Title 62.1. Waters of the State, Ports and Harbors
Chapter 3.1. State Water Control Law
Article 2.4. Erosion and Sediment Control Law for Localities Not Administering a Virginia Erosion and Stormwater Management Program.
§ 62.1-44.15:51. Definitions.As used in this article, unless the context requires a different meaning:
"Agreement in lieu of a plan" means a contract between the VESCP authority and the owner that specifies conservation measures that must be implemented in the construction of a (i) single-family detached residential structure or (ii) farm building or structure on a parcel of land with a total impervious cover percentage, including the impervious cover from the farm building or structure to be constructed, of less than five percent; this contract may be executed by the VESCP authority in lieu of a formal site plan.
"Applicant" means any person submitting an erosion and sediment control plan for approval in order to obtain authorization for land-disturbing activities to commence.
"Certified inspector" means an employee or agent of a VESCP authority who (i) holds a certification from the Board in the area of project inspection or (ii) is enrolled in the Board's training program for project inspection and successfully completes such program within one year after enrollment.
"Certified plan reviewer" means an employee or agent of a VESCP authority who (i) holds a certification from the Board in the area of plan review, (ii) is enrolled in the Board's training program for plan review and successfully completes such program within one year after enrollment, or (iii) is licensed as a professional engineer, architect, landscape architect, land surveyor pursuant to Article 1 (§ 54.1-400 et seq.) of Chapter 4 of Title 54.1, or professional soil scientist as defined in § 54.1-2200.
"Certified program administrator" means an employee or agent of a VESCP authority who (i) holds a certification from the Board in the area of program administration or (ii) is enrolled in the Board's training program for program administration and successfully completes such program within one year after enrollment.
"Department" means the Department of Environmental Quality.
"Director" means the Director of the Department of Environmental Quality.
"District" or "soil and water conservation district" means a political subdivision of the Commonwealth organized in accordance with the provisions of Article 3 (§ 10.1-506 et seq.) of Chapter 5 of Title 10.1.
"Erosion and sediment control plan" or "plan" means a document containing material for the conservation of soil and water resources of a unit or group of units of land. It may include appropriate maps, an appropriate soil and water plan inventory and management information with needed interpretations, and a record of decisions contributing to conservation treatment. The plan shall contain all major conservation decisions to ensure that the entire unit or units of land will be so treated to achieve the conservation objectives.
"Erosion impact area" means an area of land that is not associated with a current land-disturbing activity but is subject to persistent soil erosion resulting in the delivery of sediment onto neighboring properties or into state waters. This definition shall not apply to any lot or parcel of land of 10,000 square feet or less used for residential purposes or to shorelines where the erosion results from wave action or other coastal processes.
"Farm building or structure" means the same as that term is defined in § 36-97 and also includes any building or structure used for agritourism activity, as defined in § 3.2-6400, and any related impervious surfaces including roads, driveways, and parking areas.
"Land disturbance" or "land-disturbing activity" means any man-made change to the land surface that may result in soil erosion or has the potential to change its runoff characteristics, including the clearing, grading, excavating, transporting, and filling of land.
"Natural channel design concepts" means the utilization of engineering analysis and fluvial geomorphic processes to create, rehabilitate, restore, or stabilize an open conveyance system for the purpose of creating or recreating a stream that conveys its bankfull storm event within its banks and allows larger flows to access its bankfull bench and its floodplain.
"Owner" means the same as provided in § 62.1-44.3. For a land-disturbing activity that is regulated under this article, "owner" also includes the owner or owners of the freehold of the premises or lesser estate therein, mortgagee or vendee in possession, assignee of rents, receiver, executor, trustee, lessee, or other person, firm, or corporation in control of a property.
"Peak flow rate" means the maximum instantaneous flow from a given storm condition at a particular location.
"Person" means any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, county, city, town, or other political subdivision of the Commonwealth, governmental body, including a federal or state entity as applicable, any interstate body, or any other legal entity.
"Runoff volume" means the volume of water that runs off the land development project from a prescribed storm event.
"Soil erosion" means the movement of soil by wind or water into state waters or onto lands in the Commonwealth.
"Town" means an incorporated town.
"Virginia Erosion and Sediment Control Program" or "VESCP" means a program approved by the Board that has been established by a VESCP authority for the effective control of soil erosion, sediment deposition, and nonagricultural runoff associated with a land-disturbing activity to prevent the unreasonable degradation of properties, stream channels, waters, and other natural resources and shall include such items where applicable as local ordinances, rules, policies and guidelines, technical materials, and requirements for plan review, inspection, and evaluation consistent with the requirements of this article.
"Virginia Erosion and Sediment Control Program authority" or "VESCP authority" means a locality approved by the Board to operate a Virginia Erosion and Sediment Control Program. A locality that has chosen not to establish a Virginia Erosion and Stormwater Management Program pursuant to subdivision B 3 of § 62.1-44.15:27 is required to become a VESCP authority in accordance with this article.
"Virginia Stormwater Management Program" or "VSMP" means a program established by the Board pursuant to § 62.1-44.15:27.1 on behalf of a locality on or after July 1, 2014, to manage the quality and quantity of runoff resulting from any land-disturbing activity that (i) disturbs one acre or more of land or (ii) disturbs less than one acre of land and is part of a larger common plan of development or sale that results in one acre or greater of land disturbance.
1973, c. 486, § 21-89.3; 1974, c. 265; 1977, c. 149; 1980, c. 305; 1988, cc. 690, 732, 891, § 10.1-560; 1990, c. 491; 1991, c. 469; 1992, c. 184; 1993, c. 925; 1994, c. 703; 2003, c. 423; 2004, c. 476; 2005, c. 107; 2006, c. 21; 2009, c. 309; 2012, cc. 785, 819; 2013, cc. 756, 793; 2016, cc. 68, 758; 2023, cc. 48, 49.
