LIS

Code of Virginia

Creating a Report: Check the sections you'd like to appear in the report, then use the "Create Report" button at the bottom of the page to generate your report. Once the report is generated you'll then have the option to download it as a pdf, print or email the report.

Code of Virginia
Title 28.2. Fisheries and Habitat of the Tidal Waters
Subtitle III. Habitat
Chapter 13. Wetlands
12/23/2024

Chapter 13. Wetlands.

Article 1. General Provisions.

§ 28.2-1300. Definitions.

As used in this chapter, unless the context requires a different meaning:

"Back Bay and its tributaries" means the following, as shown on the United States Geological Survey Quadrangle Sheets for Virginia Beach, North Bay, and Knotts Island: Back Bay north of the Virginia-North Carolina state line; Capsies Creek north of the Virginia-North Carolina state line; Deal Creek; Devil Creek; Nawney Creek; Redhead Bay, Sand Bay, Shipps Bay, North Bay, and the waters connecting them; Beggars Bridge Creek; Muddy Creek; Ashville Bridge Creek; Hells Point Creek; Black Gut; and all coves, ponds and natural waterways adjacent to or connecting with the above-named bodies of water.

"County, city, or town" means the governing body of the county, city, or town.

"Governmental activity" means any of the services provided by the Commonwealth or a county, city, or town to its citizens for the purpose of maintaining public facilities, including but not limited to, such services as constructing, repairing and maintaining roads; providing street lights and sewage facilities; supplying and treating water; and constructing public buildings.

"Nonvegetated wetlands" means unvegetated lands lying contiguous to mean low water and between mean low water and mean high water, including those unvegetated areas of Back Bay and its tributaries and the North Landing River and its tributaries subject to flooding by normal and wind tides but not hurricane or tropical storm tides.

"North Landing River and its tributaries" means the following, as shown on the United States Geological Survey Quadrangle Sheets for Pleasant Ridge, Creeds, and Fentress: the North Landing River from the Virginia-North Carolina line to Virginia Highway 165 at North Landing Bridge; the Chesapeake and Albemarle Canal from Virginia Highway 165 at North Landing Bridge to the locks at Great Bridge; and all named and unnamed streams, creeks and rivers flowing into the North Landing River and the Chesapeake and Albemarle Canal except West Neck Creek north of Indian River Road, Pocaty River west of Blackwater Road, Blackwater River west of its forks located at a point approximately 6400 feet due west of the point where Blackwater Road crosses the Blackwater River at the village of Blackwater, and Millbank Creek west of Blackwater Road.

"Vegetated wetlands" means lands lying between and contiguous to mean low water and an elevation above mean low water equal to the factor one and one-half times the mean tide range at the site of the proposed project in the county, city, or town in question, and upon which is growing any of the following species: saltmarsh cordgrass (Spartina alterniflora), saltmeadow hay (Spartina patens), saltgrass (Distichlis spicata), black needlerush (Juncus roemerianus), saltwort (Salicornia spp.), sea lavender (Limonium spp.), marsh elder (Iva frutescens), groundsel bush (Baccharis halimifolia), wax myrtle (Myrica sp.), sea oxeye (Borrichia frutescens), arrow arum (Peltandra virginica), pickerelweed (Pontederia cordata), big cordgrass (Spartina cynosuroides), rice cutgrass (Leersia oryzoides), wildrice (Zizania aquatica), bulrush (Scirpus validus), spikerush (Eleocharis sp.), sea rocket (Cakile edentula), southern wildrice (Zizaniopsis miliacea), cattail (Typha spp.), three-square (Scirpus spp.), buttonbush (Cephalanthus occidentalis), bald cypress (Taxodium distichum), black gum (Nyssa sylvatica), tupelo (Nyssa aquatica), dock (Rumex spp.), yellow pond lily (Nuphar sp.), marsh fleabane (Pluchea purpurascens), royal fern (Osmunda regalis), marsh hibiscus (Hibiscus moscheutos), beggar's tick (Bidens sp.), smartweed (Polygonum sp.), arrowhead (Sagittaria spp.), sweet flag (Acorus calamus), water hemp (Amaranthus cannabinus), reed grass (Phragmites communis), or switch grass (Panicum virgatum).

"Vegetated wetlands of Back Bay and its tributaries" or "vegetated wetlands of the North Landing River and its tributaries" means all marshes subject to flooding by normal and wind tides, but not hurricane or tropical storm tides, and upon which is growing any of the following species: saltmarsh cordgrass (Spartina alterniflora), saltmeadow hay (Spartina patens), black needlerush (Juncus roemerianus), marsh elder (Iva frutescens), groundsel bush (Baccharis halimifolia), wax myrtle (Myrica sp.), arrow arum (Peltandra virginica), pickerelweed (Pontederia cordata), big cordgrass (Spartina cynosuroides), rice cutgrass (Leersia oryzoides), wildrice (Zizania aquatica), bulrush (Scirpus validus), spikerush (Eleocharis sp.), cattail (Typha spp.), three-square (Scirpus spp.), dock (Rumex sp.), smartweed (Polygonum sp.), yellow pond lily (Nuphar sp.), royal fern (Osmunda regalis), marsh hibiscus (Hibiscus moscheutos), beggar's tick (Bidens sp.), arrowhead (Sagittaria sp.), water hemp (Amaranthus cannabinus), reed grass (Phragmites communis), or switch grass (Panicum virgatum).

"Wetlands" means both vegetated and nonvegetated wetlands.

"Wetlands board" or "board" means a board created pursuant to § 28.2-1303.

