LIS

Administrative Code

Virginia Administrative Code
12/4/2024

Chapter 820. General Virginia Pollutant Discharge Elimination System (VPDES) Watershed Permit Regulation for Total Nitrogen and Total Phosphorus Discharges and Nutrient Trading in the Chesapeake Bay Watershed in Virginia

9VAC25-820-10. Definitions.

Except as defined below, the words and terms used in this chapter shall have the meanings defined in the Virginia Pollutant Discharge Elimination System (VPDES) Permit Regulation (9VAC25-31).

"Annual mass load of total nitrogen" (expressed in pounds per year) means the sum of the total monthly loads for all of the months in one calendar year. See Part I E 4 of the general permit in 9VAC25-820-70 for calculating total monthly load.

"Annual mass load of total phosphorus" (expressed in pounds per year) means the sum of the total monthly loads for all of the months in one calendar year. See Part I E 4 of the general permit in 9VAC25-820-70 for calculating total monthly load.

"Association" means the Virginia Nutrient Credit Exchange Association authorized by § 62.1-44.19:17 of the Code of Virginia.

"Attenuation" means the rate at which nutrients are reduced through natural processes during transport in water.

"Board" means the Virginia State Water Control Board or State Water Control Board. When used outside the context of the promulgation of regulations, including regulations to establish general permits, "board" means the Department of Environmental Quality.

"Delivered total nitrogen load" means the discharged mass load of total nitrogen from a point source that is adjusted by the delivery factor for that point source.

"Delivered total phosphorus load" means the discharged mass load of total phosphorus from a point source that is adjusted by the delivery factor for that point source.

"Delivery factor" means an estimate of the number of pounds of total nitrogen or total phosphorus delivered to tidal waters for every pound discharged from a facility, as determined by the specific geographic location of the facility, to account for attenuation that occurs during riverine transport between the facility and tidal waters. Delivery factors shall be calculated using the Chesapeake Bay Program watershed model. For the purpose of this regulation, delivery factors with a value greater than 1.00 in the Chesapeake Bay Program watershed model shall be considered to be equal to 1.00.

"Department" or "DEQ" means the Department of Environmental Quality.

"Director" means the director of the Department of Environmental Quality.

"Eastern Shore trading ratio" means the ratio of pounds of point source credits from another tributary that can be acquired and applied by the owner of a facility in the Eastern Shore Basin for every pound of point source total nitrogen or total phosphorus discharged from the Eastern Shore Basin facility. Trading ratios are expressed in the form "credits supplied: credits received."

"Equivalent load" means:

2,300 pounds per year of total nitrogen or 300 pounds per year of total phosphorus discharged by an industrial facility are considered equivalent to the load discharged from sewage treatment works with a design capacity of 0.04 million gallons per day,

5,700 pounds per year of total nitrogen or 760 pounds per year of total phosphorus discharged by an industrial facility are considered equivalent to the load discharged from sewage treatment works with a design capacity of 0.1 million gallons per day, and

28,500 pounds per year of total nitrogen or 3,800 pounds per year of total phosphorus discharged by an industrial facility are considered equivalent to the load discharged from sewage treatment works with a design capacity of 0.5 million gallons per day.

"Existing facility" means a facility (i) subject to a current individual VPDES permit from which a discharge has commenced or for which its owner has received a Certificate to Construct (for sewage treatment works, or equivalent DEQ approval for discharges from industrial facilities) for the treatment works used to derive its wasteload allocation on or before July 1, 2005, or (ii) for which the owner has a wasteload allocation listed in 9VAC25-720-50 C, 9VAC25-720-60 C, 9VAC25-720-70 C, 9VAC25-720-110 C, and 9VAC25-720-120 C of the Water Quality Management Planning Regulation. Existing facility shall also mean and include any facility, not subject to an individual VPDES permit, for which its owner holds a separate wasteload allocation in 9VAC25-720-120 C of the Water Quality Management Planning Regulation.

"Expansion" or "expands" means (i) initiating construction at an existing treatment works after July 1, 2005, to increase design flow capacity, except that the term does not apply in those cases where a Certificate to Construct (for sewage treatment works, or equivalent DEQ approval for discharges from industrial facilities) was issued on or before July 1, 2005, or (ii) industrial production process changes or the use of new treatment products at industrial facilities that increase the annual mass load of total nitrogen or total phosphorus above the wasteload allocation.

"Facility" means a point source from which a discharge or proposed discharge of total nitrogen or total phosphorus to the Chesapeake Bay or its tributaries exists. This term does not include confined animal feeding operations, discharges of storm water, return flows from irrigated agriculture, or vessels.

"General permit" means this general permit authorized by § 62.1-44.19:14 of the Code of Virginia.

"Industrial facility" means any facility (as defined above) other than sewage treatment works.

"Local water quality-based limitations" means limitations intended to protect local water quality including applicable total maximum daily load (TMDL) allocations, applicable Virginia Pollution Discharge Elimination System (VPDES) permit limits, applicable limitations set forth in water quality standards established under § 62.1-44.15 (3a) of the Code of Virginia, or other limitations as established by the State Water Control Board.

"New discharge" means any discharge from a facility that did not commence prior to July 1, 2005, except that the term does not apply in those cases where a Certificate to Construct (for sewage treatment works, or equivalent DEQ approval for discharges from industrial facilities) was issued to the facility on or before July 1, 2005.

"Nonsignificant discharger" means (i) a sewage treatment works discharging to the Chesapeake Bay watershed downstream of the fall line with a design capacity of less than 0.1 million gallons per day, or less than an equivalent load discharged from industrial facilities, or (ii) a sewage treatment works discharging to the Chesapeake Bay watershed upstream of the fall line with a design capacity of less than 0.5 million gallons per day, or less than an equivalent load discharged from industrial facilities.

"Offset" means to acquire an annual wasteload allocation of total nitrogen or total phosphorus for a new or expanding facility to ensure that there is no net increase of nutrients into the affected tributary of the Chesapeake Bay.

"Permitted design capacity" or "permitted capacity" means the allowable load (pounds per year) assigned to an existing facility that is a nonsignificant discharger and that does not have a wasteload allocation listed in 9VAC25-720-50 C, 9VAC25-720-60 C, 9VAC25-720-70 C, 9VAC25-720-110 C, and 9VAC25-720-120 C of the Water Quality Management Planning Regulation. The permitted design capacity is calculated based on the design flow and installed nutrient removal technology (for sewage treatment works, or equivalent discharge from industrial facilities) at a facility that has either commenced discharge, or for which an owner has received a Certificate to Construct (for sewage treatment works, or equivalent DEQ approval for discharges from industrial facilities) prior to July 1, 2005. This mass load is used for (i) determining whether the owner of the expanding facility must offset additional mass loading of nitrogen and phosphorus and (ii) determining whether the owner of the facility must acquire credits at the end of a calendar year. For the purpose of this chapter, owners of facilities that have installed secondary wastewater treatment (intended to achieve BOD and TSS monthly average concentrations equal to or less than 30 milligrams per liter) are assumed to achieve an annual average total nitrogen effluent concentration of 18.7 milligrams per liter and an annual average total phosphorus effluent concentration of 2.5 milligrams per liter. Permitted design capacities for facilities that, before July 1, 2005, were required to comply with more stringent nutrient limits shall be calculated using the more stringent values.

"Permitted facility" means a facility whose owner is authorized by this general permit to discharge total nitrogen or total phosphorus. For the sole purpose of generating point source nitrogen credits or point source phosphorus credits, "permitted facility" shall also mean the Blue Plains wastewater treatment facility operated by the District of Columbia Water and Sewer Authority.

"Permittee" means a person authorized by this general permit to discharge total nitrogen or total phosphorus.

"Point source nitrogen credit" means the difference between (i) the wasteload allocation for a permitted facility specified as an annual mass load of total nitrogen and (ii) the monitored annual mass load of total nitrogen discharged from that facility, where clause (ii) is less than clause (i), and where the difference is adjusted by the applicable delivery factor and expressed as pounds per year of delivered total nitrogen load.

"Point source phosphorus credit" means the difference between (i) the wasteload allocation for a permitted facility specified as an annual mass load of total phosphorus and (ii) the monitored annual mass load of total phosphorus discharged from that facility, where clause (ii) is less than clause (i), and where the difference is adjusted by the applicable delivery factor and expressed as pounds per year of delivered total phosphorus load.

"Quantification level" or "QL" means the minimum levels, concentrations, or quantities of a target variable (e.g., target analyte) that can be reported with a specified degree of confidence in accordance with 1VAC30-45, Certification for Noncommercial Environmental Laboratories, or 1VAC30-46, Accreditation for Commercial Environmental Laboratories.

"Registration list" means a list maintained by the department indicating all facilities that are registered for coverage under this general permit, by tributary, including their wasteload allocations, permitted design capacities, and delivery factors as appropriate.