§ 62.1-44.15:51.1. Applicability.The requirements of this article shall apply in any locality that has chosen not to establish a Virginia Erosion and Stormwater Management Program (VESMP) pursuant to subdivision B 3 of § 62.1-44.15:27. Each such locality shall be required to adopt and administer a Board-approved VESCP.
§ 62.1-44.15:52. Virginia Erosion and Sediment Control Program.A. The Board shall develop a program and adopt regulations in accordance with the Administrative Process Act (§ 2.2-4000 et seq.) for the effective control of soil erosion, sediment deposition, and nonagricultural runoff that shall be met in any control program to prevent the unreasonable degradation of properties, stream channels, waters, and other natural resources. Stream restoration and relocation projects that incorporate natural channel design concepts are not man-made channels and shall be exempt from any flow rate capacity and velocity requirements for natural or man-made channels as defined in any regulations promulgated pursuant to this section or § 62.1-44.15:54 or 62.1-44.15:65. Any plan approved prior to July 1, 2014, that provides for stormwater management that addresses any flow rate capacity and velocity requirements for natural or man-made channels shall satisfy the flow rate capacity and velocity requirements for natural or man-made channels if the practices are designed to (i) detain the water volume equal to the first one-half inch of runoff multiplied by the impervious surface of the land development project and to release it over 48 hours; (ii) detain and release over a 24-hour period the expected rainfall resulting from the one-year, 24-hour storm; and (iii) reduce the allowable peak flow rate resulting from the 1.5-year, two-year, and 10-year, 24-hour storms to a level that is less than or equal to the peak flow rate from the site assuming it was in a good forested condition, achieved through multiplication of the forested peak flow rate by a reduction factor that is equal to the runoff volume from the site when it was in a good forested condition divided by the runoff volume from the site in its proposed condition, and shall be exempt from any flow rate capacity and velocity requirement for natural or man-made channels as defined in regulations promulgated pursuant to § 62.1-44.15:54 or 62.1-44.15:65. For plans approved on and after July 1, 2014, the flow rate capacity and velocity requirements of this subsection shall be satisfied by compliance with water quantity requirements in the Virginia Erosion and Stormwater Management Act (§ 62.1-44.15:24 et seq.) and attendant regulations unless such land-disturbing activities (a) are in accordance with the grandfathering or time limits on applicability of approved design criteria provisions of the Virginia Erosion and Stormwater Management Program (VESMP) Regulations, in which case the flow rate capacity and velocity requirements of this subsection shall apply, or (b) are exempt pursuant to subdivision G 2 of § 62.1-44.15:34.
The regulations shall:
1. Be based upon relevant physical and developmental information concerning the watersheds and drainage basins of the Commonwealth, including, but not limited to, data relating to land use, soils, hydrology, geology, size of land area being disturbed, proximate water bodies and their characteristics, transportation, and public facilities and services;
2. Include such survey of lands and waters as may be deemed appropriate by the Board or required by any applicable law to identify areas, including multijurisdictional and watershed areas, with critical erosion and sediment problems; and
3. Contain conservation standards for various types of soils and land uses, which shall include criteria, techniques, and methods for the control of erosion and sediment resulting from land-disturbing activities.
B. The Board shall provide technical assistance and advice to, and conduct and supervise educational programs for VESCP authorities.
C. The Board shall adopt regulations establishing minimum standards of effectiveness of erosion and sediment control programs, and criteria and procedures for reviewing and evaluating the effectiveness of VESCPs. In developing minimum standards for program effectiveness, the Board shall consider information and standards on which the regulations promulgated pursuant to subsection A are based.
D. The Board shall approve VESCP authorities and shall periodically conduct a comprehensive program compliance review and evaluation pursuant to subdivision (19) of § 62.1-44.15.
E. The Board shall issue certifications concerning the content, application, and intent of specified subject areas of this article and accompanying regulations, including program administration, plan review, and project inspection, to personnel of program authorities and to any other persons who have completed training programs or in other ways demonstrated adequate knowledge. The Department shall administer education and training programs for specified subject areas of this article and accompanying regulations, and is authorized to charge persons attending such programs reasonable fees to cover the costs of administering the programs. Such education and training programs shall also contain expanded components to address plan review and project inspection elements of the Virginia Erosion and Stormwater Management Act (§ 62.1-44.15:24 et seq.) in accordance with § 62.1-44.15:30.
F. Department personnel conducting inspections pursuant to this article shall hold a certification as provided in subsection E.
1973, c. 486, § 21-89.4; 1988, cc. 732, 891, § 10.1-561; 1993, c. 925; 2004, c. 431; 2005, c. 107; 2006, c. 21; 2012, cc. 785, 819; 2013, cc. 756, 793; 2015, c. 497; 2016, cc. 66, 68, 758.
§ 62.1-44.15:53. Certification of program personnel.A. The minimum standards of VESCP effectiveness established by the Board pursuant to subsection C of § 62.1-44.15:52 shall provide that (i) an erosion and sediment control plan shall not be approved until it is reviewed by a certified plan reviewer; (ii) inspections of land-disturbing activities shall be conducted by a certified inspector; and (iii) a VESCP shall contain a certified program administrator, a certified plan reviewer, and a certified project inspector, who may be the same person.
B. Any person who holds a certificate of competence from the Board in the area of plan review, project inspection, or program administration that was attained prior to the adoption of the mandatory certification provisions of subsection A shall be deemed to satisfy the requirements of that area of certification.
C. Professionals registered in the Commonwealth pursuant to Article 1 (§ 54.1-400 et seq.) of Chapter 4 of Title 54.1 or a professional soil scientist as defined in § 54.1-2200 shall be deemed to have met the provisions of this section for the purposes of renewals of certifications.
1993, c. 925, § 10.1-561.1; 2012, cc. 785, 819; 2013, cc. 756, 793; 2016, cc. 68, 758.