"Wetlands zoning ordinance" means the ordinance set forth in § 28.2-1302.

1972, c. 711, § 62.1-13.2; 1973, c. 388; 1974, c. 297; 1975, c. 268; 1979, c. 524; 1982, c. 300; 1992, c. 836.

§ 28.2-1301. Powers and duties of the Commission.

A. The Commission may receive gifts, grants, bequests, and devises of wetlands and money which shall be held for the uses prescribed by the donor, grantor, or testator and in accordance with the provisions of this chapter. The Commission shall manage any wetlands it receives so as to maximize their ecological value as provided in Article 2 (§ 28.2-1503 et seq.) of Chapter 15 of this title.

B. The Commission shall preserve and prevent the despoliation and destruction of wetlands while accommodating necessary economic development in a manner consistent with wetlands preservation and any standards set by the Commonwealth in addition to those identified in § 28.2-1308 to ensure protection of shorelines and sensitive coastal habitats from sea level rise and coastal hazards, including guidelines and minimum standards promulgated by the Commission pursuant to subsection C.

C. In order to perform its duties under this section and to assist counties, cities, and towns in regulating wetlands, the Commission shall promulgate and periodically update (i) guidelines that scientifically evaluate vegetated and nonvegetated wetlands by type and describe the consequences of use of these wetlands types and (ii) minimum standards for protection and conservation of wetlands. The Virginia Institute of Marine Science shall provide advice and assistance to the Commission in developing these guidelines and minimum standards by evaluating wetlands by type and continuously maintaining and updating an inventory of vegetated wetlands.

D. In developing guidelines, standards, or regulations under this chapter the Commission shall consult with all affected state agencies. Consistent with other legal rights, consideration shall be given to the unique character of the Commonwealth's tidal wetlands which are essential for the production of marine and inland wildlife, waterfowl, finfish, shellfish and flora; serve as a valuable protective barrier against floods, tidal storms and the erosion of the Commonwealth's shores and soil; are important for the absorption of silt and pollutants; and are important for recreational and aesthetic enjoyment of the people and for the promotion of tourism, navigation and commerce.

1972, c. 711, §§ 62.1-13.1, 62.1-13.4, 62.1-13.17; 1982, c. 300; 1990, c. 811; 1992, c. 836; 1995, c. 850; 2020, c. 809.

Article 2. Wetlands Zoning Ordinance and Wetlands Boards.

§ 28.2-1302. Adoption of wetlands zoning ordinance; terms of ordinance.

Any county, city or town may adopt the following ordinance, which, after January 1, 2024, shall serve as the only wetlands zoning ordinance under which any wetlands board is authorized to operate. Any county, city, or town that has adopted the ordinance prior to January 1, 2024, shall amend the ordinance to conform it to the ordinance contained herein by January 1, 2024.

Wetlands Zoning Ordinance

§ 1. The governing body of ________, acting pursuant to Chapter 13 (§ 28.2-1300 et seq.) of Title 28.2 of the Code of Virginia, adopts this ordinance regulating the use and development of wetlands.

§ 2. As used in this ordinance, unless the context requires a different meaning:

"Back Bay and its tributaries" means the following, as shown on the United States Geological Survey Quadrangle Sheets for Virginia Beach, North Bay, and Knotts Island: Back Bay north of the Virginia-North Carolina state line; Capsies Creek north of the Virginia-North Carolina state line; Deal Creek; Devil Creek; Nawney Creek; Redhead Bay, Sand Bay, Shipps Bay, North Bay, and the waters connecting them; Beggars Bridge Creek; Muddy Creek; Ashville Bridge Creek; Hells Point Creek; Black Gut; and all coves, ponds, and natural waterways adjacent to or connecting with the above-named bodies of water.

"Commission" means the Virginia Marine Resources Commission.

"Commissioner" means the Commissioner of Marine Resources.

"Governmental activity" means any of the services provided by this ________ (county, city, or town) to its citizens for the purpose of maintaining this ________ (county, city, or town), including but not limited to such services as constructing, repairing, and maintaining roads; providing sewage facilities and street lights; supplying and treating water; and constructing public buildings.

"Nonvegetated wetlands" means unvegetated lands lying contiguous to mean low water and between mean low water and mean high water, including those unvegetated areas of Back Bay and its tributaries and the North Landing River and its tributaries subject to flooding by normal and wind tides but not hurricane or tropical storm tides.

"North Landing River and its tributaries" means the following, as shown on the United States Geological Survey Quadrangle Sheets for Pleasant Ridge, Creeds, and Fentress: the North Landing River from the Virginia-North Carolina line to Virginia Highway 165 at North Landing Bridge; the Chesapeake and Albemarle Canal from Virginia Highway 165 at North Landing Bridge to the locks at Great Bridge; and all named and unnamed streams, creeks, and rivers flowing into the North Landing River and the Chesapeake and Albemarle Canal except West Neck Creek north of Indian River Road, Pocaty River west of Blackwater Road, Blackwater River west of its forks located at a point approximately 6400 feet due west of the point where Blackwater Road crosses the Blackwater River at the village of Blackwater, and Millbank Creek west of Blackwater Road.

"Person" means any individual, corporation, partnership, association, company, business, trust, joint venture, or other legal entity.