"Significant discharger" means the owner of (i) a sewage treatment works discharging to the Chesapeake Bay watershed upstream of the fall line with a design capacity of 0.5 million gallons per day or greater, or an equivalent load discharged from industrial facilities; (ii) a sewage treatment works discharging to the Chesapeake Bay watershed downstream of the fall line with a design capacity of 0.1 million gallons per day or greater, or an equivalent load discharged from industrial facilities; (iii) a planned or newly expanding sewage treatment works discharging to the Chesapeake Bay watershed upstream of the fall line that was expected to be in operation by December 31, 2010, with a permitted design of 0.5 million gallons per day or greater, or an equivalent load to be discharged from industrial facilities; or (iv) a planned or newly expanding sewage treatment works discharging to the Chesapeake Bay watershed downstream of the fall line that was expected to be in operation by December 31, 2010, with a design capacity of 0.1 million gallons per day or greater, or an equivalent load to be discharged from industrial facilities.

"State-of-the-art nutrient removal technology" means (i) technology that will achieve an annual average total nitrogen effluent concentration of three milligrams per liter and an annual average total phosphorus effluent concentration of 0.3 milligrams per liter or (ii) equivalent load reductions in total nitrogen and total phosphorus through recycle or reuse of wastewater as determined by the department.

"Tributaries" means those river basins listed in the Chesapeake Bay TMDL and includes the Potomac, Rappahannock, York, and James River Basins and the Eastern Shore Basin, which encompasses the creeks and rivers of the Eastern Shore of Virginia that are west of Route 13 and drain into the Chesapeake Bay.

"VPDES" means Virginia Pollutant Discharge Elimination System.

"Wasteload allocation" means the most limiting of (i) the water quality-based annual mass load of total nitrogen or annual mass load of total phosphorus allocated to individual facilities pursuant to 9VAC25-720-50 C, 9VAC25-720-60 C, 9VAC25-720-70 C, 9VAC25-720-110 C, and 9VAC25-720-120 C of the Water Quality Management Planning Regulation or its successor, or permitted capacity in the case of nonsignificant dischargers; (ii) the water quality-based annual mass load of total nitrogen or annual mass load of total phosphorus acquired pursuant to § 62.1-44.19:15 of the Code of Virginia for new or expanded facilities; or (iii) applicable total nitrogen or total phosphorus wasteload allocations under the Chesapeake Bay total maximum daily loads (TMDLs) to restore or protect the water quality and beneficial uses of the Chesapeake Bay or its tidal tributaries.

Statutory Authority

62.1-44.15 of the Code of Virginia; § 402 of the Clean Water Act; 40 CFR Parts 122, 123, and 124.

Historical Notes

Derived from Virginia Register Volume 23, Issue 2, eff. November 1, 2006; amended, Virginia Register Volume 24, Issue 21, eff. August 7, 2008; Volume 28, Issue 4, eff. January 1, 2012; Volume 29, Issue 4, eff. November 21, 2012; Volume 33, Issue 10, eff. February 8, 2017; Volume 39, Issue 4, eff. November 9, 2022.

9VAC25-820-15. Applicability of incorporated references based on the dates that they became effective.

Except as noted, when a regulation of the U.S. Environmental Protection Agency set forth in Title 40 of the Code of Federal Regulations is referenced or adopted in this chapter and incorporated by reference that regulation shall be as it exists and has been published as of July 1, 2014.

Statutory Authority

§ 62.1-44.15 of the Code of Virginia.

Historical Notes

Derived from Virginia Register Volume 33, Issue 10, eff. February 8, 2017.

9VAC25-820-20. Purpose, applicability.

A. This regulation fulfills the statutory requirement for the General VPDES Watershed Permit for Total Nitrogen and Total Phosphorus discharges and nutrient trading in the Chesapeake Bay watershed issued by the board pursuant to the Clean Water Act (33 USC § 1251 et seq.) and § 62.1-44.19:14 of the Code of Virginia.

B. This general permit regulation governs owners of facilities holding individual VPDES permits or otherwise meeting the definition of "existing facility" that discharge or propose to discharge total nitrogen or total phosphorus to the Chesapeake Bay or its tributaries.

Statutory Authority

§ 62.1-44.15 of the Code of Virginia; § 402 of the Clean Water Act; 40 CFR Parts 122, 123, and 124.

Historical Notes

Derived from Virginia Register Volume 23, Issue 2, eff. November 1, 2006; amended, Volume 24, Issue 21, eff. August 7, 2008; Volume 33, Issue 10, eff. February 8, 2017; Volume 39, Issue 4, eff. November 9, 2022.

9VAC25-820-30. Relation to existing VPDES permits issued in accordance with 9VAC25-31.

A. This general permit shall control in lieu of conflicting or duplicative mass loading effluent limitations, monitoring or reporting requirements for total nitrogen and total phosphorus contained in individual VPDES permits for facilities covered by this general permit where these requirements are based upon standards, criteria, wasteload allocations, policy, or guidance established to restore or protect the water quality and beneficial uses of the Chesapeake Bay or its tidal tributaries.

B. This general permit shall not control in lieu of more stringent water quality-based effluent limitations for total nitrogen or total phosphorus in individual permits where those limitations are necessary to protect local water quality, or more stringent technology-based effluent concentration limitations in the individual permit for any facility that has installed technology for the control of nitrogen and phosphorus whether by new construction, expansion, or upgrade.

C. The compliance schedule in this general permit shall control in lieu of conflicting or duplicative schedule requirements contained in individual VPDES permits for facilities covered by this general permit where those requirements address mass loading of total nitrogen or total phosphorus and are based upon standards, criteria, wasteload allocations, policy, or guidance established to restore or protect the water quality and beneficial uses of the Chesapeake Bay or its tidal tributaries.

Statutory Authority

§ 62.1-44.15 of the Code of Virginia.

Historical Notes

Derived from Virginia Register Volume 23, Issue 2, eff. November 1, 2006; amended, Virginia Register Volume 33, Issue 10, eff. February 8, 2017.

9VAC25-820-40. Compliance plans.

A. By February 1, 2023, every owner of a facility subject to reduced individual total nitrogen or total phosphorous wasteload allocations as identified in 9VAC25-820-80 shall either individually or through the Virginia Nutrient Credit Exchange Association submit compliance plans to the department for approval.

1. For facilities listed in 9VAC25-820-80 A, compliance with reduced wasteload allocations established by the Enhanced Nutrient Removal Certainty Program shall be on the effective date of the reduced allocations as established in 9VAC25-720-60 and 9VAC25-720-120. For facilities listed in 9VAC25-820-80 B, compliance with chlorophyll-a based total phosphorus wasteload allocations shall be achieved as soon as possible, but no later than January 1, 2026. The compliance plans shall contain any capital projects and implementation schedules needed to achieve total nitrogen and phosphorus reductions sufficient to comply with the individual and combined wasteload allocations of all the permittees in the tributary. Permittees submitting individual plans are not required to account for other facilities' activities.

2. As part of the compliance plan development for facilities listed in 9VAC25-820-80 B, permittees shall either:

a. Demonstrate that the additional capital projects anticipated by subdivision 1 of this subsection are necessary to ensure continued compliance with these allocations by January 1, 2026, or

b. Request that their individual wasteload allocations become effective on January 1, 2023.

3. The compliance plans may rely on the exchange of point source credits in accordance with this general permit, but not the acquisition of credits through payments into the Nutrient Offset Fund (§ 10.1-2128.2 of the Code of Virginia), to achieve compliance with the individual and combined wasteload allocations in each tributary.

B. Every owner of a facility required to submit a registration statement shall either individually or through the Virginia Nutrient Credit Exchange Association submit annual compliance plan updates to the department for approval as required by Part I D of the general permit.

Statutory Authority

§ 62.1-44.15 of the Code of Virginia; 33 USC § 1313(e) of the Clean Water Act.

Historical Notes

Derived from Virginia Register Volume 23, Issue 2, eff. November 1, 2006; amended, Virginia Register Volume 28, Issue 4, eff. January 1, 2012; Volume 33, Issue 10, eff. February 8, 2017; Volume 37, Issue 26, eff. January 1, 2022; Volume 39, Issue 7, eff. December 21, 2022.

9VAC25-820-50. Transfer of permit coverage.

A. Coverage under the general permit shall be transferred by the current permittee to a new owner concurrently with the transfer of the individual permit or permits in accordance with 9VAC25-31-380. If the current permittee holds an aggregated wasteload allocation for multiple facilities in accordance with Part I B 2 of the general permit, the current permittee shall submit a revised registration statement for any facilities retained and the new owner shall submit a registration statement for the facilities transferred.

B. All conditions of the general permit, including, but not limited to, the submittal of a registration statement, annual nutrient allocation compliance and reporting requirements, shall apply to the new owner immediately upon the transfer date.

Statutory Authority

§ 62.1-44.15 of the Code of Virginia.