§ 62.1-44.15:54. Virginia Erosion and Sediment Control Program.A. Any locality that has chosen not to establish a Virginia Erosion and Stormwater Management Program (VESMP) pursuant to subdivision B 3 of § 62.1-44.15:27 shall administer a VESCP in accordance with this article; however, a town may enter into an agreement with a county to administer the town's VESCP pursuant to subsection C of § 62.1-44.15:27.
B. A VESCP authority may enter into agreements or contracts with soil and water conservation districts, adjacent localities, or other public or private entities to assist with carrying out the provisions of this article, including the review and determination of adequacy of erosion and sediment control plans submitted for land-disturbing activities on a unit or units of land as well as for monitoring, reports, inspections, and enforcement of such land-disturbing activities.
C. Any VESCP adopted by a county, city, or town shall be approved by the Board if it establishes by ordinance requirements that are consistent with this article and associated regulations.
D. Each approved VESCP operated by a county, city, or town shall include provisions for the coordination of the VESCP with flood insurance, flood plain management, and other programs requiring compliance prior to authorizing a land-disturbing activity in order to make the submission and approval of plans, payment of fees, and coordination of inspection and enforcement activities more convenient and efficient both for the local governments and those responsible for compliance with the programs.
E. The Board shall conduct compliance reviews of VESCPs in accordance with subdivision (19) of § 62.1-44.15. The Board or Department also may require any locality that is a VESCP authority to furnish when requested any information as may be required to accomplish the purposes of this article.
F. Any VESCP authority that administers an erosion and sediment control program may charge applicants a reasonable fee to defray the cost of program administration. A VESCP authority shall hold a public hearing prior to establishing a schedule of fees. The fee shall not exceed an amount commensurate with the services rendered, taking into consideration the time, skill, and the VESCP authority's expense involved.
G. Any locality that is authorized to administer a VESCP may adopt an ordinance or regulation where applicable providing that violations of any regulation or order of the Board, any provision of its program, any condition of a land-disturbance approval, or any provision of this article shall be subject to a civil penalty. The civil penalty for any one violation shall be not less than $100 nor more than $1,000. Each day during which the violation is found to have existed shall constitute a separate offense. In no event shall a series of specified violations arising from the same operative set of facts result in civil penalties that exceed a total of $10,000, except that a series of violations arising from the commencement of land-disturbing activities without an approved plan for any site shall not result in civil penalties that exceed a total of $10,000. The penalties set out in this subsection are also available to the Board in its enforcement actions.
1973, c. 486, § 21-89.5; 1976, c. 653; 1978, c. 450; 1980, c. 35; 1983, c. 189; 1988, cc. 732, 891, § 10.1-562; 1992, c. 298; 1993, c. 925; 2005, c. 129; 2007, cc. 51, 204; 2010, c. 275; 2012, cc. 785, 819; 2013, cc. 756, 793; 2016, cc. 68, 758.
§ 62.1-44.15:55. Regulated land-disturbing activities; submission and approval of erosion and sediment control plan.A. Except as provided in § 62.1-44.15:31 for a land-disturbing activity conducted by a state agency, federal entity, or other specified entity, no person shall engage in any land-disturbing activity until (i) he has submitted to the VESCP authority an erosion and sediment control plan for the land-disturbing activity and the plan has been reviewed and approved and (ii) where Virginia Pollutant Discharge Elimination System permit coverage is required, the VESCP authority has obtained evidence of such permit coverage from the Department's online reporting system prior to issuing its land-disturbance approval. A VESCP authority may enter into an agreement with an adjacent VESCP or VESMP authority regarding the administration of multijurisdictional projects specifying who shall be responsible for all or part of the administrative procedures. Should adjacent authorities fail to come to such an agreement, each shall be responsible for administering the area of the multijurisdictional project that lies within its jurisdiction. Where the land-disturbing activity results from the construction of a (a) single-family residence or (b) farm building or structure on a parcel of land with a total impervious cover percentage, including the impervious cover from the farm building or structure to be constructed, of less than five percent, an agreement in lieu of a plan may be substituted for an erosion and sediment control plan if executed by the VESCP authority.
B. The VESCP authority shall review erosion and sediment control plans submitted to it and grant written approval within 60 days of the receipt of the plan if it determines that the plan meets the requirements of this article and the Board's regulations and if the person responsible for carrying out the plan certifies that he will properly perform the erosion and sediment control measures included in the plan and shall comply with the provisions of this article. In addition, as a prerequisite to engaging in the land-disturbing activities shown on the approved plan, the person responsible for carrying out the plan shall provide the name of an individual holding a certificate to the VESCP authority, as provided by § 62.1-44.15:52, who will be in charge of and responsible for carrying out the land-disturbing activity. However, any VESCP authority may waive the certificate requirement for an agreement in lieu of a plan. If a violation occurs during the land-disturbing activity, then the person responsible for carrying out the agreement in lieu of a plan shall correct the violation and provide the name of an individual holding a certificate, as provided by § 62.1-44.15:52. Failure to provide the name of an individual holding a certificate prior to engaging in land-disturbing activities may result in revocation of the approval of the plan and the person responsible for carrying out the plan shall be subject to the penalties provided in this article.
When a plan is determined to be inadequate, written notice of disapproval stating the specific reasons for disapproval shall be communicated to the applicant within 45 days. The notice shall specify the modifications, terms, and conditions that will permit approval of the plan. If no action is taken by the VESCP authority within the time specified in this subsection, the plan shall be deemed approved and the person authorized to proceed with the proposed activity. The VESCP authority shall act on any erosion and sediment control plan that has been previously disapproved within 45 days after the plan has been revised, resubmitted for approval, and deemed adequate.
C. The VESCP authority may require changes to an approved plan in the following cases:
1. Where inspection has revealed that the plan is inadequate to satisfy applicable regulations; or
2. Where the person responsible for carrying out the approved plan finds that because of changed circumstances or for other reasons the approved plan cannot be effectively carried out, and proposed amendments to the plan, consistent with the requirements of this article and associated regulations, are agreed to by the VESCP authority and the person responsible for carrying out the plan.