"Vegetated wetlands" means lands lying between and contiguous to mean low water and an elevation above mean low water equal to the factor one and one-half times the mean tide range at the site of the proposed project in the county, city, or town in question, and upon which is growing any of the following species: saltmarsh cordgrass (Spartina alterniflora), saltmeadow hay (Spartina patens), saltgrass (Distichlis spicata), black needlerush (Juncus roemerianus), saltwort (Salicornia spp.), sea lavender (Limonium spp.), marsh elder (Iva frutescens), groundsel bush (Baccharis halimifolia), wax myrtle (Myrica sp.), sea oxeye (Borrichia frutescens), arrow arum (Peltandra virginica), pickerelweed (Pontederia cordata), big cordgrass (Spartina cynosuroides), rice cutgrass (Leersia oryzoides), wildrice (Zizania aquatica), bulrush (Scirpus validus), spikerush (Eleocharis sp.), sea rocket (Cakile edentula), southern wildrice (Zizaniopsis miliacea), cattail (Typha spp.), three-square (Scirpus spp.), buttonbush (Cephalanthus occidentalis), bald cypress (Taxodium distichum), black gum (Nyssa sylvatica), tupelo (Nyssa aquatica), dock (Rumex spp.), yellow pond lily (Nuphar sp.), marsh fleabane (Pluchea purpurascens), royal fern (Osmunda regalis), marsh hibiscus (Hibiscus moscheutos), beggar's tick (Bidens sp.), smartweed (Polygonum sp.), arrowhead (Sagittaria spp.), sweet flag (Acorus calamus), water hemp (Amaranthus cannabinus), reed grass (Phragmites communis), or switch grass (Panicum virgatum).

"Vegetated wetlands of Back Bay and its tributaries" or "vegetated wetlands of the North Landing River and its tributaries" means all marshes subject to flooding by normal and wind tides but not hurricane or tropical storm tides, and upon which is growing any of the following species: saltmarsh cordgrass (Spartina alterniflora), saltmeadow hay (Spartina patens), black needlerush (Juncus roemerianus), marsh elder (Iva frutescens), groundsel bush (Baccharis halimifolia), wax myrtle (Myrica sp.), arrow arum (Peltandra virginica), pickerelweed (Pontederia cordata), big cordgrass (Spartina cynosuroides), rice cutgrass (Leersia oryzoides), wildrice (Zizania aquatica), bulrush (Scirpus validus), spikerush (Eleocharis sp.), cattail (Typha spp.), three-square (Scirpus spp.), dock (Rumex sp.), smartweed (Polygonum sp.), yellow pond lily (Nuphar sp.), royal fern (Osmunda regalis), marsh hibiscus (Hibiscus moscheutos), beggar's tick (Bidens sp.), arrowhead (Sagittaria sp.), water hemp (Amaranthus cannabinus), reed grass (Phragmites communis), or switch grass (Panicum virgatum).

"Wetlands" means both vegetated and nonvegetated wetlands.

"Wetlands board" or "board" means a board created pursuant to § 28.2-1303 of the Code of Virginia.

§ 3. The following uses of and activities in wetlands are authorized if otherwise permitted by law:

1. The construction and maintenance of noncommercial catwalks, piers, boathouses, boat shelters, fences, duckblinds, wildlife management shelters, footbridges, observation decks, and shelters and other similar structures, provided that such structures are so constructed on pilings as to permit the reasonably unobstructed flow of the tide and preserve the natural contour of the wetlands;

2. The cultivation and harvesting of shellfish, and worms for bait;

3. Noncommercial outdoor recreational activities, including hiking, boating, trapping, hunting, fishing, shellfishing, horseback riding, swimming, skeet and trap shooting, and shooting on shooting preserves, provided that no structure shall be constructed except as permitted in subdivision 1 of this section;

4. Other outdoor recreational activities, provided they do not impair the natural functions or alter the natural contour of the wetlands;

5. Grazing, haying, and cultivating and harvesting agricultural, forestry, or horticultural products;

6. Conservation, repletion, and research activities of the Commission, the Virginia Institute of Marine Science, the Department of Wildlife Resources and other conservation-related agencies;

7. The construction or maintenance of aids to navigation that are authorized by governmental authority;

8. Emergency measures decreed by any duly appointed health officer of a governmental subdivision acting to protect the public health;

9. The normal maintenance and repair of, or addition to, presently existing roads, highways, railroad beds, or facilities abutting on or crossing wetlands, provided that no waterway is altered and no additional wetlands are covered;

10. Governmental activity in wetlands owned or leased by the Commonwealth or a political subdivision thereof;

11. The normal maintenance of man-made drainage ditches, provided that no additional wetlands are covered. This subdivision does not authorize the construction of any drainage ditch; and

12. The construction of living shoreline projects authorized pursuant to a general permit developed under subsection B of § 28.2-104.1.

§ 4. A. Any person who desires to use or develop any wetland within this ________ (county, city, or town), other than for the purpose of conducting the activities specified in § 3 of this ordinance, shall first file an application for a permit directly with the wetlands board or with the Commission.

B. The permit application shall include the following: the name and address of the applicant; a detailed description of the proposed activities; a map, drawn to an appropriate and uniform scale, showing the area of wetlands directly affected, the location of the proposed work thereon, the area of existing and proposed fill and excavation, the location, width, depth, and length of any proposed channel and disposal area, and the location of all existing and proposed structures, sewage collection and treatment facilities, utility installations, roadways, and other related appurtenances or facilities, including those on adjacent uplands; a statement indicating whether use of a living shoreline as defined in § 28.2-104.1 for a shoreline management practice is not suitable, including reasons for the determination; a description of the type of equipment to be used and the means of equipment access to the activity site; the names and addresses of owners of record of adjacent land and known claimants of water rights in or adjacent to the wetland of whom the applicant has notice; an estimate of cost; the primary purpose of the project; any secondary purposes of the project, including further projects; the public benefit to be derived from the proposed project; a complete description of measures to be taken during and after the alteration to reduce detrimental offsite effects; the completion date of the proposed work, project, or structure; and such additional materials and documentation as the wetlands board may require.