Historical Notes

Derived from Virginia Register Volume 23, Issue 2, eff. November 1, 2006; amended, Virginia Register Volume 33, Issue 10, eff. February 8, 2017.

9VAC25-820-60. Termination of permit coverage.

The owner shall terminate coverage under this general permit concurrently with any request for termination of the individual permit or permits in accordance with 9VAC25-31-370.

Statutory Authority

§ 62.1-44.15 of the Code of Virginia.

Historical Notes

Derived from Virginia Register Volume 23, Issue 2, eff. November 1, 2006; amended, Virginia Register Volume 33, Issue 10, eff. February 8, 2017.

9VAC25-820-70. General permit.

Any owner whose registration statement is accepted by the board will receive the following general permit and shall comply with the requirements of the general permit.

General Permit No.: VAN000000
Effective Date: January 1, 2022
Expiration Date: December 31, 2026

GENERAL PERMIT FOR TOTAL NITROGEN AND TOTAL PHOSPHORUS DISCHARGES AND NUTRIENT TRADING IN THE CHESAPEAKE WATERSHED IN VIRGINIA
AUTHORIZATION TO DISCHARGE UNDER THE VIRGINIA POLLUTANT DISCHARGE ELIMINATION SYSTEM AND THE VIRGINIA STATE WATER CONTROL LAW

In compliance with the provisions of the Clean Water Act, as amended, and pursuant to the State Water Control Law and regulations adopted pursuant to it, owners of facilities holding a VPDES individual permit or owners of facilities that otherwise meet the definition of an existing facility, with total nitrogen or total phosphorus discharges, or both to the Chesapeake Bay or its tributaries, are authorized to discharge to surface waters and exchange credits for total nitrogen or total phosphorus, or both.

The authorized discharge shall be in accordance with the registration statement filed with DEQ, this cover page, Part I-Special Conditions Applicable to All Facilities, Part II-Special Conditions Applicable to New and Expanded Facilities, and Part III-Conditions Applicable to All VPDES Permits, as set forth herein.

PART I

SPECIAL CONDITIONS APPLICABLE TO ALL FACILITIES

A. Authorized activities.

1. Authorization to discharge for owners of facilities required to register.

a. Every owner of a facility required to submit a registration statement to the department by November 1, 2021, and thereafter upon the reissuance of this general permit, shall be authorized to discharge total nitrogen and total phosphorus subject to the requirements of this general permit upon the department's approval of the registration statement.

b. Any owner of a facility required to submit a registration statement with the department at the time he makes application with the department for a new discharge or expansion that is subject to an offset or technology-based requirement in Part II of this general permit, shall be authorized to discharge total nitrogen and total phosphorus subject to the requirements of this general permit upon the department's approval of the registration statement.

c. Upon the department's approval of the registration statement, a facility will be included in the registration list maintained by the department.

2. Authorization to discharge for owners of facilities not required to register. Any owner of a facility authorized by a VPDES permit and not required by this general permit to submit a registration statement shall be deemed to be authorized to discharge total nitrogen and total phosphorus under this general permit at the time it is issued. Owners of facilities that are deemed to be permitted under this subsection shall have no obligation under this general permit prior to submitting a registration statement and securing coverage under this general permit based upon such registration statement.

3. Continuation of permit coverage.

a. Any owner authorized to discharge under this general permit and who submits a complete registration statement for the reissued general permit by November 1, 2026, in accordance with Part III M or who is not required to register in accordance with Part I A 2 is authorized to continue to discharge under the terms of this general permit until such time as the board either:

(1) Issues coverage to the owner under the reissued general permit, or

(2) Notifies the owner that the discharge is not eligible for coverage under this general permit.

b. When the owner that was covered under the expiring or expired general permit has violated or is violating the conditions of that permit, the board may choose to do any or all of the following:

(1) Initiate enforcement action based upon the 2017 general permit,

(2) Issue a notice of intent to deny coverage under the reissued general permit. If the general permit coverage is denied, the owner would then be required to cease the discharges authorized by the administratively continued coverage under the terms of the 2017 general permit or be subject to enforcement action for operating without a permit, or

(3) Take other actions authorized by the State Water Control Law.

B. Wasteload allocations.

1. Wasteload allocations allocated to permitted facilities pursuant to 9VAC25-720-50 C, 9VAC25-720-60 C, 9VAC25-720-70 C, 9VAC25-720-110 C, and 9VAC25-720-120 C of the Water Quality Management Planning Regulation, or applicable TMDLs, or wasteload allocations acquired by owners of new and expanding facilities to offset new or increased delivered total nitrogen and delivered total phosphorus loads from a new discharge or expansion under Part II B of this general permit, and existing loads calculated from the permitted design capacity of expanding facilities not previously covered by this general permit, shall be incorporated into the registration list maintained by the department. The wasteload allocations contained in this list shall be enforceable as annual mass load limits in this general permit. Credits shall not be generated by facilities whose operations were previously authorized by a Virginia Pollution Abatement (VPA) permit that was issued before July 1, 2005.

2. Except as described in subdivisions 2 c and 2 d of this subsection, an owner of two or more facilities covered by this general permit and discharging to the same tributary may apply for and receive an aggregated mass load limit for delivered total nitrogen and an aggregated mass load limit for delivered total phosphorus reflecting the total of the water quality-based total nitrogen and total phosphorus wasteload allocations or permitted design capacities established for such facilities individually.

a. The permittee (and all of the individual facilities covered under a single registration) shall be deemed to be in compliance when the aggregate mass load discharged by the facilities is less than the aggregate load limit.

b. The permittee will be eligible to generate credits only if the aggregate mass load discharged by the facilities is less than the total of the wasteload allocations assigned to any of the affected facilities.

c. The aggregation of mass load limits shall not affect any requirement to comply with local water quality-based limitations.

d. Facilities whose operations were previously authorized by a Virginia Pollution Abatement (VPA) permit that was issued before July 1, 2005, cannot be aggregated with other facilities under common ownership or operation.

e. Operation under an aggregated mass load limit in accordance with this section shall not be deemed credit acquisition as described in Part I J 2 of this general permit.

3. An owner that consolidates two or more facilities discharging to the same tributary into a single regional facility may apply for and receive an aggregated mass load limit for total nitrogen and an aggregated mass load limit for total phosphorus, subject to the following conditions:

a. Aggregate mass limits will be calculated accounting for delivery factors in effect at the time of the consolidation.

b. If all of the affected facilities have wasteload allocations in 9VAC25-720-50 C, 9VAC25-720-60 C, 9VAC25-720-70 C, 9VAC25-720-110 C, and 9VAC25-720-120 C of the Water Quality Management Planning Regulation, the aggregate mass load limit shall be calculated by adding the wasteload allocations of the affected facilities. The regional facility shall be eligible to generate credits.

c. If any, but not all, of the affected facilities has a wasteload allocation in 9VAC25-720-50 C, 9VAC25-720-60 C, 9VAC25-720-70 C, 9VAC25-720-110 C, and 9VAC25-720-120 C of the Water Quality Management Planning Regulation, the aggregate mass load limit shall be calculated by adding:

(1) Wasteload allocations of those facilities that have wasteload allocations in 9VAC25-720-50 C, 9VAC25-720-60 C, 9VAC25-720-70 C, 9VAC25-720-110 C, and 9VAC25-720-120 C of the Water Quality Management Planning Regulation;

(2) Permitted design capacities assigned to affected industrial facilities; and

(3) Loads from affected sewage treatment works that do not have a wasteload allocation in 9VAC25-720-50 C, 9VAC25-720-60 C, 9VAC25-720-70 C, 9VAC25-720-110 C, and 9VAC25-720-120 C of the Water Quality Management Planning Regulation, defined as the lesser of a previously calculated permitted design capacity, or the values calculated by the following formulae:

Nitrogen Load (lbs/ year) = flow (MGD) x 8.0 mg/l x 8.345 x 365 days/year

Phosphorus Load (lbs/ year) = flow (MGD) x 1.0 mg/l x 8.345 x 365 days/year

Flows used in the preceding formulae shall be the design flow of the treatment works from which the affected facility currently discharges.

The regional facility shall be eligible to generate credits.

d. If none of the affected facilities have a wasteload allocation in 9VAC25-720-50 C, 9VAC25-720-60 C, 9VAC25-720-70 C, 9VAC25-720-110 C, and 9VAC25-720-120 C of the Water Quality Management Planning Regulation, the aggregate mass load limit shall be calculated by adding the respective permitted design capacities for the affected facilities.

e. Facilities whose operations were previously authorized by a Virginia Pollution Abatement (VPA) permit that was issued before July 1, 2005, may be consolidated with other facilities under common ownership or operation, but their allocations cannot be transferred to the regional facility.

f. Facilities whose operations were previously authorized by a VPA permit that was issued before July 1, 2005, can become regional facilities, but they cannot receive additional allocations beyond those permitted in Part II B 1 d of this general permit.