D. In order to prevent further erosion, a VESCP authority may require approval of an erosion and sediment control plan for any land identified by the VESCP authority as an erosion impact area.
E. For the purposes of subsections A and B, when land-disturbing activity will be required of a contractor performing construction work pursuant to a construction contract, the preparation, submission, and approval of an erosion and sediment control plan shall be the responsibility of the owner.
F. Notwithstanding any other provisions of this article, the following activities are not required to comply with the requirements of this article unless otherwise required by federal law:
1. Disturbance of a land area of less than 10,000 square feet in size or less than 2,500 square feet in an area designated as a Chesapeake Bay Preservation Area pursuant to the Chesapeake Bay Preservation Act (§ 62.1-44.15:67 et seq.). However, the governing body of the program authority may reduce this exception to a smaller area of disturbed land or qualify the conditions under which this exception shall apply;
2. Minor land-disturbing activities such as home gardens and individual home landscaping, repairs, and maintenance work;
3. Installation, maintenance, or repair of any individual service connection;
4. Installation, maintenance, or repair of any underground utility line when such activity occurs on an existing hard surfaced road, street, or sidewalk, provided the land-disturbing activity is confined to the area of the road, street, or sidewalk that is hard surfaced;
5. Installation, maintenance, or repair of any septic tank line or drainage field unless included in an overall plan for land-disturbing activity relating to construction of the building to be served by the septic tank system;
6. Permitted surface or deep mining operations and projects, or oil and gas operations and projects conducted pursuant to Title 45.2;
7. Clearing of lands specifically for bona fide agricultural purposes; the management, tilling, planting, or harvesting of agricultural, horticultural, or forest crops; livestock feedlot operations; agricultural engineering operations, including construction of terraces, terrace outlets, check dams, desilting basins, dikes, ponds, ditches, strip cropping, lister furrowing, contour cultivating, contour furrowing, land drainage, and land irrigation; or as additionally set forth by the Board in regulations. However, this exception shall not apply to harvesting of forest crops unless the area on which harvesting occurs is reforested artificially or naturally in accordance with the provisions of Chapter 11 (§ 10.1-1100 et seq.) of Title 10.1 or is converted to bona fide agricultural or improved pasture use as described in subsection B of § 10.1-1163;
8. Installation of fence and sign posts or telephone and electric poles and other kinds of posts or poles;
9. Shoreline erosion control projects on tidal waters when all of the land-disturbing activities are within the regulatory authority of and approved by local wetlands boards, the Marine Resources Commission, or the United States Army Corps of Engineers; however, any associated land that is disturbed outside of this exempted area shall remain subject to this article and the regulations adopted pursuant thereto;
10. Land-disturbing activities in response to a public emergency where the related work requires immediate authorization to avoid imminent endangerment to human health or the environment. In such situations, the VESMP authority shall be advised of the disturbance within seven days of commencing the land-disturbing activity, and compliance with the administrative requirements of subsection A is required within 30 days of commencing the land-disturbing activity;
11. Discharges to a sanitary sewer or a combined sewer system that are not from a land-disturbing activity; and
12. Repair or rebuilding of the tracks, rights-of-way, bridges, communication facilities, and other related structures and facilities of a railroad company.
1973, c. 486, § 21-89.6; 1979, c. 432; 1988, cc. 732, 891, § 10.1-563; 1993, c. 925; 1999, c. 555; 2001, c. 490; 2003, cc. 827, 966; 2006, c. 466; 2008, c. 23; 2011, cc. 720, 721; 2012, cc. 785, 819; 2013, cc. 756, 793; 2016, cc. 68, 758; 2023, cc. 48, 49; 2024, cc. 5, 104.
§ 62.1-44.15:55.1. Department review of erosion and sediment control plans for solar projects.A. Any locality that does not operate a regulated MS4 and for which the Department did not administer a VSMP as of July 1, 2020, shall notify the Department if it decides to have the Department provide the locality with (i) review of the erosion and sediment control plan required by subsection A of § 62.1-44.15:55 and (ii) a recommendation on the plan's compliance with the requirements of this article and the Board's regulations, for any solar project and its associated infrastructure with a rated electrical generation capacity exceeding five megawatts.
B. The VESCP authority for a locality that notifies the Department pursuant to subsection A shall, within five days of receiving an erosion and sediment control plan, forward such plan to the Department for review. If a plan forwarded to the Department is incomplete, the Department shall return the plan to the VESCP authority immediately and the application process shall start over. If a plan forwarded to the Department is complete, the Department shall review it for compliance with the requirements of this article and the Board's regulations and provide a recommendation to the VESCP authority. The VESCP authority shall then (i) grant written approval of the plan or (ii) provide written notice of disapproval of the plan in accordance with subsection B of § 62.1-44.15:55.
C. The VESCP authority for a locality that notifies the Department pursuant to subsection A shall, within five days of receiving any resubmittal of a previously disapproved erosion and sediment control plan, forward such resubmitted plan to the Department. The Department shall review a resubmittal of a previously disapproved erosion and sediment control plan for compliance with the requirements of this article and the Board's regulations and provide a recommendation to the VESCP authority. The VESCP authority shall then (i) grant written approval of the plan or (ii) provide written notice of disapproval of the plan in accordance with subsection B of § 62.1-44.15:55.
D. The Department shall adopt a fee schedule and charge fees for conducting reviews pursuant to this section. The fees shall be charged to applicants and not to any VESCP authority. Such fees shall be remitted to the State Treasurer for deposit in the Fund established by subsection E. The amount of the fees shall be set at an amount representing no less than 60 percent, but not to exceed 62 percent, of the administrative and other costs to the Department of conducting such reviews.
