for public review and comment the registration statement submitted by the CAFO, including the CAFO's nutrient management plan, and the draft terms of the nutrient management plan to be incorporated into the permit. The process for submitting public comments and public hearing requests, and the public hearing process if a request for a public hearing is granted, shall follow the procedures applicable to draft permits set forth in 9VAC25-31-300, 9VAC25-31-310, and 40 CFR 124.13. The board may establish, either by regulation or in the general permit, an appropriate period of time for the public to comment and request a public hearing that differs from the time period specified in 9VAC25-31-290. The department's response to significant comments received during the comment period is governed by 9VAC25-31-320, and, if necessary, the department will require the CAFO owner or operator to revise the nutrient management plan in order to be granted permit coverage. When the department authorizes coverage for the CAFO owner or operator under the general permit, the terms of the nutrient management plan shall become incorporated as terms and conditions of the permit for the CAFO. The department will notify the CAFO owner or operator and inform the public that coverage has been authorized and of the terms of the nutrient management plan incorporated as terms and conditions of the permit applicable to the CAFO.
5. Changes to a nutrient management plan. Any permit issued to a CAFO shall require the following procedures to apply when a CAFO owner or operator makes changes to the CAFO's nutrient management plan previously submitted to the department:
a. The CAFO owner or operator shall provide the department with the most current version of the CAFO's nutrient management plan and identify changes from the previous version, except that the results of calculations made in accordance with the requirements of subdivisions E 5 a (2) and E 5 b (4) of 9VAC25-31-200 are not subject to the requirements of this subdivision 5.
b. The department will review the revised nutrient management plan to ensure that it meets the requirements of this section and applicable effluent limitations and standards, including those specified in 40 CFR Part 412, and will determine whether the changes to the nutrient management plan necessitate revision to the terms of the nutrient management plan incorporated into the permit issued to the CAFO. If revision to the terms of the nutrient management plan is not necessary, the department will notify the CAFO owner or operator and upon such notification the CAFO may implement the revised nutrient management plan. If revision to the terms of the nutrient management plan is necessary, the department will determine whether such changes are substantial changes as described in subdivision 5 c of this subsection.
(1) If the department determines that the changes to the terms of the nutrient management plan are not substantial, the department will make the revised nutrient management plan publicly available and include it in the permit record, revise the terms of the nutrient management plan incorporated into the permit, and notify the owner or operator and inform the public of any changes to the terms of the nutrient management plan that are incorporated into the permit.
(2) If the department determines that the changes to the terms of the nutrient management plan are substantial, the department will notify the public and make the proposed changes and the information submitted by the CAFO owner or operator available for public review and comment. The process for public comments, public hearing requests, and the public hearing process if a public hearing is held shall follow the procedures applicable to draft permits set forth in 9VAC25-31-300, 9VAC25-31-310, and 40 CFR 124.13. The board may establish by regulation or the department may establish in the CAFO's permit, an appropriate period of time for the public to comment and request a public hearing on the proposed changes that differs from the time period specified in 9VAC25-31-290. The department will respond to all significant comments received during the comment period as provided in 9VAC25-31-320, and require the CAFO owner or operator to further revise the nutrient management plan if necessary, in order to approve the revision to the terms of the nutrient management plan incorporated into the CAFO's permit. Once the department incorporates the revised terms of the nutrient management plan into the permit, the department will notify the owner or operator and inform the public of the final decision concerning revisions to the terms and conditions of the permit.
c. Substantial changes to the terms of a nutrient management plan incorporated as terms and conditions of a permit include:
(1) Addition of new land application areas not previously included in the CAFO's nutrient management plan. Except that if the land application area that is being added to the nutrient management plan is covered by terms of a nutrient management plan incorporated into an existing VPDES permit in accordance with the requirements of subdivision E 5 of 9VAC25-31-200, and the CAFO owner or operator applies manure, litter, or process wastewater on the newly added land application area in accordance with the existing field-specific permit terms applicable to the newly added land application area, such addition of new land would be a change to the new CAFO owner or operator's nutrient management plan but not a substantial change for purposes of this section;
(2) Any changes to the field-specific maximum annual rates for land application, as set forth in subdivision E 5 a of 9VAC25-31-200, and to the maximum amounts of nitrogen and phosphorus derived from all sources for each crop, as set forth in subdivision E 5 b of 9VAC25-31-200;
(3) Addition of any crop or other uses not included in the terms of the CAFO's nutrient management plan and corresponding field-specific rates of application expressed in accordance with subdivision E 5 of 9VAC25-31-200; and
(4) Changes to site-specific components of the CAFO's nutrient management plan, where such changes are likely to increase the risk of nitrogen and phosphorus transport to state waters.
6. Causes for modification of nutrient management plans. The incorporation of the terms of a CAFO's nutrient management plan into the terms and conditions of a general permit when a CAFO obtains coverage under a general permit in accordance with subdivision C 4 of 9VAC25-31-130 and 9VAC25-31-170 is not a cause for modification pursuant to the requirements of 9VAC25-31-370.
Statutory Authority
§ 62.1-44.15 of the Code of Virginia; § 402 of the federal Clean Water Act; 40 CFR Parts 122, 123, 124, 403, and 503.
Historical Notes
Derived from Virginia Register Volume 12, Issue 20, eff. July 24, 1996; amended, Virginia Register Volume 21, Issue 2, eff. November 3, 2004; Volume 21, Issue 9, eff. February 9, 2005; Volume 26, Issue 11, eff. March 3, 2010; Errata, 26:19 VA.R. 2501 May 24, 2010; amended, Virginia Register Volume 28, Issue 10, eff. February 15, 2012; Volume 30, Issue 4, eff. November 20, 2013; Volume 37, Issue 1, eff. October 1, 2020; Volume 39, Issue 4, eff. November 9, 2022.