4. Unless otherwise noted, the nitrogen and phosphorus wasteload allocations assigned to permitted facilities are considered total loads, including nutrients present in the intake water from the river, as applicable. On a case-by-case basis, an industrial discharger may demonstrate to the satisfaction of the board that a portion of the nutrient load originates in its intake water. This demonstration shall be consistent with the assumptions and methods used to derive the allocations through the Chesapeake Bay models. In these cases, the board may limit the permitted discharge to the net nutrient load portion of the assigned wasteload allocation.

5. Bioavailability. Unless otherwise noted, the entire nitrogen and phosphorus wasteload allocations assigned to permitted facilities are considered to be bioavailable to organisms in the receiving stream. On a case-by-case basis, a discharger may demonstrate to the satisfaction of the board that a portion of the nutrient load is not bioavailable; this demonstration shall not be based on the ability of the nutrient to resist degradation at the wastewater treatment plant, but instead, on the ability of the nutrient to resist degradation within a natural environment for the amount of time that it is expected to remain in the Chesapeake Bay watershed. This demonstration shall also be consistent with the assumptions and methods used to derive the allocations through the Chesapeake Bay models. In these cases, the board may limit the permitted discharge to the bioavailable portion of the assigned wasteload allocation.

C. Schedule of compliance.

1. For facilities listed in 9VAC25-820-80 A, compliance with reduced wasteload allocations established by the Enhanced Nutrient Removal Certainty Program shall be on the effective date of the reduced allocations as established in 9VAC25-720-60 and 9VAC25-720-120. For facilities listed in 9VAC25-820-80 B, compliance with chlorophyll-a based total phosphorus wasteload allocations shall be achieved as soon as possible but no later than January 1, 2026.

2. Following submission of compliance plans and compliance plan updates required by 9VAC25-820-40, the board shall reevaluate the schedule of compliance in subdivision 1 of this subsection, taking into account the information in the compliance plans and the factors in § 62.1-44.19:14 C 2 of the Code of Virginia. When warranted based on such information and factors, the board shall adjust the schedule in subdivision 1 of this subsection as appropriate by modification or reissuance of this general permit.

3. The registration list shall contain individual dates for compliance with wasteload allocations for dischargers, as follows:

a. Owners of facilities listed in 9VAC25-820-80 B will have individual dates for compliance based on their respective compliance plans that may be earlier than the schedule listed in subdivision 1 of this subsection.

b. Owners of facilities listed in 9VAC25-820-80 B that waive their compliance schedules in accordance with 9VAC25-820-40 A 2 b shall have an individual compliance date of January 1, 2023.

c. Upon completion of the projects contained in their compliance plans, owners of facilities listed in 9VAC25-820-80 B may receive a revised individual compliance date of January 1 for the calendar year immediately following the year in which a Certificate to Operate was issued for the capital projects, but not later than January 1, 2026.

d. Owners of new and expanded facilities will have individual dates for compliance corresponding to the date that coverage under this general permit was extended to discharges from the facility.

D. Annual update of compliance plan. Every owner of a facility required to submit a registration statement shall either individually or through the Virginia Nutrient Credit Exchange Association submit updated compliance plans to the department no later than February 1 of each year. The compliance plans shall contain sufficient information to document a plan to achieve and maintain compliance with applicable total nitrogen and total phosphorus individual wasteload allocations on the registration list and aggregate wasteload allocations in Part I C 3. Compliance plans for owners of facilities that were required to submit a registration statement with the department under Part I G 1 a may rely on the acquisition of point source credits in accordance with Part I J of this general permit to achieve compliance with the individual and combined wasteload allocations in each tributary. Annual compliance plan updates for facilities subject to reduced wasteload allocations and listed in 9VAC25-820-80 shall not rely on the acquisition of credits through payments into the Nutrient Offset Fund. Compliance plans for expansions or new discharges for owners of facilities that are required to submit a registration statement with the department under Part I G 1 b and c may rely on the acquisition of allocation in accordance with Part II B of this general permit to achieve compliance with the individual and combined wasteload allocations in each tributary.

E. Monitoring requirements.

1. Discharges shall be monitored by the permittee during weekdays as specified in the table below unless the department determines that weekday only sampling results in a non-representative load. Weekend monitoring or alternative monthly load calculations to address production schedules or seasonal flows shall be submitted to the department for review and approval on a case-by-case basis. Facilities that exhibit instantaneous discharge flows that vary from the daily average discharge flow by less than 10% may submit a proposal to the department to use an alternative sample type; such proposals shall be reviewed and approved by the department on a case-by-case basis.

Parameter

Sample Type and Collection Frequency

STP design flow

≥20.0 MGD

1.0 - 19.999 MGD

0.5 - 0.999 MGD

0.040 - 0.499 MGD

< 0.040 MGD

Effluent TN load limit for industrial facilities

≥100,000 lb/yr

50,000 - 99,999 lb/yr

487 - 49,999 lb/yr

< 487 lb/yr

Effluent TP load limit for industrial facilities

≥10,000 lb/yr

5,000 - 9,999 lb/yr

37 - 4,999 lb/yr

< 37 lb/yr

Flow

Totalizing, Indicating, and Recording

1/Day, see individual VPDES permit for sample type

Nitrogen Compounds (Total Nitrogen = TKN + NO2- (as N) + NO3- (as N))

24 HC
3 Days/Week

24 HC
2 Days/Week*

8 HC
2 Days/Week*

8 HC
2/Month, > 7 days apart

1/Month
Grab

Total Phosphorus

24 HC
3 Days/Week

24 HC
2 Days/Week*

8 HC
2 Days/Week*

8 HC
2/Month, > 7 days apart

1/Month
Grab

*Two flow composited samples taken in the same calendar week that are then composited by flow into a single weekly composite sample for analysis shall be considered to be in compliance with this requirement.

2. Monitoring for compliance with effluent limitations shall be performed in a manner identical to that used to determine compliance with effluent limitations established in the individual VPDES permit unless specified otherwise in subdivisions 3, 4, and 5 of Part I E. Monitoring or sampling shall be conducted according to analytical laboratory methods approved under 40 CFR Part 136, unless other test or sample collection procedures have been requested by the permittee and approved by the department in writing. All analysis for compliance with effluent limitations shall be conducted in accordance with 1VAC30-45, Certification for Noncommercial Environmental Laboratories, or 1VAC30-46, Accreditation for Commercial Environmental Laboratories. Monitoring may be performed by the permittee at frequencies more stringent than listed in subdivision 1 of Part I E; however, the permittee shall report all results of such monitoring.

3. Loading values greater than or equal to 10 pounds reported in accordance with Part I E and F of this general permit shall be calculated and reported to the nearest pound without regard to mathematical rules of precision. Loading values of less than 10 pounds reported in accordance with Part I E and F of this general permit shall be calculated and reported to at least two significant digits with the exception that all complete calendar year annual loads shall be reported to the nearest pound.

4. Data shall be reported on a form provided by the department, by the same date each month as is required by the owner's individual VPDES permit. The total monthly load shall be calculated in accordance with the following formula:

 http://leg5.state.va.us/images/490444572632DEQGC_files/image001.gif

where:

ML = total monthly load (lb/mo) = average daily load for the calendar month multiplied by the number of days of the calendar month on which a discharge occurred

DL = daily load = daily concentration (expressed as mg/l to the nearest 0.01 mg/l) multiplied by the flow volume of effluent discharged during the 24-hour period (expressed as MGD to at least the nearest 0.01 MGD and in no case less than two significant digits), multiplied by 8.345. Daily loads greater than or equal to 10 pounds may be rounded to the nearest whole number to convert to pounds per day (lbs/day). Daily loads less than or equal to 10 pounds may be rounded to no fewer than two significant figures.

s = number of days in the calendar month in which a sample was collected and analyzed

d = number of discharge days in the calendar month

For total phosphorus, all daily concentration data below the quantification level (QL) for the analytical method used shall be treated as half the QL. All daily concentration data equal to or above the QL for the analytical method used shall be treated as it is reported. If all data are below the QL, then the average shall be reported as half the QL.

For total nitrogen (TN), if none of the daily concentration data for the respective species (i.e., TKN, nitrates/nitrites) are equal to or above the QL for the respective analytical methods used, the daily TN concentration value reported shall equal one half of the largest QL used for the respective species. If one of the data is equal to or above the QL, the daily TN concentration value shall be treated as that data point as reported. If more than one of the data is above the QL, the daily TN concentration value shall equal the sum of the data points as reported.

The quantification levels shall be less than or equal to the following concentrations:

Parameter

Quantification Level

TKN

0.50 mg/l

Nitrite

0.10 mg/l

Nitrate

0.20 mg/l

Nitrite + Nitrate

0.20 mg/l

Higher QLs may be approved on a case-by-case basis where a higher QL routinely results in reportable results of the species in question or is otherwise technically appropriate based on standard lab practices.