C. A nonrefundable processing fee shall accompany each permit application. The fee shall be set by the applicable governing body with due regard for the services to be rendered, including the time, skill, and administrator's expense involved.

§ 5. All applications, maps, and documents submitted shall be open for public inspection at the office designated by the applicable governing body and specified in the public notice for public hearing required under § 6 of this ordinance.

§ 6. Not later than 60 days after receipt of a complete application, the wetlands board shall hold a public hearing on the application. The applicant, local governing body, Commissioner, owner of record of any land adjacent to the wetlands in question, known claimants of water rights in or adjacent to the wetlands in question, the Virginia Institute of Marine Science, the Department of Wildlife Resources, the State Water Control Board, the Department of Transportation, and any governmental agency expressing an interest in the application shall be notified of the hearing. The Commission or board shall mail or email these notices not less than 20 days prior to the date set for the hearing. The board shall also (i) cause notice of the hearing to be published at least once in the seven days prior to such hearing in a newspaper of general circulation in this _________ (county, city, or town); (ii) post a notice of the hearing on its website at least 14 days prior to such hearing; and (iii) provide a copy of such notice to the Commission for submittal to the Virginia Regulatory Town Hall. The published notice shall specify the place or places within this ________ (county, city, or town) where copies of the application may be examined. The costs of publication shall be paid by the applicant. In the event that the board submits a correct and timely notice for publication and the newspaper fails to publish the notice or publishes the notice incorrectly, the board shall be deemed to have met the notice requirements of this subsection so long as the notice is published in the next available edition of such newspaper.

§ 7. A. Approval of a permit application shall require the affirmative vote of three members of a five-member board or four members of a seven-member board.

B. The chairman of the board, or in his absence the acting chairman, may administer oaths and compel the attendance of witnesses. Any person may testify at the public hearing. Each witness at the hearing may submit a concise written statement of his testimony. The board shall make a record of the proceeding, which shall include the application, any written statements of witnesses, a summary of statements of all witnesses, the findings and decision of the board, and the rationale for the decision.

C. The board shall make its determination within 30 days of the hearing. If the board fails to act within that time, the application shall be deemed approved. Within 48 hours of its determination, the board shall notify the applicant and the Commissioner of its determination. If the board fails to make a determination within the 30-day period, it shall promptly notify the applicant and the Commission that the application is deemed approved. For purposes of this section, "act" means taking a vote on the application. If the application receives less than four affirmative votes from a seven-member board or less than three affirmative votes from a five-member board, the permit shall be denied.

D. If the board's decision is reviewed or appealed, the board shall transmit the record of its hearing to the Commissioner. Upon a final determination by the Commission, the record shall be returned to the board. The record shall be open for public inspection at the same office as was designated under § 5 of this ordinance.

§ 8. The board may require a reasonable bond or letter of credit in an amount and with surety and conditions satisfactory to it, securing to the Commonwealth compliance with the conditions and limitations set forth in the permit. The board may, after a hearing held pursuant to this ordinance, suspend or revoke a permit if the applicant has failed to comply with any of the conditions or limitations set forth in the permit or has exceeded the scope of the work described in the application. The board may, after a hearing, suspend a permit if the applicant fails to comply with the terms and conditions set forth in the application.

§ 9. In fulfilling its responsibilities under this ordinance, the board shall preserve and prevent the despoliation and destruction of wetlands within its jurisdiction while accommodating necessary economic development in a manner consistent with wetlands preservation and any standards set by the Commonwealth in addition to those identified in § 28.2-1308 to ensure protection of shorelines and sensitive coastal habitats from sea level rise and coastal hazards, including the provisions of guidelines and minimum standards promulgated by the Commission pursuant to § 28.2-1301 of the Code of Virginia.

§ 10. A. In deciding whether to grant, grant in modified form, or deny a permit, the board shall consider the following:

1. The testimony of any person in support of or in opposition to the permit application;

2. The impact of the proposed development on the public health, safety, and welfare; and

3. The proposed development's conformance with standards prescribed in § 28.2-1308 of the Code of Virginia and guidelines promulgated pursuant to § 28.2-1301 of the Code of Virginia.

B. The board shall grant the permit if all of the following criteria are met:

1. The anticipated public and private benefit of the proposed activity exceeds its anticipated public and private detriment.

2. The proposed development conforms with the standards prescribed in § 28.2-1308 of the Code of Virginia and guidelines promulgated pursuant to § 28.2-1301 of the Code of Virginia.

3. The proposed activity does not violate the purposes and intent of this ordinance or Chapter 13 (§ 28.2-1300 et seq.) of Title 28.2 of the Code of Virginia.

C. If the board finds that any of the criteria listed in subsection B of this section are not met, the board shall deny the permit application but allow the applicant to resubmit the application in modified form.

§ 11. The permit shall be in writing and signed by the chairman of the board or his authorized representative. A copy of the permit shall be transmitted to the Commissioner.

§ 12. No permit shall be granted without an expiration date established by the board. Upon proper application, the board may extend the permit expiration date.

§ 13. No permit granted by a wetlands board shall in any way affect the applicable zoning and land use ordinances of this ________ (county, city, or town) or the right of any person to seek compensation for any injury in fact incurred by him because of the proposed activity.

1972, c. 711, §§ 62.1-13.1, 62.1-13.5; 1973, cc. 382, 388; 1975, c. 268; 1979, c. 418; 1982, c. 300; 1985, c. 541; 1988, c. 587; 1989, c. 360; 1992, c. 836; 1994, c. 274; 2014, cc. 112, 143; 2020, cc. 809, 958; 2023, cc. 99, 195.