E. There is hereby created in the state treasury a special nonreverting fund to be known as the Virginia Erosion and Sediment Control Fund, referred to in this section as "the Fund." The Fund shall be established on the books of the Comptroller. All moneys collected by the Department pursuant to this section and all other funds appropriated for such purpose and any gifts, donations, grants, bequests, and other funds received on its behalf shall be paid into the state treasury and credited to the Fund. Interest earned on moneys in the Fund shall remain in the Fund and be credited to it. Any moneys remaining in the Fund, including interest thereon, at the end of each fiscal year shall not revert to the general fund but shall remain in the Fund. Moneys in the Fund shall be used solely for the purposes of carrying out the Department's responsibilities pursuant to this section. Expenditures and disbursements from the Fund shall be made by the State Treasurer on warrants issued by the Comptroller upon written request signed by the Director.
An accounting of moneys received by and distributed from the Fund shall be kept by the State Comptroller.
2021, Sp. Sess. I, c. 497.
§ 62.1-44.15:56. Repealed.Repealed by Acts 2016, cc. 68 and 758, cl. 2, effective July 1, 2024.
§ 62.1-44.15:56.1. Department acceptance of plans in lieu of plan review.A. Notwithstanding any other provision of this article, the Department, when administering a VESCP pursuant to Article 2.4 (§ 62.1-44.15:51 et seq.), may choose to accept a set of plans and supporting calculations for any land-disturbing activity determined to be de minimis using a risk-based approach established by the Board.
B. The Department is authorized to accept such plans and supporting calculations in satisfaction of the requirement of this article that it retain a certified plan reviewer or conduct a plan review. This section shall not excuse any applicable performance bond requirement pursuant to § 62.1-44.15:57.
2020, c. 812.
§ 62.1-44.15:57. Approved plan required for issuance of grading, building, or other permits; security for performance.Agencies authorized under any other law to issue grading, building, or other permits for activities involving land-disturbing activities regulated under this article shall not issue any such permit unless the applicant submits with his application an approved erosion and sediment control plan, certification that the plan will be followed, and evidence of Virginia Pollutant Discharge Elimination System permit coverage where it is required. Prior to issuance of any permit, the agency may also require an applicant to submit a reasonable performance bond with surety, cash escrow, letter of credit, any combination thereof, or such other legal arrangement acceptable to the agency, to ensure that measures could be taken by the agency at the applicant's expense should he fail, after proper notice, within the time specified to initiate or maintain appropriate conservation action that may be required of him by the approved plan as a result of his land-disturbing activity. The amount of the bond or other security for performance shall not exceed the total of the estimated cost to initiate and maintain appropriate conservation action based on unit price for new public or private sector construction in the locality and a reasonable allowance for estimated administrative costs and inflation, which shall not exceed 25 percent of the estimated cost of the conservation action. If the agency takes such conservation action upon such failure by the permittee, the agency may collect from the permittee the difference should the amount of the reasonable cost of such action exceed the amount of the security held. Within 60 days of the achievement of adequate stabilization of the land-disturbing activity in any project or section thereof, the bond, cash escrow, letter of credit, or other legal arrangement, or the unexpended or unobligated portion thereof, shall be refunded to the applicant or terminated based upon the percentage of stabilization accomplished in the project or section thereof. These requirements are in addition to all other provisions of law relating to the issuance of such permits and are not intended to otherwise affect the requirements for such permits.
1973, c. 486, § 21-89.7; 1980, c. 35; 1988, cc. 694, 891, § 10.1-565; 1996, c. 275; 2012, cc. 785, 819; 2013, cc. 756, 793; 2016, cc. 68, 758.
§ 62.1-44.15:58. Monitoring, reports, and inspections.A. The VESCP authority (i) shall provide for periodic inspections of the land-disturbing activity and require that an individual holding a certificate, as provided by § 62.1-44.15:52, will be in charge of and responsible for carrying out the land-disturbing activity and (ii) may require monitoring and reports from the person responsible for carrying out the erosion and sediment control plan, to ensure compliance with the approved plan and to determine whether the measures required in the plan are effective in controlling erosion and sediment. However, any VESCP authority may waive the certificate requirement for an agreement in lieu of a plan. The owner shall be given notice of the inspection. When the VESCP authority or the Board determines that there is a failure to comply with the conditions of land-disturbance approval or to obtain an approved plan or a land-disturbance approval prior to commencing land-disturbing activity, the VESCP authority or the Board may serve a notice to comply upon the owner or person responsible for carrying out the land-disturbing activity. Such notice to comply shall be served by delivery by facsimile, e-mail, or other technology; by mailing with confirmation of delivery to the address specified in the plan or land-disturbance application, if available, or in the land records of the locality; or by delivery at the site to a person previously identified to the VESCP authority by the owner. The notice to comply shall specify the measures needed to comply with the land-disturbance approval conditions or shall identify the plan approval or land-disturbance approval needed to comply with this article and shall specify a reasonable time within which such measures shall be completed. In any instance in which a required land-disturbance approval has not been obtained, the VESCP authority or the Board may require immediate compliance. In any other case, the VESCP authority or the Board may establish the time for compliance by taking into account the risk of damage to natural resources and other relevant factors. Notwithstanding any other provision in this subsection, a VESCP authority or the Board may count any days of noncompliance as days of violation should the VESCP authority or the Board take an enforcement action. The issuance of a notice to comply by the Board shall not be considered a case decision as defined in § 2.2-4001. Upon failure to comply within the time specified, any plan approval or land-disturbance approval may be revoked and the VESCP authority or the Board may pursue enforcement as provided by § 62.1-44.15:63.
B. Notwithstanding the provisions of subsection A, a VESCP authority is authorized to enter into agreements or contracts with districts, adjacent localities, or other public or private entities to assist with the responsibilities of this article, including but not limited to the review and determination of adequacy of erosion and sediment control plans submitted for land-disturbing activities as well as monitoring, reports, inspections, and enforcement.