The total year-to-date mass load shall be calculated in accordance with the following formula:

 http://leg5.state.va.us/images/490509944083DEQGC_files/image001.gif

where:

AL-YTD = calendar year-to-date annual load (lb/yr)

ML = total monthly load (lb/mo)

The total annual mass load shall be calculated in accordance with the following formula:

 http://leg5.state.va.us/images/490510092403DEQGC_files/image001.gif

where:

AL = calendar year annual load (lb/yr)

ML = total monthly load (lb/mo)

5. The department may authorize a chemical usage evaluation as an alternative means of determining nutrient loading for outfalls where the only source of nutrients is that found in the surface water intake and chemical additives used by the facility. Such an evaluation shall be submitted to the department for review and approval on a case-by-case basis. Implementation of approved chemical usage evaluations shall satisfy the requirements specified under Part I E 1 and 2.

F. Annual reporting. On or before February 1, annually, each permittee shall file a discharge monitoring report with the department identifying the annual mass load of total nitrogen and the annual mass load of total phosphorus discharged by the permitted facility during the previous calendar year.

G. Requirement to register; exclusions.

1. The following owners are required to register for coverage under this general permit:

a. Every owner of an existing facility authorized by a VPDES permit to discharge 100,000 gallons or more per day from a sewage treatment work, or an equivalent load from an industrial facility, directly into tidal waters, or 500,000 gallons or more per day from a sewage treatment works, or an equivalent load from an industrial facility, directly into nontidal waters shall submit a registration statement to the department by November 1, 2016, and thereafter upon the reissuance of this general permit in accordance with Part III M. The conditions of this general permit will apply to such owner upon approval of a registration statement.

b. Any owner of a facility authorized by a Virginia Pollutant Discharge Elimination System permit to discharge 40,000 gallons or more per day from a sewage treatment works, or an equivalent load from an industrial facility, directly into tidal or nontidal waters shall submit a registration statement with the department at the time he makes application for an individual permit with the department for a new discharge or expansion that is subject to an offset requirement in Part II of this general permit or to a technology-based requirement in 9VAC25-40-70, and thereafter upon the reissuance of this general permit in accordance with Part III M. The conditions of this general permit will apply to such owner beginning January 1 of the calendar year immediately following approval of a registration statement and issuance or modification of the individual permit.

c. Any owner of a facility treating domestic sewage authorized by a VPDES permit with a discharge greater than 1,000 gallons per day up to and including 39,999 gallons per day that did not commence the discharge of pollutants prior to January 1, 2011, and is subject to offset requirements in accordance with Part II A 1 c of this general permit shall submit a registration statement with the department at the time the owner makes application for an individual permit with the department or prior to commencing a discharge, whichever occurs first, and thereafter upon the reissuance of this general permit in accordance with Part III M.

2. All other categories of discharges are excluded from registration under this general permit.

H. Registration statement.

1. The registration statement shall contain the following information:

a. Name, mailing address and telephone number, email address, and fax number of the owner (and facility operator, if different from the owner) applying for permit coverage;

b. Name (or other identifier), address, city or county, contact name, phone number, email address, and fax number for the facility for which the registration statement is submitted;

c. VPDES permit numbers for all permits assigned to the facility, or pursuant to which the discharge is authorized;

d. If applying for an aggregated wasteload allocation in accordance with Part I B 2 of this permit, a list of all affected facilities and the VPDES permit numbers assigned to these facilities;

e. For new and expanded facilities, a plan to offset new or increased delivered total nitrogen and delivered total phosphorus loads, including the amount of wasteload allocation acquired. Wasteload allocations or credits sufficient to offset projected nutrient loads must be provided for period of at least five years; and

f. For existing facilities, the amount of a facility's wasteload allocation transferred to or from another facility to offset new or increased delivered total nitrogen and delivered total phosphorus loads from a new discharge or expansion.

2. The registration statement shall be submitted to the DEQ Central Office, Office of VPDES Permits. Following notification from the department of the start date for the required electronic submission of Notices of Intent to Discharge forms (i.e., registration statements), as provided for in 9VAC25-31-1020, such form submitted after that date shall be electronically submitted to the department in compliance with this section and 9VAC25-31-1020. At least three months' notice shall be provided between the notification from the department and the date after which such forms must be submitted electronically.

3. An amended registration statement shall be submitted to DEQ immediately upon the acquisition or transfer of a facility's wasteload allocation to offset new or increased delivered total nitrogen and delivered total phosphorus loads from a new discharge or expansion.

I. Public notice for registration statements proposing modifications or incorporations of new wasteload allocations or delivery factors.

1. All public notices issued pursuant to a proposed modification or incorporation of a (i) new wasteload allocation to offset new or increased delivered total nitrogen and delivered total phosphorus loads from a new discharge or expansion or (ii) delivery factor shall be published once a week for two consecutive weeks in a local newspaper of general circulation serving the locality where the facility is located informing the public that the owner of the facility intends to apply for coverage under this general permit. At a minimum, the notice shall include:

a. A statement of the owner's intent to register for coverage under this general permit;

b. A brief description of the facility and its location;

c. The amount of wasteload allocation that will be acquired or transferred if applicable;

d. The delivery factor for a new discharge or expansion;

e. If applicable, any proposed nonpoint source to point source trading ratio less than 2:1 proposed under Part II B 1 b (1);

f. A statement that the purpose of the public participation is to acquaint the public with the technical aspects of the facility and how the standards and the requirements of this chapter will be met, to identify issues of concern, to facilitate communication, and to establish a dialogue between the owner and persons who may be affected by the discharge from the facility;

g. An announcement of a 30-day comment period and the name, telephone number, and address of the owner's representative who can be contacted by the interested persons to answer questions;

h. The name, telephone number, and address of the DEQ representative who can be contacted by the interested persons to answer questions, or where comments shall be sent; and

i. The location where copies of the documentation to be submitted to the department in support of this general permit notification and any supporting documents can be viewed and copied.

2. The owner shall place a copy of the documentation and support documents in a location accessible to the public in the vicinity of the proposed facility.

3. The public shall be provided 30 days to comment on the technical and the regulatory aspects of the proposal. The comment period will begin on the date the notice is published in the local newspaper.

J. Compliance with wasteload allocations.

1. Methods of compliance. The owner of the permitted facility shall comply with its wasteload allocation contained in the registration list maintained by the department. The owner of the permitted facility shall be in compliance with its wasteload allocation if:

a. The annual mass load is less than or equal to the applicable wasteload allocation assigned to the facility in this general permit (or permitted design capacity for expanded facilities without allocations);

b. The owner of the permitted facility acquires sufficient point source nitrogen or phosphorus credits in accordance with subdivision 2 of this subsection; provided, however, that the acquisition of nitrogen or phosphorus credits pursuant to this section shall not alter or otherwise affect the individual wasteload allocations for each permitted facility; or

c. In the event he is unable to meet the individual wasteload allocation pursuant to subdivision 1 a or 1 b of this subsection, the owner of the permitted facility acquires sufficient nitrogen or phosphorus credits through payments made into the Nutrient Offset Fund pursuant to subdivision 3 of this subsection; provided, however, that the acquisition of nitrogen or phosphorus credits pursuant to this section shall not alter or otherwise affect the individual wasteload allocations for each permitted facility.

2. Credit acquisition from owners of permitted facilities. A permittee may acquire point source nitrogen credits or point source phosphorus credits from one or more owners of permitted facilities only if:

a. The credits are generated and applied to a compliance obligation in the same calendar year;

b. The credits are generated by one or more permitted facilities in the same tributary, except that owners of permitted facilities in the Eastern Shore Basin may also acquire credits from owners of permitted facilities in the Potomac and Rappahannock tributaries. Owners of Eastern Shore Basin facilities may acquire credits from the owners of Potomac tributary facilities at a trading ratio of 1:1. A trading ratio of 1.3:1 shall apply to the acquisition of credits from the owners of a Rappahannock tributary facility by the owner of an Eastern Shore Basin facility;

c. The exchange or acquisition of credits does not affect any requirement to comply with local water quality-based limitations as determined by the board;

d. The credits are acquired no later than June 1 immediately following the calendar year in which the credits are applied;

e. The credits are generated by a facility that has been constructed, and has discharged from treatment works whose design flow or equivalent industrial activity is the basis for the facility's wasteload allocations (until a facility is constructed and has commenced operation, such credits are held, and may be sold, by the Nutrient Offset Fund; and

f. No later than June 1 immediately following the calendar year in which the credits are applied, the permittee certifies on a credit exchange notification form supplied by the department that he has acquired sufficient credits to satisfy his compliance obligations. The permittee shall comply with the terms and conditions contained in the credit exchange notification form submitted to the department.