§ 28.2-1303. Appointment, terms, compensation, etc., of local wetlands boards; jurisdiction of county wetlands board over wetlands in town.

A. Every county, city, or town that enacts a wetlands zoning ordinance pursuant to this chapter shall create a wetlands board, consisting of five or seven residents of that jurisdiction appointed by the local governing body. All board members' terms shall be for five years, except that the term of at least one of the original appointments shall expire during each of the succeeding five years. The chairman of the board shall notify the local governing body at least 30 days prior to the expiration of any member's term and shall promptly notify the local governing body if any vacancy occurs. Vacancies shall be filled by the local governing body without delay upon receipt of such notice. Appointments to fill vacancies shall be for the unexpired portion of the term. Members may serve successive terms. A member whose term expires shall continue to serve until his successor is appointed and qualified. Members of the board shall hold no public office in the county or city other than membership on the local planning or zoning commission, the local erosion commission, the local board of zoning appeals, a board established by a local government to hear cases regarding ordinances adopted pursuant to the Chesapeake Bay Preservation Act and regulations promulgated thereunder, or as director of a soil and water conservation board. When members of these local commissions or boards are appointed to a local wetlands board, their terms of appointment shall be coterminous with their membership on those boards or commissions. The governing body shall also appoint at least one but not more than three alternate members to the board. The qualifications, terms, and compensation of alternate members shall be the same as those of members. Any member who knows that he will not be able to attend a board meeting shall notify the chairman at least 24 hours in advance of such meeting. The chairman shall select an alternate member to serve in place of the absent member at the board meeting, which shall be noted in the records of the board.

B. Upon a hearing with at least 15 days' notice thereof, any board member may be removed for malfeasance, misfeasance, or nonfeasance in office, or for other just cause, by the local governing body. Notwithstanding the foregoing provisions, a member of a local wetlands board may be removed from office by the local governing body without limitation in the event that the board member is absent from any three consecutive meetings of the board, or is absent from any four meetings of the board within any 12-month period. In either such event, a successor shall be appointed by the governing body for the unexpired portion of the term of the member who has been removed.

C. If a town does not enact a wetlands zoning ordinance within one year of its enactment by the surrounding county, application for permits to use and develop wetlands within the town shall be made to the county wetlands board.

D. Any county, city, or town that creates a local wetlands board pursuant to this section may compensate the members of the board in accordance with such terms and conditions as the locality may prescribe.

E. Notwithstanding any other provision of this section, the Town of Dumfries in Prince William County may enact a wetlands zoning ordinance pursuant to the provisions of this chapter.

1972, c. 711, §§ 62.1-13.6, 62.1-13.8; 1977, c. 15; 1978, c. 585; 1982, cc. 300, 446; 1983, c. 87; 1987, c. 62; 1992, c. 836; 2004, c. 277; 2005, c. 104; 2006, c. 687.

§ 28.2-1304. Officers, meetings, rules, etc., of wetlands boards; records and reports.

The board shall annually elect from its membership a chairman and such other officers as it deems necessary for terms of one year. For the conduct of any hearing and the taking of any action, a quorum shall be not less than three members of a five-member board nor less than four members of a seven-member board. The board may make, alter, and rescind rules and forms for its procedures, provided they are consistent with state law and local ordinances. The board shall keep a full public record of its proceedings and shall submit a report of its activities to the local governing body at least once each year. The board shall forward a copy of each report to the Commission.

1972, c. 711, § 62.1-13.7; 1977, c. 15; 1982, c. 446; 1992, c. 836.

§ 28.2-1305. Local governing body to supply meeting space and services for wetlands board.

Every county, city, or town creating a wetlands board shall supply the board with reasonable meeting space and necessary secretarial, clerical, legal, and consulting services. The local governing body is authorized to expend the public funds necessary to comply with the provisions of this section.

1972, c. 711, § 62.1-13.8; 1992, c. 836.

Article 3. Permits and Review.

§ 28.2-1306. Permits required for certain activities; issuance of permits by Commission.

A. It shall be unlawful for any person to conduct any activity which would require a permit under a wetlands zoning ordinance without such a permit. Until the county, city, or town in which a person proposes to conduct an activity which would require a permit under a wetlands zoning ordinance adopts the wetlands zoning ordinance, the person shall apply for a permit directly to the Commission, except as provided in subsection C of § 28.2-1303. If an applicant desires to use or develop wetlands owned by the Commonwealth, he shall apply for a permit directly to the Commission, and in addition to the application fee required by the wetlands zoning ordinance, he shall pay those fees and royalties assessed under § 28.2-1206.

B. Upon notification by any county, city, or town that it has adopted the wetlands zoning ordinance, the Commission shall immediately forward to that jurisdiction's wetlands board any pending permit application over which that board would have had jurisdiction if the ordinance had been in effect at the time the application was filed. However, if requested by the applicant, the application shall remain within the Commission's jurisdiction.

C. The Commission shall process permit applications in accordance with the provisions of the wetlands zoning ordinance and the Commissioner, or his authorized representative, shall sign such permit; however, the Commission may designate one or more hearing officers who may, in lieu of the Commission, conduct public hearings as required under § 28.2-1302, and thereafter report their findings and recommendations to the Commission.

1972, c. 711, §§ 62.1-13.5, 62.1-13.9; 1973, cc. 382, 388; 1975, c. 268; 1979, c. 418; 1982, c. 300; 1985, c. 541; 1988, c. 587; 1989, c. 360; 1992, c. 836; 1994, c. 125.