C. Upon issuance of an inspection report denoting a violation of this section or § 62.1-44.15:55, in conjunction with or subsequent to a notice to comply as specified in subsection A, a VESCP authority or the Board may issue a stop work order requiring that all or part of the land-disturbing activities on the site be stopped until the specified corrective measures have been taken or, if land-disturbing activities have commenced without an approved plan as provided in § 62.1-44.15:55, requiring that all of the land-disturbing activities be stopped until an approved plan is obtained. When such an order is issued by the Board, it shall be issued in accordance with the procedures of the Administrative Process Act (§ 2.2-4000 et seq.). Where the alleged noncompliance is causing or is in imminent danger of causing harmful erosion of lands or sediment deposition in waters within the watersheds of the Commonwealth, or where the land-disturbing activities have commenced without an approved erosion and sediment control plan, such a stop work order may be issued whether or not the alleged violator has been issued a notice to comply as specified in subsection A. Otherwise, such an order may be issued only after the alleged violator has failed to comply with a notice to comply. The order for noncompliance with a plan shall be served in the same manner as a notice to comply, and shall remain in effect for seven days from the date of service pending application by the VESCP authority, the Board, or alleged violator for appropriate relief to the circuit court of the jurisdiction wherein the violation was alleged to have occurred or other appropriate court. The stop work order for disturbance without an approved plan shall be served upon the owner by mailing with confirmation of delivery to the address specified in the land records of the locality, shall be posted on the site where the disturbance is occurring, and shall remain in effect until such time as plan approvals are secured, except in such situations where an agricultural exemption applies. If the alleged violator has not obtained an approved erosion and sediment control plan within seven days from the date of service of the stop work order, the Board or the chief administrative officer or his designee on behalf of the VESCP authority may issue a subsequent order to the owner requiring that all construction and other work on the site, other than corrective measures, be stopped until an approved erosion and sediment control plan has been obtained. The subsequent order shall be served upon the owner by mailing with confirmation of delivery to the address specified in the plan or the land records of the locality in which the site is located. The owner may appeal the issuance of any order to the circuit court of the jurisdiction wherein the violation was alleged to have occurred or other appropriate court. Any person violating or failing, neglecting, or refusing to obey an order issued by the Board or the chief administrative officer or his designee on behalf of the VESCP authority may be compelled in a proceeding instituted in the circuit court of the jurisdiction wherein the violation was alleged to have occurred or other appropriate court to obey same and to comply therewith by injunction, mandamus, or other appropriate remedy. Upon completion and approval of corrective action or obtaining an approved plan, the order shall immediately be lifted. Nothing in this section shall prevent the Board or the chief administrative officer or his designee on behalf of the VESCP authority from taking any other action specified in § 62.1-44.15:63.
1973, c. 486, § 21-89.8; 1986, c. 328; 1988, cc. 694, 891, § 10.1-566; 1992, c. 298; 1993, c. 925; 2001, c. 490; 2003, c. 827; 2012, cc. 249, 785, 819; 2013, cc. 756, 793; 2016, cc. 68, 758; 2023, cc. 48, 49.
§ 62.1-44.15:58.1. Inspections; land-disturbing activities of natural gas pipelines; stop work instructions.A. The Department is authorized to conduct inspections of the land-disturbing activities of interstate and intrastate natural gas pipeline companies that have approved annual standards and specifications pursuant to § 62.1-44.15:55 as such land-disturbing activities relate to construction of any natural gas transmission pipeline equal to or greater than 24 inches inside diameter to determine (i) compliance with such annual standards and specifications, (ii) compliance with any site-specific plans, and (iii) if there have been or are likely to be adverse impacts to water quality as a result of such land-disturbing activities, including instances where (a) there has been a violation of any water quality standard adopted pursuant to the State Water Control Law (§ 62.1-44.2 et seq.), (b) sediment has been deposited in significant amounts in areas where those deposits are not contained by best management practices, (c) there are repeated instances of adverse impacts or likely adverse impacts within a 30-day period, or (d) there have been widespread and repeated instances of adverse impacts or likely impacts. When the Department determines that there has been a substantial adverse impact to water quality or that an imminent and substantial adverse impact to water quality is likely to occur as a result of such land-disturbing activities, the Department may issue a stop work instruction, without advance notice or hearing, requiring that all or part of such land-disturbing activities on the part of the site that caused the substantial adverse impacts to water quality or are likely to cause imminent and substantial adverse impacts to water quality be stopped until corrective measures specified in the stop work instruction have been completed and approved by the Department. Where substantial adverse impacts or likely adverse impacts are found on a repeated, frequent, and widespread basis, the Department may issue a stop work instruction for every work area in Virginia until the Department determines that any systemic cause that contributed to such occurrences has been corrected.
Such stop work instruction shall become effective upon service on the company by email or other technology agreed to in writing by the Department and the company, by mailing with confirmation of delivery to the address specified in the annual standards and specifications, if available, or by delivery at the site to a person previously identified to the Department by the company. Upon request by the company, the Director or his designee shall review such stop work instruction within 48 hours of issuance.
B. Within 10 business days of issuance of a stop work instruction, the Department shall promptly provide to such company an opportunity for an informal fact-finding proceeding concerning the stop work instruction and any review by the Director or his designee. Reasonable notice as to the time and place of the informal fact-finding proceeding shall be provided to such company. Within 10 business days of the informal fact-finding proceeding, the Department shall affirm, modify, amend, or cancel such stop work instruction. Upon written documentation from the company of the completion and approval by the Department in writing of the corrective measures specified in the stop work instruction, the instruction shall be immediately lifted.
C. The company may appeal such stop work instruction or preliminary decision rendered by the Director or his designee to the circuit court of the jurisdiction wherein the land-disturbing activities subject to the stop work instruction occurred, or to another appropriate court, in accordance with the requirements of the Administrative Process Act (§ 2.2-4000 et seq.). Any person violating or failing, neglecting, or refusing to obey a stop work instruction issued by the Department may be compelled in a proceeding instituted in the circuit court of the jurisdiction wherein the violation was alleged to have occurred or other appropriate court to obey same and to comply therewith by injunction, mandamus, or other appropriate remedy. Nothing in this section shall prevent the Board or the Department from taking any other action authorized by this chapter.