3. Credit acquisitions from the Nutrient Offset Fund. Until such time as the board finds that no allocations are reasonably available in an individual tributary, permittees that cannot meet their total nitrogen or total phosphorus effluent limit may acquire nitrogen or phosphorus credits through payments made into the Nutrient Offset Fund established in § 10.1-2128.2 of the Code of Virginia only if, no later than June 1 immediately following the calendar year in which the credits are to be applied, the permittee certifies on a form supplied by the department that he has diligently sought, but has been unable to acquire, sufficient credits to satisfy his compliance obligations through the acquisition of point source nitrogen or phosphorus credits with other permitted facilities, and that he has acquired sufficient credits to satisfy his compliance obligations through one or more payments made in accordance with the terms of this general permit. Such certification may include providing a record of solicitation or demonstration that point source allocations are not available for sale in the tributary in which the permittee's facility is located. Payments to the Nutrient Offset Fund shall be in the amount of $5.08 for each pound of nitrogen and $11.15 for each pound of phosphorus and shall be subject to the following requirements:

a. The credits are generated and applied to a compliance obligation in the same calendar year.

b. The credits are generated in the same tributary, except that owners of permitted facilities in the Eastern Shore Basin may also acquire credits from the owners of facilities that discharge to the Potomac and Rappahannock tributaries. Owners of Eastern Shore Basin facilities may acquire credits from the owners of facilities that discharge to a Potomac tributary at a trading ratio of 1:1. A trading ratio of 1.3:1 shall apply to the acquisition of credits from owners of facilities that discharge to a Rappahannock tributary by the owners of an Eastern Shore Basin facility.

c. The acquisition of credits does not affect any requirement to comply with local water quality-based limitations, as determined by the board.

4. This general permit neither requires nor prohibits a municipality or regional sewerage authority's development and implementation of trading programs among industrial users, which are consistent with the pretreatment regulatory requirements at 40 CFR Part 403 and the municipality's or authority's individual VPDES permit.

Part II

SPECIAL CONDITIONS APPLICABLE TO NEW AND EXPANDED FACILITIES

A. Offsetting mass loads discharged by new and expanded facilities.

1. An owner of a new or expanded facility shall comply with the applicable requirements of this section as a condition of the facility's coverage under this general permit.

a. An owner of a facility authorized by a VPDES permit first issued before July 1, 2005, that expands the facility to discharge 40,000 gallons or more per day, or an equivalent load, shall demonstrate to the department that he has acquired wasteload allocations sufficient to offset any increase in his delivered total nitrogen and delivered total phosphorus loads resulting from any expansion beyond his permitted capacity as of July 1, 2005.

b. An owner of a facility authorized by a VPDES permit first issued on or after July 1, 2005, to discharge 40,000 gallons or more per day, or an equivalent load, shall demonstrate to the department that he has acquired wasteload allocations sufficient to offset his delivered total nitrogen and delivered total phosphorus loads.

c. An owner of a facility treating domestic sewage authorized by a VPDES permit with a discharge greater than 1,000 gallons per day up to and including 39,999 gallons per day that did not commence the discharge of pollutants prior to January 1, 2011, shall demonstrate to the department that he has acquired wasteload allocations sufficient to offset his delivered total nitrogen and delivered phosphorus loads prior to commencing the discharge, except when the facility is for short-term temporary use only as determined by the department or when treatment of domestic sewage is not the primary purpose of the facility.

2. Offset calculations shall address the proposed discharge that exceeds:

a. The applicable wasteload allocation assigned to discharges from the facility in this general permit, for expanding significant dischargers with a wasteload allocation listed in 9VAC25-720-50 C, 9VAC25-720-60 C, 9VAC25-720-70 C, 9VAC25-720-110 C, and 9VAC25-720-120 C of the Water Quality Management Planning Regulation;

b. The permitted design capacity, for all other expanding dischargers; and

c. Zero, for facilities with a new discharge.

3. An owner of multiple facilities that discharge into the same tributary, and assigned an aggregate mass load limit in accordance with Part I B 2 of this general permit, that undertakes construction of new or expanded facilities shall be required to acquire wasteload allocations sufficient to offset any increase in delivered total nitrogen and delivered total phosphorus loads resulting from any expansion beyond the aggregate mass load limit assigned these facilities.

B. Acquisition of wasteload allocations. Wasteload allocations required by this section to offset new or increased delivered total nitrogen and delivered total phosphorus loads shall be acquired in accordance with this section.

1. Such allocations may be acquired from one or a combination of the following:

a. Acquisition of all or a portion of the wasteload allocations or point source nitrogen or point source phosphorus credits from the owners of one or more permitted facilities, based on delivered pounds by the respective trading parties as listed by the department;

b. Acquisition of credits certified by the board pursuant to § 62.1-44.19:20 of the Code of Virginia. Credits used to offset new or increased nutrient loads under this subdivision shall be:

(1) Subject to a trading ratio of two pounds reduced for every pound to be discharged if certified as a nonpoint source credit by the board pursuant to § 62.1-44.19:20 of the Code of Virginia. On a case-by-case basis the board may approve nonpoint source to source trading ratios of less than 2:1 (but not less than 1:1) when the applicant demonstrates factors that ameliorate the presumed 2:1 uncertainty ratio for credits generation by nonpoint sources such as:

(a) When direct and representative monitoring of the pollutant loadings from a nonpoint source is performed in a manner and at a frequency similar to that performed at VPDES point sources and there is consistency in the effectiveness of the operation of the nonpoint source best management practice (BMP) approaching that of a conventional point source.

(b) When nonpoint source credits are generated from land conservation that ensures permanent protection through a conservation easement or other instrument attached to the deed and when load reductions can be reliably determined;

(2) Calculated using best management practices efficiency rates and attenuation rates, as established by the latest science and relevant technical information, and approved by the board;

(3) Based on appropriate delivery factors, as established by the latest science and relevant technical information, and approved by the board;

(4) Demonstrated to have achieved reductions beyond those already required by or funded under federal or state law, or by Virginia's Chesapeake Bay TMDL Watershed Implementation Plan;

(5) Generated in accordance with conditions of the facility's individual VPDES permit; and

(6) In the case of credits generated by land use conversions and urban source reduction controls (BMPs), the credits shall represent nutrient reductions beyond those in place as of July 1, 2005;

c. Until such time as the board finds that no allocations are reasonably available in an individual tributary, acquisition of allocations through payments made into the Nutrient Offset Fund established in § 10.1-2128.2 of the Code of Virginia; or

d. Acquisition of allocations through such other means as may be approved by the department on a case-by-case basis. This includes allocations granted by the board to an owner of a facility that is authorized by a VPA permit to land apply domestic sewage if:

(1) The VPA permit was issued before July 1, 2005;

(2) The allocation does not exceed the facility's permitted design capacity as of July 1, 2005;

(3) The waste treated by the facility that is covered under the VPA permit will be treated and discharged pursuant to a VPDES permit for a new discharge; and

(4) The owner installs state-of-the-art nutrient removal technology at such a facility.

2. Acquisition of allocations or point source nitrogen or point source phosphorus credits is subject to the following conditions:

a. The allocations or credits shall be generated and applied to an offset obligation in the same calendar year in which the credit is generated;

b. The allocations or credits shall be generated in the same tributary;

c. Such acquisition does not affect any requirement to comply with local water quality-based limitations, as determined by the board;

d. The allocations are authenticated (i.e., verified to have been generated) by the permittee as required by the facility's individual VPDES permit, utilizing procedures approved by the board, no later than February 1 immediately following the calendar year in which the allocations are applied; and

e. If obtained from the owner of a permitted point source, the allocations shall be generated by a facility that has been constructed, and has discharged from treatment works whose design flow or equivalent industrial activity is the basis for the facility's wasteload allocations.

f. Such allocations or credits shall be secured for a period of five years with each registration under the general permit.

3. Priority of options. The board shall give priority to allocations or credits acquired in accordance with subdivisions 1 a, b, and d of this subsection. The board shall approve allocations acquired in accordance with subdivision 1 c of this subsection only after the owner has demonstrated that he has made a good faith effort to acquire sufficient allocations in accordance with subdivisions 1 a and 1 b of this subsection, and that such allocations are not reasonably available taking into account timing, cost and other relevant factors. Such demonstration may include providing a record of solicitation, or other demonstration that point source allocations or nonpoint source allocations are not available for sale in the tributary in which the permittee's facility discharge is located.

4. Annual allocation acquisitions from the Nutrient Offset Fund. The cost for each pound of nitrogen and each pound of phosphorus shall be determined at the time payment is made to the Nutrient Offset Fund, based on the higher of (i) the estimated cost of achieving a reduction of one pound of nitrogen or phosphorus at the facility that is securing the allocation, or comparable facility, for each pound of allocation acquired; or (ii) the average cost, as determined by the department on an annual basis, of reducing two pounds of nitrogen or phosphorus from nonpoint sources in the same tributary for each pound of allocation acquired.

Part III

CONDITIONS APPLICABLE TO ALL VPDES PERMITS

A. Monitoring.

1. Samples and measurements taken as required by this permit shall be representative of the monitored activity.

2. Monitoring shall be conducted according to procedures approved under 40 CFR Part 136 or alternative methods approved by the U.S. Environmental Protection Agency, unless other procedures have been specified in this permit.