§ 28.2-1307. Expedited permits; administrative procedures.

A. The Commission may, in conjunction with local wetlands boards and other affected state and federal agencies, develop administrative procedures to expedite the processing of applications for permits required under this chapter. Whenever an application is received by the Commission for a permit over which a local board has jurisdiction under a wetlands zoning ordinance, the Commission shall forward a copy of the application to that board within seven days.

B. The Commission shall, in conjunction with local wetlands boards and other affected state and federal agencies, develop an expedited process for issuing general wetlands permits to be used by applicants during emergency situations in which a determination has been made that there is a threat to public or private property, or to the health and safety of the public. The development of the general wetlands permit shall be in accordance with subdivision A 8 of § 2.2-4006.

C. The Commission shall, in conjunction with local wetlands boards and other affected state and federal agencies, develop administrative procedures to expedite the processing of applications from agencies of the United States government, including any branch of the Armed Forces of the United States, for permits required under this chapter.

1982, c. 300, § 62.1-13.5:2; 1992, c. 836; 1997, c. 868; 2010, c. 65; 2023, c. 277.

§ 28.2-1308. Standards for use and development of wetlands; utilization of guidelines.

A. For the purposes of this section, "river watershed" means the Potomac River Basin, Shenandoah River Basin, James River Basin, Rappahannock River Basin, Roanoke and Yadkin Rivers Basin, Chowan River Basin (including the Dismal Swamp and Albemarle Sound), Tennessee River Basin, Big Sandy River Basin, Chesapeake Bay and its Small Coastal Basins, Atlantic Ocean, York River Basin, and the New River Basin.

B. The following standards shall apply to the use and development of wetlands and shall be considered in the determination of whether any permit required by this chapter should be granted or denied:

1. Wetlands of primary ecological significance shall not be altered so that the ecological systems in the wetlands are unreasonably disturbed; and

2. Development in Tidewater Virginia, to the maximum extent practical, shall be concentrated in wetlands of lesser ecological significance, in vegetated wetlands which have been irreversibly disturbed before July 1, 1972, in nonvegetated wetlands which have been irreversibly disturbed prior to January 1, 1983, and in areas of Tidewater Virginia outside of wetlands.

C. The provisions of guidelines and minimum standards promulgated by the Commission pursuant to § 28.2-1301 shall be considered in applying the standards listed in subsection B.

D. When any activity authorized by a permit issued pursuant to this chapter is conditioned upon compensatory mitigation for adverse impacts to wetlands, the applicant may be permitted to satisfy all or part of such mitigation requirements by the purchase or use of credits from any wetlands mitigation bank, including any banks owned by the permit applicant, that has been approved and is operating in accordance with applicable federal and state guidance, laws, or regulations for the establishment, use and operation of mitigation banks as long as (i) the bank is in the same fourth order subbasin, as defined by the hydrologic unit boundaries of the National Watershed Boundary Dataset or by the hydrologic unit system or dataset utilized and depicted or described in the bank's approved mitigation banking instrument, as the impacted site, or in an adjacent subbasin within the same river watershed, as the impacted site, or it meets all the conditions found in clauses (a) through (d) and either clause (e) or (f); (ii) the bank is ecologically preferable to practicable on-site and off-site individual mitigation options, as defined by federal wetland regulations; and (iii) the banking instrument, if approved after July 1, 1996, has been approved by a process that included public review and comment. When the bank is not located in the same subbasin or adjacent subbasin within the same river watershed as the impacted site, the purchase or use of credits shall not be allowed unless the applicant demonstrates to the satisfaction of the Commission that (a) the impacts will occur as a result of a Virginia Department of Transportation linear project or as the result of a locality project for a locality whose jurisdiction encompasses multiple river watersheds; (b) there is no practical same river watershed mitigation alternative; (c) the impacts are less than one acre in a single and complete project within a subbasin; (d) there is no significant harm to water quality or fish and wildlife resources within the river watershed of the impacted site; and either (e) impacts within the Chesapeake Bay watershed are mitigated within the Chesapeake Bay watershed as close as possible to the impacted site or (f) impacts within subbasins 02080108, 02080208, and 03010205, as defined by the National Watershed Boundary Dataset, are mitigated in-kind within those subbasins as close as possible to the impacted site. After July 1, 2002, the provisions of clause (f) shall apply only to impacts within subdivisions of the listed subbasins where overlapping watersheds exist, as determined by the Department of Environmental Quality, provided the Department has made such a determination by that date. For the purposes of this subsection, the hydrologic unit boundaries of the National Watershed Boundary Dataset or other hydrologic unit system may be adjusted by the Department of Environmental Quality to reflect site-specific geographic or hydrologic information provided by the bank sponsor.

E. Where an agreed-upon permit condition requires the contribution of in-lieu fees to offset permitted wetland losses, the wetlands board shall credit the applicant for any in-lieu fee payments made to the Virginia Aquatic Resources Trust Fund or another dedicated wetlands restoration fund with reference to the same activity.

F. Notwithstanding any provision of this section restricting the location of the source of credits, an applicant may be permitted to purchase or use credits from a tidal wetland mitigation bank located in an adjacent river watershed when such bank contains the same plant community type and salinity regime as the impacted wetlands, which shall be the preferred form of compensation. This subsection shall apply only (i) to tidal wetland mitigation banks with a polyhaline salinity regime located in subbasins 02080102, 02080107, 02080108, and 02080208 and (ii) when a tidal wetland mitigation bank with the same plant community type and salinity regime as the impacted wetlands is not available in the same river watershed as the impacted wetland.