2018, c. 297; 2021, Sp. Sess. I, c. 277.
§ 62.1-44.15:59. Reporting.Each VESCP authority shall report to the Department, in a method such as an online reporting system and on a time schedule established by the Department, a listing of each land-disturbing activity for which a plan has been approved by the VESCP under this article.
2005, c. 102, § 10.1-566.1; 2012, cc. 785, 819; 2013, cc. 756, 793.
§ 62.1-44.15:60. Right of entry.In addition to the Board's authority set forth in § 62.1-44.20, a locality serving as a VESCP authority or any duly authorized agent thereof may, at reasonable times and under reasonable circumstances, enter any establishment or upon any property, public or private, for the purpose of obtaining information or conducting surveys or investigations necessary in the enforcement of the provisions of this article.
In accordance with a performance bond with surety, cash escrow, letter of credit, any combination thereof, or such other legal arrangement, a VESCP authority may also enter any establishment or upon any property, public or private, for the purpose of initiating or maintaining appropriate actions that are required by the conditions imposed by the VESCP authority on a land-disturbing activity when an owner, after proper notice, has failed to take acceptable action within the time specified.
2012, cc. 785, 819, § 10.1-566.2; 2013, cc. 756, 793; 2016, cc. 68, 758.
§ 62.1-44.15:61. Repealed.Repealed by Acts 2016, cc. 68 and 758, cl. 2, effective July 1, 2024.
§ 62.1-44.15:62. Judicial appeals.A. A final decision by a county, city, or town, when serving as a VESCP authority under this article, shall be subject to judicial review, provided that an appeal is filed within 30 days from the date of any written decision adversely affecting the rights, duties, or privileges of the person engaging in or proposing to engage in land-disturbing activities.
B. Final decisions of the Board shall be subject to judicial review in accordance with the provisions of the Administrative Process Act (§ 2.2-4000 et seq.).
1973, c. 486, § 21-89.10; 1986, c. 615; 1988, c. 891, § 10.1-568; 2012, cc. 785, 819; 2013, cc. 756, 793; 2016, cc. 68, 758.
§ 62.1-44.15:63. Penalties, injunctions and other legal actions.A. Any person who has violated or failed, neglected, or refused to obey any regulation or order of the Board, any order, notice, or requirement of the VESCP authority, any condition of a land-disturbance approval, or any provision of this article or associated regulation shall, upon a finding of an appropriate court, be assessed a civil penalty. If a locality serving as a VESCP authority has adopted a uniform schedule of civil penalties as permitted by subsection G of § 62.1-44.15:54, such assessment shall be in accordance with the schedule. The VESCP authority or the Board may issue a summons for collection of the civil penalty. In any trial for a scheduled violation, it shall be the burden of the Board or the VESCP authority to show the liability of the violator by a preponderance of the evidence. Any civil penalties assessed by a court shall be paid into the treasury of the locality wherein the land lies and are to be used solely for stormwater management capital projects, including (i) new stormwater best management practices; (ii) stormwater best management practice maintenance, inspection, or retrofitting; (iii) stream restoration; (iv) low-impact development projects; (v) buffer restoration; (vi) pond retrofitting; and (vii) wetlands restoration. Where the violator is the locality itself, or its agent, or where the Board is issuing the summons, the court shall direct the penalty to be paid into the state treasury and deposited by the State Treasurer into the Stormwater Local Assistance Fund established pursuant to § 62.1-44.15:29.1.
B. The VESCP authority, the Board, or the owner of property that has sustained damage or which is in imminent danger of being damaged may apply to the circuit court in any jurisdiction wherein the land lies or other appropriate court to enjoin a violation or a threatened violation under § 62.1-44.15:55 or 62.1-44.15:58 without the necessity of showing that an adequate remedy at law does not exist; however, an owner of property shall not apply for injunctive relief unless (i) he has notified in writing the person who has violated the VESCP, the Board, and the VESCP authority that a violation of the VESCP has caused, or creates a probability of causing, damage to his property, and (ii) neither the person who has violated the VESCP, the Board, nor the VESCP authority has taken corrective action within 15 days to eliminate the conditions that have caused, or create the probability of causing, damage to his property.
C. In addition to any civil penalties provided under this article, any person who violates any provision of this article may be liable to the VESCP authority or the Board, as appropriate, in a civil action for damages.
D. Without limiting the remedies that may be obtained in this section, any person violating or failing, neglecting, or refusing to obey any injunction, mandamus, or other remedy obtained pursuant to this section shall be subject, in the discretion of the court, to a civil penalty not to exceed $2,000 for each violation. A civil action for such violation or failure may be brought by the VESCP authority wherein the land lies or the Board. Any civil penalties assessed by a court shall be paid into the treasury of the locality wherein the land lies and used pursuant to requirements of subsection A. Where the violator is the locality itself, or its agent, or where the penalties are assessed as the result of an enforcement action brought by the Board, the court shall direct the penalty to be paid into the state treasury and deposited by the State Treasurer into the Stormwater Local Assistance Fund (§ 62.1-44.15:29.1).
E. With the consent of any person who has violated or failed, neglected, or refused to obey any regulation or order of the Board, any order, notice, or requirement of the VESCP authority, any condition of a land-disturbance approval, or any provision of this article or associated regulations, the Board, the Director, or VESCP authority may provide, in an order issued by the Board or VESCP authority against such person, for the payment of civil charges for violations in specific sums, not to exceed the limit specified in subsection D. Such civil charges shall be instead of any appropriate civil penalty that could be imposed under subsection A or D.