3. The permittee shall periodically calibrate and perform maintenance procedures on all monitoring and analytical instrumentation at intervals that will ensure accuracy of measurements.

4. Samples taken as required by this permit shall be analyzed in accordance with 1VAC30-45 (Certification for Noncommercial Environmental Laboratories) or 1VAC30-46 (Accreditation for Commercial Environmental Laboratories).

B. Records.

1. Records of monitoring information shall include:

a. The date, exact place, and time of sampling or measurements;

b. The individuals who performed the sampling or measurements;

c. The dates and times analyses were performed;

d. The individuals who performed the analyses;

e. The analytical techniques or methods used; and

f. The results of such analyses.

2. Except for records of monitoring information required by this permit related to the permittee's sewage sludge use and disposal activities, which shall be retained for a period of at least five years, the permittee shall retain records of all monitoring information, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, copies of all reports required by this permit, and records of all data used to complete the registration statement for this permit, for a period of at least three years from the date of the sample, measurement, report, or request for coverage. This period of retention shall be extended automatically during the course of any unresolved litigation regarding the regulated activity or regarding control standards applicable to the permittee or as requested by the board.

C. Reporting monitoring results.

1. The permittee shall submit the results of the monitoring required by this permit not later than the 10th day of the month after monitoring takes place, unless another reporting schedule is specified elsewhere in this permit. Monitoring results shall be submitted to the department's regional office.

2. Monitoring results shall be reported on a Discharge Monitoring Report (DMR) or on forms provided, approved, or specified by the department.

3. If the permittee monitors any pollutant specifically addressed by this permit more frequently than required by this permit using test procedures approved under 40 CFR Part 136 or using other test procedures approved by the U.S. Environmental Protection Agency or using procedures specified in this permit, the results of this monitoring shall be included in the calculation and reporting of the data submitted on the DMR or reporting form specified by the department.

4. Calculations for all limitations that require averaging of measurements shall utilize an arithmetic mean unless otherwise specified in this permit.

D. Duty to provide information. The permittee shall furnish to the department, within a reasonable time, any information that the board may request to determine whether cause exists for modifying, revoking and reissuing, or terminating coverage under this permit or to determine compliance with this permit. The board may require the permittee to furnish, upon request, such plans, specifications, and other pertinent information as may be necessary to determine the effect of the wastes from the discharge on the quality of state waters or such other information as may be necessary to accomplish the purposes of the State Water Control Law. The permittee shall also furnish to the department, upon request, copies of records required to be kept by this permit.

E. Compliance schedule reports. Reports of compliance or noncompliance with, or any progress reports on, interim and final requirements contained in any compliance schedule of this permit shall be submitted no later than 14 days following each schedule date.

F. Unauthorized discharges. Except in compliance with this permit or another permit issued by the board, it shall be unlawful for any person to:

1. Discharge into state waters sewage, industrial wastes, other wastes, or any noxious or deleterious substances; or

2. Otherwise alter the physical, chemical, or biological properties of such state waters and make them detrimental to the public health, to animal or aquatic life, or to the use of such waters for domestic or industrial consumption, for recreation, or for other uses.

G. Reports of unauthorized discharges. Any permittee that discharges or causes or allows a discharge of sewage, industrial waste, other wastes, or any noxious or deleterious substance into or upon state waters in violation of Part III F, or that discharges or causes or allows a discharge that may reasonably be expected to enter state waters in violation of Part III F, shall notify the department of the discharge immediately upon discovery of the discharge, but in no case later than 24 hours after said discovery. A written report of the unauthorized discharge shall be submitted to the department within five days of discovery of the discharge. The written report shall contain:

1. A description of the nature and location of the discharge;

2. The cause of the discharge;

3. The date on which the discharge occurred;

4. The length of time that the discharge continued;

5. The volume of the discharge;

6. If the discharge is continuing, how long it is expected to continue;

7. If the discharge is continuing, what the expected total volume of the discharge will be; and

8. Any steps planned or taken to reduce, eliminate, and prevent a recurrence of the present discharge or any future discharge not authorized by this permit.

Discharges reportable to the department under the immediate reporting requirements of other regulations are exempted from this requirement.

H. Reports of unusual or extraordinary discharges. If any unusual or extraordinary discharge including a bypass or upset should occur from a treatment works and the discharge enters or could be expected to enter state waters, the permittee shall promptly notify, in no case later than 24 hours, the department by telephone after the discovery of the discharge. This notification shall provide all available details of the incident, including any adverse effects on aquatic life and the known number of fish killed. The permittee shall reduce the report to writing and shall submit it to the department within five days of discovery of the discharge in accordance with Part III I 2. Unusual and extraordinary discharges include, but are not limited to, any discharge resulting from:

1. Unusual spillage of materials resulting directly or indirectly from processing operations;

2. Breakdown of processing or accessory equipment;

3. Failure or taking out of service some or all of the treatment works; and

4. Flooding or other acts of nature.

I. Reports of noncompliance. The permittee shall report any noncompliance that may adversely affect state waters or may endanger public health.

1. An oral report shall be provided within 24 hours from the time the permittee becomes aware of the circumstances. The following shall be included as information that shall be reported within 24 hours under this paragraph:

a. Any unanticipated bypass; and

b. Any upset that causes a discharge to surface waters.

2. A written report shall be submitted within five days and shall contain:

a. A description of the noncompliance and its cause;

b. The period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is expected to continue; and

c. Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance.

The board may waive the written report on a case-by-case basis for reports of noncompliance under Part III I if the oral report has been received within 24 hours and no adverse impact on state waters has been reported.

3. The permittee shall report all instances of noncompliance not reported under Part III I 1 or 2, in writing, at the time the next monitoring reports are submitted. The reports shall contain the information listed in Part III I 2.

NOTE: The immediate (within 24 hours) reports required in Part III G, H, and I may be made to the department's regional office. Reports may be made by telephone or online at https://www.deq.virginia.gov/our-programs/pollution-response. For reports outside normal working hours, a message may be left and this shall fulfill the immediate reporting requirement. For emergencies, the Virginia Department of Emergency Management maintains a 24-hour telephone service at 1-800-468-8892.

4. When the permittee becomes aware that it failed to submit any relevant facts in a permit registration statement or submitted incorrect information in a permit registration statement or in any report to the department, the permittee shall promptly submit such facts or information.

J. Notice of planned changes.

1. The permittee shall give notice to the department as soon as possible of any planned physical alterations or additions to the permitted facility. Notice is required only when:

a. The permittee plans alteration or addition to any building, structure, facility, or installation from which there is or may be a discharge of pollutants, the construction of which commenced:

(1) After promulgation of standards of performance under § 306 of the Clean Water Act (33 USC § 1251 et seq.) that are applicable to such source; or

(2) After proposal of standards of performance in accordance with § 306 of the Clean Water Act that are applicable to such source, but only if the standards are promulgated in accordance with § 306 of the Clean Water Act within 120 days of their proposal;

b. The alteration or addition could significantly change the nature or increase the quantity of pollutants discharged. This notification applies to pollutants that are subject neither to effluent limitations nor to notification requirements specified elsewhere in this permit; or

c. The alteration or addition results in a significant change in the permittee's sludge use or of disposal practices, and such alteration, addition, or change may justify the application of permit conditions that are different from or absent in the existing permit, including notification of additional use or of disposal sites not reported during the permit application process or not reported pursuant to an approved land application plan.

2. The permittee shall give advance notice to the department of any planned changes in the permitted facility or activity that may result in noncompliance with permit requirements.

K. Signatory requirements.

1. Registration statement. All registration statements shall be signed as follows:

a. For a corporation: by a responsible corporate officer. For the purpose of this section, a responsible corporate officer means (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy-making or decision-making functions for the corporation or (ii) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations and initiating and directing other comprehensive measures to assure long-term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or other actions taken to gather complete and accurate information for permit registration requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures;

b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or

c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this section, a principal executive officer of a public agency includes (i) the chief executive officer of the agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency.

2. Reports, etc. All reports required by permits and other information requested by the board shall be signed by a person described in Part III K 1 or by a duly authorized representative of that person. A person is a duly authorized representative only if:

a. The authorization is made in writing by a person described in Part III K 1;

b. The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. A duly authorized representative may thus be either a named individual or any individual occupying a named position; and

c. The written authorization is submitted to the department.

3. Changes to authorization. If an authorization under Part III K 2 is no longer accurate because a different individual or position has responsibility for the overall operation of the facility, a new authorization satisfying the requirements of Part III K 2 shall be submitted to the department prior to or together with any reports, or information to be signed by an authorized representative.

4. Certification. Any person signing a document under Part III K 1 or 2 shall make the following certification:

"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."

