9VAC25-580-40. Permitting and inspection requirements for all UST systems.
In all instances of installation, upgrade, repair and closure where a UST system is constructed, enlarged, altered, repaired or closed all UST systems must be permitted and inspected in accordance with 9VAC25-580-50, 9VAC25-580-60, 9VAC25-580-110, 9VAC25-580-160, 9VAC25-580-170, 9VAC25-580-310, 9VAC25-580-320, 9VAC25-580-380, and 9VAC25-580-390.
Statutory Authority
§§ 62.1-44.15 and 62.1-44.34:9 of the Code of Virginia; 42 USC § 6901 et seq.; 40 CFR Parts 280 and 281.
Historical Notes
Derived from VR680-13-02 § 1.4, eff. October 25, 1989; amended, Virginia Register Volume 34, Issue 1, eff. January 1, 2018.