F. Upon request of a VESCP authority, the attorney for the Commonwealth shall take legal action to enforce the provisions of this article. Upon request of the Board, the Attorney General shall take appropriate legal action on behalf of the Board to enforce the provisions of this article.
1973, c. 486, § 21-89.11; 1988, cc. 694, 891, § 10.1-569; 1992, c. 298; 1993, c. 925; 1995, c. 832; 1996, c. 518; 2012, cc. 785, 819; 2013, cc. 756, 793; 2016, cc. 68, 758.
§ 62.1-44.15:64. Stop work orders by Board; civil penalties.A. An aggrieved owner of property sustaining pecuniary damage resulting from a violation of an approved erosion and sediment control plan or required land-disturbance approval, or from the conduct of land-disturbing activities commenced without an approved plan or required land-disturbance approval, may give written notice of the alleged violation to the VESCP authority and to the Board.
B. If the VESCP authority has not responded to the alleged violation in a manner that causes the violation to cease and abates the damage to the aggrieved owner's property within 30 days following receipt of the notice from the aggrieved owner, the aggrieved owner may request that the Board conduct an investigation and, if necessary, require the violator to stop the alleged violation and abate the damage to his property.
C. If the Board's investigation of the complaint indicates that (i) the VESCP authority has not responded to the alleged violation as required by the VESCP, (ii) the VESCP authority has not responded to the alleged violation within 30 days from the date of the notice given pursuant to subsection A, and (iii) there is a violation and it is necessary to require the violator to cease the violation as requested by the aggrieved owner, then the Board shall give written notice to the VESCP authority that the Board intends to issue an order pursuant to subsection D.
D. If the VESCP authority has not instituted action to stop the violation and abate the damage to the aggrieved owner's property within 10 days following receipt of the notice from the Board, the Board is authorized to issue an order requiring the owner, person responsible for carrying out an approved erosion and sediment control plan, or person conducting the land-disturbing activities without an approved plan or required land-disturbance approval to cease all land-disturbing activities until the violation of the plan has ceased or an approved plan and required land-disturbance approval are obtained, as appropriate, and specified corrective measures have been completed. The Board also may immediately initiate a program review of the VESCP.
E. Such orders are to be issued in accordance with the procedures of the Administrative Process Act (§ 2.2-4000 et seq.), and they shall become effective upon service on the person by mailing with confirmation of delivery, sent to his address specified in the land records of the locality, or by personal delivery by an agent of the Board. Any subsequent identical mail or notice that is sent by the Board may be sent by regular mail. However, if the Board finds that any such violation is grossly affecting or presents an imminent and substantial danger of causing harmful erosion of lands or sediment deposition in waters within the watersheds of the Commonwealth, it may issue, without advance notice or hearing, an emergency order directing such person to cease all land-disturbing activities on the site immediately and shall provide an opportunity for a hearing, after reasonable notice as to the time and place thereof, to such person, to affirm, modify, amend, or cancel such emergency order.
F. If a person who has been issued an order or emergency order is not complying with the terms thereof, the Board may institute a proceeding in the appropriate circuit court for an injunction, mandamus, or other appropriate remedy compelling the person to comply with such order.
G. Any person violating or failing, neglecting, or refusing to obey any injunction, mandamus, or other remedy obtained pursuant to subsection G shall be subject, in the discretion of the court, to a civil penalty not to exceed $2,000 for each violation. Any civil penalties assessed by a court shall be paid into the state treasury and deposited by the State Treasurer into the Stormwater Local Assistance Fund (§ 62.1-44.15:29.1).
1993, c. 925, § 10.1-569.1; 2012, cc. 785, 819; 2013, cc. 756, 793; 2016, cc. 68, 758.
§ 62.1-44.15:65. Authorization for more stringent ordinances.A. As part of a VESCP, a locality is authorized to adopt more stringent soil erosion and sediment control ordinances than those necessary to ensure compliance with the Board's regulations, provided that the more stringent ordinances are based upon factual findings of local or regional comprehensive watershed management studies or findings developed through the implementation of a locally adopted watershed management study and are determined by the locality to be necessary to prevent any further degradation to water resources, to address total maximum daily load requirements, to protect exceptional state waters, or to address specific existing water pollution including nutrient and sediment loadings, stream channel erosion, depleted groundwater resources, or excessive localized flooding within the watershed and that prior to adopting more stringent ordinances, a public hearing is held. Notice of such hearing shall be given by publication once a week for two consecutive weeks in a newspaper of general circulation in the locality seeking to adopt the ordinance, with the first publication appearing no more than 14 days before the hearing. The VESCP authority shall report to the Board when more stringent erosion and sediment control ordinances are determined to be necessary pursuant to this section. This process shall not be required when a VESCP authority chooses to reduce the threshold for regulating land-disturbing activities to a smaller area of disturbed land pursuant to § 62.1-44.15:55. This section shall not be construed to authorize any VESCP authority to impose any more stringent ordinances for land-disturbance review and approval than those specified in § 62.1-44.15:55.
B. Any provisions of an erosion and sediment control program in existence before July 1, 2012, that contains more stringent provisions than this article shall be exempt from the analysis requirements of subsection A.
1973, c. 486, § 21-89.12; 1988, c. 891, § 10.1-570; 2012, cc. 785, 819; 2013, cc. 756, 793; 2023, cc. 506, 507.
§ 62.1-44.15:66. No limitation on authority of Department of Energy.The provisions of this article shall not limit the powers or duties of the Department of Energy as they relate to mine reclamation under Chapters 10 (§ 45.2-1000 et seq.) and 12 (§ 45.2-1200 et seq.) of Title 45.2 or oil or gas exploration under the Virginia Gas and Oil Act (§ 45.2-1600 et seq.).
1973, c. 486, § 21-89.13; 1988, c. 891, § 10.1-571; 1996, c. 688; 2012, cc. 785, 819; 2013, cc. 47, 129, 756, 793; 2021, Sp. Sess. I, c. 532.