L. Duty to comply. The permittee shall comply with all conditions of this permit. Any permit noncompliance constitutes a violation of the State Water Control Law and the Clean Water Act, except that noncompliance with certain provisions of this permit may constitute a violation of the State Water Control Law but not the Clean Water Act. Permit noncompliance is grounds for enforcement action, permit coverage termination, or denial of a permit coverage renewal application.

The permittee shall comply with effluent standards or prohibitions established under § 307(a) of the Clean Water Act for toxic pollutants and with standards for sewage sludge use or disposal established under § 405(d) of the Clean Water Act within the time provided in the regulations that establish these standards or prohibitions or standards for sewage sludge use or disposal, even if this permit has not yet been modified to incorporate the requirement.

M. Duty to reapply. If the permittee wishes to continue an activity regulated by this permit after the expiration date of this permit, the permittee shall submit a new registration statement at least 60 days before the expiration date of the existing permit, unless permission for a later date has been granted by the board. The board shall not grant permission for registration statements to be submitted later than the expiration date of the existing permit.

N. Effect of a permit. This permit does not convey any property rights in either real or personal property or any exclusive privileges, nor does it authorize any injury to private property or invasion of personal rights or any infringement of federal, state, or local law or regulations.

O. State law. Nothing in this permit shall be construed to preclude the institution of any legal action under, or relieve the permittee from any responsibilities, liabilities, or penalties established pursuant to, any other state law or regulation or under authority preserved by § 510 of the Clean Water Act. Except as provided in permit conditions on "bypassing" (Part III U) and "upset" (Part III V), nothing in this permit shall be construed to relieve the permittee from civil and criminal penalties for noncompliance.

P. Oil and hazardous substance liability. Nothing in this permit shall be construed to preclude the institution of any legal action or relieve the permittee from responsibilities, liabilities, or penalties to which the permittee is or may be subject under §§ 62.1-44.34:14 through 62.1-44.34:23 of the State Water Control Law.

Q. Proper operation and maintenance. The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances) that are installed or used by the permittee to achieve compliance with the conditions of this permit. Proper operation and maintenance also include effective plant performance, adequate funding, adequate staffing, and adequate laboratory and process controls, including appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems that are installed by the permittee only when the operation is necessary to achieve compliance with the conditions of this permit.

R. Disposal of solids or sludges. Solids, sludges, or other pollutants removed in the course of treatment or management of pollutants shall be disposed of in a manner so as to prevent any pollutant from such materials from entering state waters.

S. Duty to mitigate. The permittee shall take all reasonable steps to minimize or prevent any discharge or sludge use or disposal in violation of this permit that has a reasonable likelihood of adversely affecting human health or the environment.

T. Need to halt or reduce activity not a defense. It shall not be a defense for a permittee in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this permit.

U. Bypass.

1. "Bypass" means the intentional diversion of waste streams from any portion of a treatment facility. The permittee may allow any bypass to occur that does not cause effluent limitations to be exceeded, but only if it also is for essential maintenance to ensure efficient operation. These bypasses are not subject to the provisions of Part III U 2 and 3.

2. Notice.

a. Anticipated bypass. If the permittee knows in advance of the need for a bypass, prior notice shall be submitted, if possible, at least 10 days before the date of the bypass.

b. Unanticipated bypass. The permittee shall submit notice of an unanticipated bypass as required in Part III I.

3. Prohibition of bypass.

a. Bypass is prohibited, and the board may take enforcement action against a permittee for bypass, unless:

(1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage;

(2) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass that occurred during normal periods of equipment downtime or preventive maintenance; and

(3) The permittee submitted notices as required under Part III U 2.

b. The board may approve an anticipated bypass after considering its adverse effects if the board determines that it will meet the three conditions listed in Part III U 3 a.

V. Upset.

1. An upset, defined in 9VAC25-31-10, constitutes an affirmative defense to an action brought for noncompliance with technology-based permit effluent limitations if the requirements of Part III V 2 are met. A determination made during administrative review of claims that noncompliance was caused by upset, and before an action for noncompliance, is not a final administrative action subject to judicial review.

2. A permittee who wishes to establish the affirmative defense of upset shall demonstrate through properly signed, contemporaneous operating logs, or other relevant evidence that:

a. An upset occurred and that the permittee can identify the cause or causes of the upset;

b. The permitted facility was at the time being properly operated;

c. The permittee submitted notice of the upset as required in Part III I; and

d. The permittee complied with remedial measures required under Part III S.

3. In any enforcement proceeding the permittee seeking to establish the occurrence of an upset has the burden of proof.

W. Inspection and entry. The permittee shall allow the director, or an authorized representative (including an authorized contractor acting as a representative of the administrator) upon presentation of credentials and other documents as may be required by law, to:

1. Enter upon the permittee's premises where a regulated facility or activity is located or conducted, or where records must be kept under the conditions of this permit;

2. Have access to and copy, at reasonable times, any records that must be kept under the conditions of this permit;

3. Inspect at reasonable times facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this permit; and

4. Sample or monitor at reasonable times, for the purposes of assuring permit compliance or as otherwise authorized by the Clean Water Act and the State Water Control Law, substances or parameters at any location.

For purposes of this section, the time for inspection shall be deemed reasonable during regular business hours or whenever the facility is discharging. Nothing contained herein shall make an inspection unreasonable during an emergency.

X. Permit actions. Permits may be modified, revoked and reissued, or terminated for cause. The filing of a request by the permittee for a permit modification, revocation and reissuance, termination, or notification of planned changes or anticipated noncompliance does not stay any permit condition.

Y. Transfer of permit coverage. Permit coverage is not transferable to any person except after notice to the department. Coverage under this permit may be automatically transferred to a new permittee if:

1. The current permittee notifies the department within 30 days of the transfer of the title to the facility or property, unless permission for a later date has been granted by the board;

2. The notice includes a written agreement between the existing and new permittees containing a specific date for transfer of permit responsibility, coverage, and liability between them; and

3. The board does not notify the existing permittee and the proposed new permittee of its intent to deny the new permittee coverage under the permit. If this notice is not received, the transfer is effective on the date specified in the agreement described in Part III Y 2.

Z. Severability. The provisions of this permit are severable, and if any provision of this permit or the application of any provision of this permit to any circumstance is held invalid, the application of such provision to other circumstances, and the remainder of this permit, shall not be affected thereby.

Statutory Authority

§ 62.1-44.15 of the Code of Virginia; 33 USC § 1313(e) of the Clean Water Act.

Historical Notes

Derived from Virginia Register Volume 23, Issue 2, eff. November 1, 2006; amended, Virginia Register Volume 24, Issue 21, eff. August 7, 2008; Volume 28, Issue 4, eff. January 1, 2012; Volume 29, Issue 4, eff. November 21, 2012; Volume 33, Issue 10, eff. February 8, 2017; Volume 37, Issue 26, eff. January 1, 2022; Volume 39, Issue 7, eff. December 21, 2022; Volume 40, Issue 4, eff. October 9, 2023; Volume 40, Issue 9, eff. December 18, 2023.

9VAC25-820-80. Facilities subject to reduced individual total nitrogen and total phosphorus wasteload allocations.

A. Enhanced Nutrient Removal Certainty Program facilities

Facility

VPDES No.

HRSD - York River STP

VA0081311

HRSD - Boat Harbor STP

VA0081256

HRSD - James River STP

VA0081272

HRSD - Williamsburg STP

VA0081302

HRSD - Nansemond STP

VA0081299

HRSD - Army Base STP

VA0081230

HRSD - VIP WWTP

VA0081281

B.Chlorophyll-a based total phosphorus wasteload allocations.

Facility

VPDES No.

Richmond WWTP

VA0063177

Falling Creek WWTP

VA0024996

Proctor's Creek WWTP

VA0060194

Henrico County WWTP

VA0063690

Phillip Morris - Park 500

VA0026557

Hopewell WWTP

VA0066630

South Central Wastewater Authority WWTP

VA0025437

Statutory Authority

§ 62.1-44.15 of the Code of Virginia; 33 USC § 1313(e) of the Clean Water Act.

Historical Notes

Derived from Virginia Register Volume 28, Issue 4, eff. January 1, 2012; amended, Virginia Register Volume 33, Issue 10, eff. February 8, 2017; Volume 39, Issue 7, eff. December 21, 2022.

Forms (9VAC25-820)

General Virginia Pollutant Discharge Elimination System (VPDES) Permit Registration Statement for Total Nitrogen and Total Phosphorus Discharges and Nutrient Trading in the Chesapeake Bay Watershed in Virginia (rev. 9/2021).

Website addresses provided in the Virginia Administrative Code to documents incorporated by reference are for the reader's convenience only, may not necessarily be active or current, and should not be relied upon. To ensure the information incorporated by reference is accurate, the reader is encouraged to use the source document described in the regulation.

As a service to the public, the Virginia Administrative Code is provided online by the Virginia General Assembly. We are unable to answer legal questions or respond to requests for legal advice, including application of law to specific fact. To understand and protect your legal rights, you should consult an attorney.