1972, c. 711, § 62.1-13.3; 1982, c. 300; 1992, c. 836; 1996, c. 736; 1999, c. 8; 2011, c. 253; 2014, cc. 131, 332; 2020, c. 809; 2023, c. 245.

§ 28.2-1309. Emergency sand grading activities on nonvegetated wetlands located on the Atlantic Shoreline of Virginia Beach.

A. As used in this section, "emergency" means a sudden and unforeseeable occurrence or condition of such disastrous severity or magnitude that governmental action beyond that authorized by existing law is required because governmental inaction for the period required to amend the law to meet the exigency would cause immediate and irrevocable harm to the citizens or a portion of the citizenry of the Commonwealth.

B. Notwithstanding the provisions of § 28.2-1302, sand grading activities are permitted on nonvegetated wetlands located on the Atlantic Shoreline of the City of Virginia Beach if (i) such activities are otherwise permitted by law, and (ii) the city manager has declared an emergency and issued a permit for such purpose. Such activities may be conducted without advance notice and hearing; however, upon request and after reasonable notice as to time and place, the city manager shall hold a hearing to affirm, modify, amend, or cancel such emergency permit.

1992, c. 836; 2022, c. 235.

§ 28.2-1310. Commissioner to review all decisions of wetlands boards.

The Commissioner shall review all decisions of wetlands boards and request the Commission to review a decision only when he believes the board failed to fulfill its responsibilities under the wetlands zoning ordinance.

1972, c. 711, § 62.1-13.10; 1992, c. 836.

§ 28.2-1311. When Commission to review decision of wetlands board.

A. The Commission shall review a decision of a wetlands board when any of the following events occur:

1. An appeal is taken from the decision by the applicant or the county, city, or town where the wetlands are located.

2. The Commissioner requests the review. In order to make the request, the Commissioner shall notify the board, applicant, and the county, city, or town where the wetlands are located within ten days of receiving notice of the board's decision.

3. Twenty-five or more freeholders of property within the county, city, or town in which the proposed project is located sign and submit a petition to the Commission requesting the review. The petition shall indicate those specific instances where the petitioners allege that the board failed to fulfill its responsibilities under the wetlands zoning ordinance.

B. All requests for review or appeal shall be made within ten days of the date of the board's decision. The Commission shall hear and decide the review or appeal within forty-five days of receiving the request for review or notice of appeal. A continuance may be granted by the Commission on a motion of the applicant, the freeholders specified in subsection A of this section, or the county, city, or town where the wetlands are located.

1972, c. 711, § 62.1-13.11; 1992, c. 836.

§ 28.2-1312. Procedure for review; notice of decision.

A. The Commissioner shall cause notice of the review or appeal to be given to the board, the applicant, the county, city, or town where the wetlands are located, and where applicable, to the freeholders specified in § 28.2-1311.

B. The Commission shall hear the appeal or conduct the review of the record transmitted by the board to the Commissioner. The Commission may take such additional evidence as may be necessary to resolve any controversy as to the correctness of the record. The Commission, in its discretion, may also receive such other evidence as the ends of justice require.

C. The Commission shall notify the parties of its decision within forty-eight hours of the appeal or review hearing.

1972, c. 711, §§ 62.1-13.12, 62.1-13.14; 1992, c. 836.

§ 28.2-1313. When Commission to modify, remand, or reverse decision of wetlands board.

The Commission shall modify, remand, or reverse the decision of the wetlands board if:

1. The wetlands board, in reaching its decision, failed to fulfill its responsibilities under the wetlands zoning ordinance; or

2. The substantial rights of the appellant or the applicant have been prejudiced because the findings, conclusions, or decisions of the board are:

a. In violation of constitutional provisions;

b. In excess of statutory authority or jurisdiction of the wetlands board;

c. Made upon unlawful procedure;

d. Affected by other error of law;

e. Unsupported by the evidence on the record considered as a whole; or

f. Arbitrary, capricious, or an abuse of discretion.

1972, c. 711, § 62.1-13.13; 1975, c. 467; 1992, c. 836.

§ 28.2-1314. Time for issuance of permit.

No permit shall be issued until the period within which a request for review or an appeal to the Commission may be made has expired. If a request for review is made or an appeal is noted, no activity for which the permit is required shall be commenced until the Commission has notified the parties of its determination.

1973, c. 65, § 62.1-13.14:1; 1992, c. 836.

§ 28.2-1315. Judicial review.

An appeal from any Commission decision granting or denying a permit or from any Commission decision on the review of or appeal from a board decision may be taken by the applicant, any of the freeholders specified in subsection A of § 28.2-1311, or the county, city, or town where the wetlands are located. Judicial review shall be pursuant to the provisions of the Administrative Process Act (§ 2.2-4000 et seq.).

1972, c. 711, § 62.1-13.15; 1982, c. 300; 1986, c. 615; 1992, c. 836.

Article 4. Enforcement and Penalties.

§ 28.2-1316. Investigations and prosecutions.

The Commission may investigate all projects, whether proposed or ongoing, which alter wetlands. The Commission may prosecute all violations of any order, rule, or regulation of the Commission or of a wetlands board, or violation of any provision of this chapter. Wetlands boards may investigate all projects, whether proposed or ongoing, which alter wetlands located within their jurisdiction. Wetlands boards may prosecute all violations of their orders and any violation of the wetlands zoning ordinance under which they were established.

1972, c. 711, § 62.1-13.16; 1975, c. 467; 1992, c. 836.

§ 28.2-1317. Monitoring, inspections, compliance, and restoration.

A. The Commissioner or board chairman may require a permittee to implement monitoring and reporting procedures they believe are reasonably necessary to ensure compliance with the provisions of the permit and this chapter.

B. The Commissioner or board chairman may require such on-site inspections as he believes are reasonably necessary to determine whether the measures required by the permit are being properly performed, or whether the provisions of this chapter are being violated. Prior to conducting any inspection, the Commissioner or board chairman shall provide notice to the resident owner, occupier, or operator, who shall be given an opportunity to accompany the site inspector. If it is determined that there is a failure to comply with the permit, the Commissioner or board chairman shall serve notice upon the permittee at the address specified in his permit application or by delivery at the site of the permitted activities to the person supervising those activities and designated in the permit to receive the notice. The notice shall describe the measures needed for compliance and the time within which these measures shall be completed. Failure of the person to comply within the specified period is a violation of this section.

C. Upon receipt of a sworn complaint of a substantial violation of this chapter from the designated enforcement officer, the Commissioner or board chairman may, in conjunction with or subsequent to a notice to comply as specified in subsection B of this section, issue an order requiring all or part of the activities on the site to be stopped until the specified corrective measures have been taken. In the case of an activity not authorized under this chapter or where the alleged permit noncompliance is causing, or is in imminent danger of causing, significant harm to the wetlands protected by this chapter, the order may be issued without regard to whether the person has been issued a notice to comply pursuant to subsection B of this section. Otherwise, the order may be issued only after the permittee has failed to comply with the notice to comply. The order shall be served in the same manner as a notice to comply, and shall remain in effect for a period of seven days from the date of service pending application by the enforcing authority, permittee, resident owner, occupier, or operator for appropriate relief to the circuit court of the jurisdiction where the violation was alleged to have occurred. Upon completion of corrective action, the order shall immediately be lifted. Nothing in this section shall prevent the Commissioner or board chairman from taking any other action specified in § 28.2-1316.

D. Upon receipt of a sworn complaint of a substantial violation of this chapter from a designated enforcement officer, the Commission or a wetlands board may order that the affected site be restored to predevelopment conditions if the Commission or board finds that restoration is necessary to recover lost resources or to prevent further damage to resources. The order shall specify the restoration necessary and establish a reasonable time for its completion. The order shall be issued only after a hearing with at least thirty days' notice to the affected person of the hearing's time, place, and purpose, and shall become effective immediately upon issuance by the Commission or board. The Commission or board shall require any scientific monitoring plan they believe necessary to ensure the successful reestablishment of wetlands protected by this chapter and may require that a prepaid contract acceptable to the Commission or board be in effect for the purpose of carrying out the scientific monitoring plan. The Commission or board may also require a reasonable bond or letter of credit in an amount and with surety and conditions satisfactory to it securing to the Commonwealth compliance with the conditions set forth in the restoration order. The appropriate court, upon petition by the Commission or board, may enforce any such restoration order by injunction, mandamus, or other appropriate remedy. Failure to complete the required restoration is a violation of this chapter.

E. The duties of the Commissioner or the board chairman under this section may be delegated to their respective designees; however, these designees shall not be designated enforcement officers.

1987, c. 436, § 62.1-13.16:1; 1990, c. 811; 1992, c. 836.

§ 28.2-1318. Violations; penalty.

Any person who knowingly, intentionally, or negligently violates any order, rule, or regulation of the Commission or of a wetlands board established pursuant to this chapter, any provision of this chapter or of a wetlands zoning ordinance enacted pursuant to this chapter, or any provision of a permit granted pursuant to this chapter is guilty of a Class 1 misdemeanor. Following a conviction, every day the violation continues is a separate offense.

1972, c. 711, § 62.1-13.18; 1992, c. 836.

§ 28.2-1319. Injunctions.

Upon the petition of the Commission or a wetlands board to the circuit court of the county or city where any act is done or threatened which is unlawful under this chapter, the court may enjoin the unlawful act and order the defendant to take any steps necessary to restore, protect, and preserve the wetlands involved. This remedy shall be exclusive of and in addition to any criminal penalty which may be imposed under § 28.2-1318.

1973, c. 65, § 62.1-13.18:1; 1992, c. 836.

§ 28.2-1320. Penalties.

A. Without limiting the remedies which may be obtained under this chapter, any person who violates any provision of this chapter or who violates or fails, neglects, or refuses to obey any Commission or wetlands board notice, order, rule, regulation, or permit condition authorized by this chapter shall, upon such finding by an appropriate circuit court, be assessed a civil penalty not to exceed $25,000 for each day of violation. Such civil penalties may, at the discretion of the court assessing them, be directed to be paid into the treasury of the county, city, or town in which the violation occurred for the purpose of abating environmental damage to or restoring wetlands therein, in such a manner as the court may, by order, direct, except that where the violator is the county, city, or town itself, or its agent, the court shall direct the penalty to be paid into the state treasury.

B. Without limiting the remedies which may be obtained under this chapter, and with the consent of any person who has violated any provision of this chapter or who has violated or failed, neglected, or refused to obey any Commission or wetlands board order, rule, regulation, or permit condition authorized by this chapter, the Commission or wetlands board may provide, in an order issued by the Commission or wetlands board against such person, for the one-time payment of civil charges for each violation in specific sums, not to exceed $10,000 for each violation. Civil charges shall be in lieu of any appropriate civil penalty which could be imposed under subsection A of this section. Civil charges may be in addition to the cost of any restoration ordered by the Commission or a wetlands board.

1990, c. 811, § 62.1-13.18:2; 1992, c. 836.